Ahsan I.

Electrical Engineer - Engineering & Facility Development at AlQahtani Pipe Coating Industries
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saudi Arabia, SA
Languages
  • Punjabi Full professional proficiency
  • Urdu Full professional proficiency
  • English Full professional proficiency
  • Arabic Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Saqib Zaidi

Ahsan is the who can be trusted. He is dedicated, result oriented & can manage extremely difficult situations well. I have worked with Ahsan years ago, we have a lot of good memories, he has a very polite personality who listens to the people and adapt changes as they are needed.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Level 3 Award in First Aid, HABC UK.
    HIGHFIELD AWARDING BODY FOR COMPLIANCE LIMITED
    Apr, 2019
    - Nov, 2024
  • Oil Pipeline Inspection & Integrity
    UNI Strategic
    May, 2012
    - Nov, 2024
  • Certification from Electrical Engineer
    Saudi Council of Engineers
    Sep, 2013
    - Nov, 2024
  • Registered engineer
    Pakistan Engineering Council
    Jul, 2017
    - Nov, 2024

Experience

    • Saudi Arabia
    • Oil and Gas
    • 100 - 200 Employee
    • Electrical Engineer - Engineering & Facility Development
      • Mar 2013 - Present

      1) Design LV & MV electrical systems of residential and industrial construction projects, which includes designing power flow, lighting, power & earthing and metering, panel & cables lists, fire alarm, telephone & ethernet system. 2) Review & finalize contractor shop drawings. 3) Work out specifications & BOQ of tasks, material, manpower for pricing. 4) Prepare project plan & budgetary cost of project. 5) Review vendor & contractor bids and finalize with project team. 6) Supervise site works, purchasing, & receiving inspection at site. 7) Perform FAT (Factory Acceptance Tests) and SAT (Site acceptance tests). 8) Perform QC at site for completed installations and prepare punch list as per NEC, NFPA, IEC, SDMS code. 9) Prepare work scope, BOQ and drawings for any alterations in Al-Qahtani Pipe Coating Industry plants and implement Control of Change Process. Project works 10) Designed drawings, installed, tested & commissioned 6MW genset room of Al-Qahtani PCK pipe factory, Dammam-Riyadh highway. Supervised site for installation, testing & commissioning of panelboards, cables, lightings, fire alarm & data systems of factory. Also provided technical support to client in acquiring API & civil defense certifications of factory. 11) Commissioned 13.8kV substation at Dhahran-Jubail highway. Energized, tested & commissioned 13.8kV switchgears in coordination with Saudi Electricity Co. 12) Field installation & commissioning of 1500kVAR power factor panel on 460V Transformer, and field installation of 3MW low frequency induction heater and 2MW phase balancer at epoxy coating plant of Al-Qahtani Pipe Coating Industry. 13) Installed & commissioned of VFDs on reclaims conveyor gearboxes of Concrete Weight Coating plant. Show less

    • Pakistan
    • Oil and Gas
    • 1 - 100 Employee
    • Lead Electrical Engineer - Operations & Technical Services
      • Apr 2011 - Dec 2012

      1) Lead electrical & instrumentation works and provided round the clock engineering & maintenance services to ensure effective oil handling at terminal. 2) Prepared annual OPEX & CAPEX budgets. 3) Managed maintenance tasks by planning resources efficiently to reduce operation downtime. 4) Shift in-charge for 18 months and ensured no lost-time-injury (LTI) in operations. Project Works 1) Installation Testing & commissioning of 11KV cable from KESC grid to substation. 2) Installation , testing & commissioning solar PV lights. 3) Installation, testing & commissioning of mooring motor and oil level indicators. Show less

    • Germany
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Executive Engineer - Design & Production
      • Dec 2008 - Mar 2011

      1) Designed and lead design reviews for SIEMENS SIVACON 8PT & 8PU panels, from concept to final production of different projects. 2) Created general assembly drawings of these projects including BOQ, detail drawings of component assembly, on SIMARIS tool and wiring schematics & terminal on ELCAD. Also supervised draftsmen in design & other capacities. 3) Implemented in-process inspection (IPI), clarified drawing ambiguities of production workers during fabrication & organized factory acceptance test (FAT). 4) Provided engineering support to sales for tendering, to quality assurance & regulatory dept. for product and process compliance, to achieve sales turnovers. 5) Provided support to automation department for S7-300 PLC programming of relay control panels Show less

    • Oil and Gas
    • 300 - 400 Employee
    • Graduate Trainee Engineer
      • Mar 2007 - Nov 2008

      1) Managed daily and preventive maintenance activities of refinery equipment. 2) Provided technical assistance for future projects of refinery by drawing review and review of specs of material & equipment. 3) Co-executed, tested & commissioned auto-changeover of 1.8MVA genset and upgraded auto-transfer switch of 630KVA genset to improve plant backup power. 1) Managed daily and preventive maintenance activities of refinery equipment. 2) Provided technical assistance for future projects of refinery by drawing review and review of specs of material & equipment. 3) Co-executed, tested & commissioned auto-changeover of 1.8MVA genset and upgraded auto-transfer switch of 630KVA genset to improve plant backup power.

Education

  • NED University of Engineering and Technology
    BE-Electrical, Power and Energy
    2003 - 2006
  • DJ Sind Govt Science College Karachi Pakistan
    Pre Engineering, Electrical Power
    2000 - 2002
  • Happy Home English Secondary School
    Matric, Science
    1988 - 2000

Community

You need to have a working account to view this content. Click here to join now