Eduardo Kenji Nakashima

Project Manager at H&MV Engineering
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Dublin, IE
Languages
  • Portuguese Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Henrique Borduqui

Eduardo is a good person and professional. He is able to see the big picture, knows how to explore the tasks which helps him to present good solutions. He is really good with technologies. It was a pleasure to work with him. He really makes a difference in a team.

Paulo Prudente

Conheci o Nakashima na Elektro. Excelente pessoa e profissional sério e competente. E desde lá, pude ver que investiu muito em si mesmo para ser um profissional de ponta.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Procore Certified: Subcontractor
    Procore Technologies
    Jul, 2022
    - Nov, 2024
  • Information Management Practitioner
    Operam Academy
    Mar, 2022
    - Nov, 2024
  • Using Python for Automation
    LinkedIn
    Jun, 2020
    - Nov, 2024
  • BIM Manager: Managing CAD Standards
    LinkedIn
    May, 2019
    - Nov, 2024
  • Honours Bachelor Degree in Electrical Engineering
    CREA-SP
    Feb, 2008
    - Nov, 2024

Experience

    • Ireland
    • Construction
    • 300 - 400 Employee
    • Project Manager
      • Jan 2023 - Present

      • Overall planning, coordination, and execution of the project. • Managing Scope, Program, Budget, Risks, and Communications to ensure the project meets all technical and safety requirements. • Liaison with clients, suppliers, providers, and teams through project planning, design, and construction.

    • BIM
      • May 2021 - Mar 2023

      3D and 2D modelling with BIM documentation to support on CSA and MEP design and coordination to Substations, Switchgear and Control buildings projects. Standardisation of procedures with rollout levelling training.

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Graduate Engineer
      • Mar 2019 - Apr 2021

      • Worked on a variety of projects in all stages of development, including residential, commercial, industrial, and critical high-availability projects. • Responsibilities included: o Surveying and liaising with ESB and Eircom on diversions and connectivity applications. o Developing electrical building services, including modelling, calculations, design, and specifications for:  Lighting (public/private, external/internal, general/emergency)  Fire detection alarm… Show more • Worked on a variety of projects in all stages of development, including residential, commercial, industrial, and critical high-availability projects. • Responsibilities included: o Surveying and liaising with ESB and Eircom on diversions and connectivity applications. o Developing electrical building services, including modelling, calculations, design, and specifications for:  Lighting (public/private, external/internal, general/emergency)  Fire detection alarm system  Communication (ICT) systems (EIR and Virgin specifications, ducting and chambers)  General services and power distribution (cable routes and containments, switchboard, and metering panels) o Using REVIT, CAD, Dialux, Relux, and Outdoor Reality for modelling and reporting o Conducting BCAR inspections and reports Show less • Worked on a variety of projects in all stages of development, including residential, commercial, industrial, and critical high-availability projects. • Responsibilities included: o Surveying and liaising with ESB and Eircom on diversions and connectivity applications. o Developing electrical building services, including modelling, calculations, design, and specifications for:  Lighting (public/private, external/internal, general/emergency)  Fire detection alarm… Show more • Worked on a variety of projects in all stages of development, including residential, commercial, industrial, and critical high-availability projects. • Responsibilities included: o Surveying and liaising with ESB and Eircom on diversions and connectivity applications. o Developing electrical building services, including modelling, calculations, design, and specifications for:  Lighting (public/private, external/internal, general/emergency)  Fire detection alarm system  Communication (ICT) systems (EIR and Virgin specifications, ducting and chambers)  General services and power distribution (cable routes and containments, switchboard, and metering panels) o Using REVIT, CAD, Dialux, Relux, and Outdoor Reality for modelling and reporting o Conducting BCAR inspections and reports Show less

  • Klockner Moeller Ireland Ltd
    • County Dublin, Ireland
    • Electrical Project Engineer
      • Apr 2018 - Feb 2019

      ● Carried out the development of LV distribution switchgear panels, from design to delivery, regarding all customer requirements and was aware of keeping track of all assets and stakeholders (electricians, engineers, manager, sponsor, and suppliers). ● Developed quotation model tool through process mapping and standardisation list of materials and services, which improved time response whilst maximising accuracy on project estimation costs and prices. ● Liaised with suppliers and internal… Show more ● Carried out the development of LV distribution switchgear panels, from design to delivery, regarding all customer requirements and was aware of keeping track of all assets and stakeholders (electricians, engineers, manager, sponsor, and suppliers). ● Developed quotation model tool through process mapping and standardisation list of materials and services, which improved time response whilst maximising accuracy on project estimation costs and prices. ● Liaised with suppliers and internal teams to manage stock and production lines. Show less ● Carried out the development of LV distribution switchgear panels, from design to delivery, regarding all customer requirements and was aware of keeping track of all assets and stakeholders (electricians, engineers, manager, sponsor, and suppliers). ● Developed quotation model tool through process mapping and standardisation list of materials and services, which improved time response whilst maximising accuracy on project estimation costs and prices. ● Liaised with suppliers and internal… Show more ● Carried out the development of LV distribution switchgear panels, from design to delivery, regarding all customer requirements and was aware of keeping track of all assets and stakeholders (electricians, engineers, manager, sponsor, and suppliers). ● Developed quotation model tool through process mapping and standardisation list of materials and services, which improved time response whilst maximising accuracy on project estimation costs and prices. ● Liaised with suppliers and internal teams to manage stock and production lines. Show less

