Mian Shakeel Ahmad

Senior Deputy Chief Electrical & Instrumentation at Jauharabad Sugar Mills Limited, Jauharabad
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Faisalabad, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Sugar and Confectionery Product Manufacturing
    • 1 - 100 Employee
    • Senior Deputy Chief Electrical & Instrumentation
      • Oct 2022 - Present

      Roles & Responsibilities:Supervision of all Pre-commissioning and Commissioning testing of all Electrical equipment’s like Switchgears, Transformers, Motors, Generators, Field instrumentation, Power and Control Cables, lighting etc. according to relevant codes and standards.Estimate and assign the resources such as Manpower, Materials, Equipments,tools etc. required for all electrical and related works prior to execution.Responsible to coordinate with suppliers for receiving shipments and related E&I material handling for the Power Plant Project.Interpret construction drawings and study the contract documents, applicable standards and specifications prior to execution of any jobs.Responsible to plan the execution of all Electrical related works and to co-ordinate the works with mechanical and civil groups.Responsible to co-ordinate (as client) with Consultant’s/Contractor’s representatives for any site instructions and inspection of works.Responsible to submit site daily progresss reports, inspection requests, estimates and all applicable monitoring reports on regular basis as required.Support the seniors and subordinates in accomplishing all the goals and targets for the electrical groups at site.Responsible to make sure that all the works done at site are in accordance with the approved construction drawings, contract documents, project specifications and all applicable standards whether local, national and international standards.Responsible for the safety of all Electrical groups, personnel of the project by ensuring that the project execution will be done according to all applicable HSE Health, Safety and Environmental standards.

    • Deputy Chief Electrical & Instrumentation
      • Oct 2017 - Nov 2022

      Electrical Power Generation, Distribution & Protection Systems:Power Transformer 12.5MVA Transformer ONAN/ONAF (5.25KV TO 11KV) Installation & commissioning along MR Products on Load Tape changer (OLTC)/AVR TAPCON 230 Basic.Boiler 60TPH control systems SIEMENS PCS7 (PLC S7-300 & S7-400).Erection, commissioning & operation of the Bagasse Fired Boiler 60 TPH, 110 Bar, and 525°C.Erection, commissioning & operation of the High pressure (HP) Steam Turbine 12 MW, 10000 rpm, 110 Bar, 525°C & Back Pressure and Erection, commission & operation of the Low pressure (LP) Steam Turbine pressure 03 MW, 5925 rpm, 2.2 Bar, 135°C & Condensate Mode.Installation & commission Generator 1500 rpm, 5.25KV with SIPROTEC 7UM62 Digital Grid (Siemens).AVR thyristor-based control systems92V DC & 1007 AMP for excitation Generator 15MW.SWITCHGEAR (SF6) on 5.25KV Bus Bar with 110 VT Control Volt & 2000 Amp Current Protection.Installation & commission Distribution of the Transformers 1600KVA (5.25KV TO 400V).Installation, commission & operation of the Generator Protection & Synchronization panels.Installation, commission & operation of the VFD’s on Feed Water Pumps 500 KW, FD FAN 160 KW, ID FAN 350 KW, Bagasse Feeders 7.5KW as well as RO Plant/water Treatment Plant.Diesel Generator Set 1250 KVA, Voltage output 415 V, MAKE ASKA.

    • United Kingdom
    • 1 - 100 Employee
    • Inspection Manager
      • Jul 2022 - Sep 2022

      260KW Solar Plant On Grid system 260KW Solar Plant On Grid system

    • Pakistan
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Deputy Manager Electrical & Instrumentation
      • Apr 2022 - Jul 2022

    • Qatar
    • Plastics Manufacturing
    • 700 & Above Employee
    • Automation & Control System
      • Feb 2020 - Mar 2020

      Worked with International Oil & Gas recruitment agency - BrunelTurnaround 2020 on Linear Low-Density Polyethylene (LLDPE) 450,000 MT/Y as an Instrument Team Leader.Preparing instrumentation data/checklist and parts to be replaced.Implemented to Perform safety tool box meeting.Implemented to Perform Hazard identified Risk Assessment.Troubleshooting, repairing, overhaul and calibration All kind of Control valves, Shutoff valves, Dp Transmitters, Pressure Transmitters, level Transmitter’s, Vibration Probe & other field instruments.

