Ryan Tripp

Mechanical Construction Lead at Singleton Engineering Solutions
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cashmere, Queensland, Australia, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Mining
    • 1 - 100 Employee
    • Mechanical Construction Lead
      • Jan 2020 - Present

    • United States
    • Business Consulting and Services
    • 1 - 100 Employee
    • SMP Superintendent
      • Jul 2019 - Jan 2020

    • Australia
    • Civil Engineering
    • 700 & Above Employee
    • SMP Supervisor (Piping)
      • Jan 2018 - Jun 2019

    • Oil and Gas
    • 700 & Above Employee
    • Leading Hand Pipe Fitter Night Shift
      • Apr 2017 - Jan 2018

      • Big bore piping ( up to 72” ) on the Compressor • Flange management • Leading a crew of 14 Pipe fitters • Big bore piping ( up to 72” ) on the Compressor • Flange management • Leading a crew of 14 Pipe fitters

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Piping Supervisor
      • Jan 2016 - Mar 2017

      • Pipe fitting of Carbon and Stainless pipe in all schedules, in modules and stick built • Tack welding of bullets when doing pipe fit ups to suit welding procedures • Interpreting ISO Drawings and P&ID’s • Flange management to Hydratight specifications, Hand Torque and Tension • Managing small crews of pipe fitters • Punchlisting of sub systems • Pipe fitting of Carbon and Stainless pipe in all schedules, in modules and stick built • Tack welding of bullets when doing pipe fit ups to suit welding procedures • Interpreting ISO Drawings and P&ID’s • Flange management to Hydratight specifications, Hand Torque and Tension • Managing small crews of pipe fitters • Punchlisting of sub systems

    • Australia
    • Construction
    • 1 - 100 Employee
    • SMP Piping Supervisor
      • Nov 2014 - Jan 2016

      • Pre-Commissioning, testing and commissioning training and mentoring teams of 50 workers • Live mine site, Permit holder and Shutdown experience • Ensuring safety processes and deadlines meet – No Injuries • Pre-Commissioning, testing and commissioning training and mentoring teams of 50 workers • Live mine site, Permit holder and Shutdown experience • Ensuring safety processes and deadlines meet – No Injuries

    • Mining
    • 700 & Above Employee
    • Pipe Fitter
      • May 2014 - Nov 2014

      • Stainless steel and carbon steel up to 42" in diameter • Flange assembly, hand torquing and hydraulic bolt tensioning • Fabrication and altering of structural steel and grid mesh – No Injuries. • Stainless steel and carbon steel up to 42" in diameter • Flange assembly, hand torquing and hydraulic bolt tensioning • Fabrication and altering of structural steel and grid mesh – No Injuries.

  • Independent Container Service (ICS)
    • Fisherman’s Is. Port of Brisbane
    • Boiler Maker / Welder
      • Mar 2007 - May 2014

      • Pipe fitting • All repairs and modifications of shipping containers (20ft and 40ft) • Structural welding (GMAW), Oxy cutting, sheet metal work, spray painting • Grinding and prepping of welds – No Injuries • Pipe fitting • All repairs and modifications of shipping containers (20ft and 40ft) • Structural welding (GMAW), Oxy cutting, sheet metal work, spray painting • Grinding and prepping of welds – No Injuries

Education

  • Pine Rivers State High School
    1991 - 1995

Community

You need to have a working account to view this content. Click here to join now