    • Brazil
    • Utilities
    • 700 & Above Employee
    • Research And Development Project Engineer
      • Jun 2012 - May 2016

      ● Evaluated techno-economic feasibility for thermoelectric power plant through analyses on energy-price-market dynamics and technical and commercial arrangements over 16,000 forecasted probabilities to reduce cost of consumed energy cost by 75% depending on how much energy will be produced ● Developed a calculator toll to preview income losses on unavailability of each part in the Transmission Substation, inputting critical data to monthly accountability and billing processes ● Audited… Show more ● Evaluated techno-economic feasibility for thermoelectric power plant through analyses on energy-price-market dynamics and technical and commercial arrangements over 16,000 forecasted probabilities to reduce cost of consumed energy cost by 75% depending on how much energy will be produced ● Developed a calculator toll to preview income losses on unavailability of each part in the Transmission Substation, inputting critical data to monthly accountability and billing processes ● Audited, improved and commissioned processes control system by mapping processes, identifying gaps, fixing functions and calculations and documents decluttering to effectively manage it. i.e. avoided penalties in environmental and R&D projects management ● Developed operational reports by standardisation of 62 disbursements and technical processes of 6 subsidiary hydroelectric power plants and approaching of multidisciplinary teams to headquarter management ● Evolved feasibility analysis model of hydroelectric businesses by processes mapping and tender documentation analyses supported with the whole team to success explore power generation cases ● Identified opportunity to tax payment reduction, annual data-mining and reporting of innovative projects which increased tax-credit allowance by €1 million in investment documented ● Developed €3 million budget projects with multidisciplinary team for 16 projects evaluate and decide with stakeholders and sponsors ● Developed Management System to control Portfolio to 9 agents and 50 projects to the headquarter management ● Managed payments on the multi-technologies photovoltaic project to ensure the established targets were attained ● Studied bath and microgeneration and storage techs: solar, wind, hydro, ocean, plasma, fuel cells, motors and turbines, pumped storage, batteries and fuels (Coal, Gas, Briquettes), electric cars as also best practices to be aware of opportunities in HVAC, LVAC, HVDC and LVDC Show less ● Evaluated techno-economic feasibility for thermoelectric power plant through analyses on energy-price-market dynamics and technical and commercial arrangements over 16,000 forecasted probabilities to reduce cost of consumed energy cost by 75% depending on how much energy will be produced ● Developed a calculator toll to preview income losses on unavailability of each part in the Transmission Substation, inputting critical data to monthly accountability and billing processes ● Audited… Show more ● Evaluated techno-economic feasibility for thermoelectric power plant through analyses on energy-price-market dynamics and technical and commercial arrangements over 16,000 forecasted probabilities to reduce cost of consumed energy cost by 75% depending on how much energy will be produced ● Developed a calculator toll to preview income losses on unavailability of each part in the Transmission Substation, inputting critical data to monthly accountability and billing processes ● Audited, improved and commissioned processes control system by mapping processes, identifying gaps, fixing functions and calculations and documents decluttering to effectively manage it. i.e. avoided penalties in environmental and R&D projects management ● Developed operational reports by standardisation of 62 disbursements and technical processes of 6 subsidiary hydroelectric power plants and approaching of multidisciplinary teams to headquarter management ● Evolved feasibility analysis model of hydroelectric businesses by processes mapping and tender documentation analyses supported with the whole team to success explore power generation cases ● Identified opportunity to tax payment reduction, annual data-mining and reporting of innovative projects which increased tax-credit allowance by €1 million in investment documented ● Developed €3 million budget projects with multidisciplinary team for 16 projects evaluate and decide with stakeholders and sponsors ● Developed Management System to control Portfolio to 9 agents and 50 projects to the headquarter management ● Managed payments on the multi-technologies photovoltaic project to ensure the established targets were attained ● Studied bath and microgeneration and storage techs: solar, wind, hydro, ocean, plasma, fuel cells, motors and turbines, pumped storage, batteries and fuels (Coal, Gas, Briquettes), electric cars as also best practices to be aware of opportunities in HVAC, LVAC, HVDC and LVDC Show less

