Kavish Jain

Project Manager at Johnson Health Tech. Co., Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
CA
Languages
  • English Professional working proficiency
  • Hindi Native or bilingual proficiency
  • French Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certificate of Completion Of Project
    National Aerospace Laboratories, Bangalore
    Jun, 2014
    - Nov, 2024

Experience

    • Taiwan
    • Wellness and Fitness Services
    • 300 - 400 Employee
    • Project Manager
      • Oct 2022 - Present

    • Project Installation specialist
      • May 2022 - Present

    • Canada
    • Motor Vehicle Manufacturing
    • 500 - 600 Employee
    • Junior Mechanical Engineer
      • Dec 2016 - Present

    • Quality Inspector
      • Jan 2016 - Present

      • In Process and Receiving Inspection of Components, Assemblies and Vehicles to established criteria and specifications• Maintain Inspection Records per Component, Assembly and Vehicle• Assist Project Quality Manager with Inspection Plan• Initiate appropriate Quality improvement actions in support of Project’s Quality objectives• Inspect components/assemblies to established criteria and specifications• Identify inspection status on components and assemblies • Initiate Non-conformance Reports for non compliant product• Verification of field modification and/or first article inspection requirements• Perform Supplier Source Inspection • Maintain Inspection Records, Unit History Documentation, Vehicle History books• Participate in Customer Joint Inspections• Use of micrometers, gauges, calipers, and other precision measuring equipment• Approve rework, waivers and dispositions• Identify supplier quality issues for resolution• Review past inspection data for critical information• Review receiving/process traveler for pertinent data• Preparation of Gantt charts, Pareto Diagram for analysis to achieve monthly objectives• Identify mislabelling, physical damages, sequential order, color coding of windshields• Identification and Reporting of welding, stamping, molding defects in assembly components Show less

    • Mechanical Engineering Research Intern
      • Jan 2014 - Jun 2014

      • Fabricated carbon fibre reinforced PPS composite material utilizing autoclave molding technique • Structural, static analysis of carbon-pps by conducting several mechanical strength tests and prepared technical reports for the advanced composite divisional Scientists • Dimensional analysis of fabricated composite material • Collected data, compiled reports and created database relevant to composite materials for use in preparation and processing of test materials • Conducted non-destructive evaluation utilizing Ultrasonic C Scan technology and testing of mechanical properties with carbon-PPS laminates • Conducted technical seminars and presented to committees of scientists, engineers, and leaders of other departments. Completed work resulted in a 5% reduction of total project expenditure • Successfully replaced aluminium by composite in the development and design of SARAS multipurpose civilian lightweight aircraft • Prepared estimates and production documents of the project • Compliance analysis of the test specimen and reporting of the project to the senior scientist • Numerical calculation of Applied stress and strain to determine tolerance level, factor of safety of the composite material Show less

    • India
    • Construction
    • 700 & Above Employee
    • Construction Supervisor
      • May 2013 - Aug 2013

      + Supervised on-site workers in excavator, crusher and rollers operation for building roads and pathways on lime and bauxite mines site + Ensured compliance of safety measures and managed operations associated with machinery and labor force + Project management of construction project through cost estimation and analysis of potential risks associated with deadline projection. Conducted progress reports to present to supervisors + Supervised on-site workers in excavator, crusher and rollers operation for building roads and pathways on lime and bauxite mines site + Ensured compliance of safety measures and managed operations associated with machinery and labor force + Project management of construction project through cost estimation and analysis of potential risks associated with deadline projection. Conducted progress reports to present to supervisors

Education

  • Concordia University
    Master of Engineering (M.Eng.), Mechanical Engineering
    2014 - 2016
  • Jain university,Bangalore
    Bachelor of Engineering (BE), Mechanical Engineering
    2010 - 2014

Community

You need to have a working account to view this content. Click here to join now