    • Assistant Engineer Electrical & Instrumentation
      • Jan 2017 - Oct 2017

      A keen Planner, Strategist & implementer with demonstrated abilities in Managing Entire E&I (Electrical, Automation and Instrumentation).Installation, Commissioning and Maintenance of DCS (SIEMENS PCS7, SUPCON China, NT6000 DEH+ETS, PLC (S7-200, S7-300, S7-500 Siemens).BENTLEY NEVADA 3500 Turbine monitoring (Protection) System.Installation, Commissioning and Maintenance of Two Coal Fired Boilers each 55 TPH, 5.3 MPa, 490°C.Installation, Commissioning and Maintenance of Steam Turbine 15MW, 3000 rpm, 4.9 MPa, Double Extraction & Condensate Mode.Installation, Commissioning and Maintenance of Instruments (Temperature, Flow, Level, Pressure Gauges & Transmitters, Control valves, Analyzers) etc.Erection and commissioning of area lighting, equipment lighting and street light poles up to 500W. Installation, Operation and Maintenance of Coal Handling, Coal Crushing & Conveying System, Lime stone Powder preparation.Installation, Operation and Maintenance of Boiler makeup water treatment plant, Cooling Tower & Circulating water system.HART & SMART (Protocol) compatible field and control Room instrumentation.Installation, Operation and Maintenance of Ignition Diesel Burner for Coal Fired Boiler startup.Before job consulting work procedure P&ID and preparation of job in sense of taking calibration or any other tools which required for that job.Involved with installation/calibration & commissioning of various types of instruments.Responsible for the safe and efficient maintenance of all associated equipment in accordance with manufacturer procedures, technical guidelines perspective and operating directives in effect.Troubleshooting Breakdown Maintenance, Preventive Maintenance, Periodic Maintenance (TBM) & Predictive Maintenance of SCD (Safety critical devices).

    • Pakistan
    • Chemical Manufacturing
    • 500 - 600 Employee
    • Instrument & Control
      • Dec 2011 - Dec 2016

      Consult manufacturer’s manual to determine test & maintenance procedure for instruments i.e. used for measuring & controlling Flow, Level, Pressure, Temperature and other variables in manufacturing and processing repair and adjust system components or remove and replace defective parts.Systems design, capacity limitation, modification, interface and implementation of process control solutions.Perform schedule preventive maintenance work and complete test and maintenance reports.Provides support services for all types of remote & local measuring and indicating equipment and systems.Equipment inspection, configuration, repairing and testing/troubleshooting of instrument & control system, diagnose fault takes remedy using precision testing devices to ensure smooth safe and sound operation.Responsible for the safe and efficient maintenance of all associated equipment in accordance with manufacturer procedures, technical guidelines perspective and operating directives in effect.Training of staff including Trainee Engineers, Supervisors, & trade workers.Implementing the work Instructions of ISO 9001 Quality Management System.Manages the plant’s operations, projects, and maintenance.Development of Sequence of Procedures (SOP) for maintenance of E&I equipment’s according to ISO Standards.E&I BOQ's, study of P&ID, Installation, Commissioning and MBO’s (Management by Objectives)Installation and testing of Earthing, Structural Grounding & Lightning Arrester system of whole plant.

    • Pakistan
    • Textile Manufacturing
    • 200 - 300 Employee
    • Trainee
      • Jul 2011 - Nov 2011

Education

  • University of Engineering and Technology, Lahore
    Engineer's degree, Electrical (Power)
    2012 - 2016

Community

You need to have a working account to view this content. Click here to join now