Josh Weavers

Process Engineer at Pan Pac Forest Products Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Hastings, Hawke’s Bay, New Zealand, NZ
Languages
  • French -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • ACUC Open Water Diver
    American Canadian Underwater Certifications
    Sep, 2010
    - Nov, 2024

Experience

    • New Zealand
    • Paper and Forest Product Manufacturing
    • 100 - 200 Employee
    • Process Engineer
      • Jun 2020 - Present

    • Sales Consultant and Leasing Retention Manager
      • Jan 2019 - May 2019

    • Canada
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Quality Co-ordinator
      • Feb 2016 - Nov 2018

      Worked in a supporting role to operations, covering three drycast paver plants in southwestern Ontario. Responsibilities included: providing quality control training to plant employees, assisting plant managers to conform with company's quality program, analysis of lab results and quality issues, auditing other plants against the company's quality program, creating concrete mix designs. Assisted Quality Manager in conducting quality audits for other plants in 2017, then conducted them independently in 2018. Achieved significant increases in audit scores at my plants, took a leading role in new product introduction and product transfers as well as quality related projects. Finally, considered cost saving options, presented my ideas to the VP of Operations, and oversaw the implementation of those that were approved.

    • India
    • Renewable Energy Semiconductor Manufacturing
    • 100 - 200 Employee
    • Engineering Field Intern
      • Aug 2014 - Dec 2014

      Full-time on site presence for SunEdison on solar farm construction site. Liaised with contractor foremen, tracked site progress, performed quality checks, reported to Engineering Field Managers. Helped ensure that project was delivered on time and was built properly. Full-time on site presence for SunEdison on solar farm construction site. Liaised with contractor foremen, tracked site progress, performed quality checks, reported to Engineering Field Managers. Helped ensure that project was delivered on time and was built properly.

    • Canada
    • Wholesale Building Materials
    • Laboratory Assistant
      • Nov 2013 - Jan 2014

      Prepared and analysed gypsum borehole samples. Modeled estimated gypsum locations based on samples. Refined method to test paper pull strength of drywall board. Set up custom process for customer requested testing. Prepared and analysed gypsum borehole samples. Modeled estimated gypsum locations based on samples. Refined method to test paper pull strength of drywall board. Set up custom process for customer requested testing.

    • Assistant Supervisor
      • Jun 2013 - Sep 2013

      Assisted in supervision of the production line. Covered several weeks worth of shifts as acting Supervisor. Performed some duties to aid Quality department. Designed and put in motion the implementation of an organizational system for spare parts while co-operating with Maintenance Supervisor. Assisted in supervision of the production line. Covered several weeks worth of shifts as acting Supervisor. Performed some duties to aid Quality department. Designed and put in motion the implementation of an organizational system for spare parts while co-operating with Maintenance Supervisor.

    • Canada
    • Wholesale Building Materials
    • 1 - 100 Employee
    • ERP Implementation Specialist
      • Aug 2012 - Dec 2012

      Assist in implementation of Lawson database after acquisition of new companies, in order to integrate them into Permacon. Data transfer between physical documents, Excel spreadsheets and Lawson database. Measurements and data preparation for new process at Milton plant. Assist in implementation of Lawson database after acquisition of new companies, in order to integrate them into Permacon. Data transfer between physical documents, Excel spreadsheets and Lawson database. Measurements and data preparation for new process at Milton plant.

    • Canada
    • Aviation and Aerospace Component Manufacturing
    • 700 & Above Employee
    • Co-op Student - Design for Environment
      • Jan 2012 - Apr 2012

      Evaluate and catalog materials used in Bombardier products, compile environmental documentation and preparation of reports and Environmental Product Declarations. Evaluation of materials and products to ensure compliance to relevant legislation, including Bombardier and customer requirements, completion of material inventories, participate in external environmental networks, and promote the environmental performance of Bombardier's products. Evaluate and catalog materials used in Bombardier products, compile environmental documentation and preparation of reports and Environmental Product Declarations. Evaluation of materials and products to ensure compliance to relevant legislation, including Bombardier and customer requirements, completion of material inventories, participate in external environmental networks, and promote the environmental performance of Bombardier's products.

    • Canada
    • Higher Education
    • 700 & Above Employee
    • Research Assistant
      • May 2011 - Aug 2011

      Monitored waste water pilot plant on a daily basis, worked independently and reported to the masters student who was running the pilot plant for her thesis. Collected data, mainly pH and dissolved oxygen, and made minor repairs when necessary, or sought help from Frito Lay mechanics or from the University where required. Monitored waste water pilot plant on a daily basis, worked independently and reported to the masters student who was running the pilot plant for her thesis. Collected data, mainly pH and dissolved oxygen, and made minor repairs when necessary, or sought help from Frito Lay mechanics or from the University where required.

    • Canada
    • Environmental Services
    • 1 - 100 Employee
    • Lifeguard
      • May 2010 - Sep 2010

      Full time lifeguard at water park. Full time lifeguard at water park.

Education

  • University of Waterloo
    Bachelor of Applied Science (BASc), Chemical Engineering
    2010 - 2015
  • Lester B. Pearson High School
    Ontario High School Diploma
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now