    • Brazil
    • Software Development
    • 100 - 200 Employee
    • Product Analyst
      • Dec 2010 - Nov 2011

      ● Represented customer needs and expectations during Software Development SCRUM daily meetings by bringing experiences as potential client and building strong connections with current product customers regarding attend and exceed their expectations ● Specified screens layout and behaviour of calculations and functions to international integrated telemetric system of energy and environment measures strive to succeed a smooth experience in using it ● Supported customers to understand how… Show more ● Represented customer needs and expectations during Software Development SCRUM daily meetings by bringing experiences as potential client and building strong connections with current product customers regarding attend and exceed their expectations ● Specified screens layout and behaviour of calculations and functions to international integrated telemetric system of energy and environment measures strive to succeed a smooth experience in using it ● Supported customers to understand how automated alarms works and about the smart quantitative analysis by phone, email and presentation in event made clear and transparency to the client ● Created mathematics methods to identify irregular behaviour measures on real-time smart analyser of trending through the telemetric system optimising client time to data quality analyses ● Researched and delivered technical reports to the client about trend technologies to renewable and distributed generation (hydro, thermal, solar and wind) and smart grid (automation and communications on switchgears and reclosers and meters) and smart metering (communication systems, technologies and applications) and electric vehicles (market, recharging, uses and feasibility) and energy storage (inertia, hydro, air, chemistry, thermal) Show less ● Represented customer needs and expectations during Software Development SCRUM daily meetings by bringing experiences as potential client and building strong connections with current product customers regarding attend and exceed their expectations ● Specified screens layout and behaviour of calculations and functions to international integrated telemetric system of energy and environment measures strive to succeed a smooth experience in using it ● Supported customers to understand how… Show more ● Represented customer needs and expectations during Software Development SCRUM daily meetings by bringing experiences as potential client and building strong connections with current product customers regarding attend and exceed their expectations ● Specified screens layout and behaviour of calculations and functions to international integrated telemetric system of energy and environment measures strive to succeed a smooth experience in using it ● Supported customers to understand how automated alarms works and about the smart quantitative analysis by phone, email and presentation in event made clear and transparency to the client ● Created mathematics methods to identify irregular behaviour measures on real-time smart analyser of trending through the telemetric system optimising client time to data quality analyses ● Researched and delivered technical reports to the client about trend technologies to renewable and distributed generation (hydro, thermal, solar and wind) and smart grid (automation and communications on switchgears and reclosers and meters) and smart metering (communication systems, technologies and applications) and electric vehicles (market, recharging, uses and feasibility) and energy storage (inertia, hydro, air, chemistry, thermal) Show less

    • Utilities
    • 700 & Above Employee
    • Electrical Software Migration Engineer
      • Jul 2009 - Dec 2010

      ● Specified and tested the new system of CPFL Group for technical analysis (power flow, capacity and losses) over their electrical distribution network to supply over 7 million clients ● Supported project achievement of data migration of distributed assets (transformers, reclosers, switchgears, cables, customers) into the georeferenced database system (GIS) checking risks and collaborating in action plans ● Assisted project manager with project plans reviews and accomplished the migration… Show more ● Specified and tested the new system of CPFL Group for technical analysis (power flow, capacity and losses) over their electrical distribution network to supply over 7 million clients ● Supported project achievement of data migration of distributed assets (transformers, reclosers, switchgears, cables, customers) into the georeferenced database system (GIS) checking risks and collaborating in action plans ● Assisted project manager with project plans reviews and accomplished the migration project targets on time

    • Network Planning Engineer
      • Aug 2008 - Jun 2009

      ● Drove the implementation and sustained systems for monthly reporting about technical losses (high, medium and low voltage from RGE’s network), including calculations and measurements data collectors ● Managed outsourced software development consultants to successfully achieved project deliveries schedule ● Improved agility of planning feeder network process from 3 weeks to one week through mapping processes and developing auxiliary systems and automated procedures to collect technical… Show more ● Drove the implementation and sustained systems for monthly reporting about technical losses (high, medium and low voltage from RGE’s network), including calculations and measurements data collectors ● Managed outsourced software development consultants to successfully achieved project deliveries schedule ● Improved agility of planning feeder network process from 3 weeks to one week through mapping processes and developing auxiliary systems and automated procedures to collect technical data from 2 sources to the Network Planning Power Flow Calculation System (Interplan) ● Developed and commissioned automated system to emulate human repetitive work on computer using AutoHotKey and Visual Basic Programming ● Created a Research and Development Project to develop a High Voltage Network Planning System considering Multiple Distributed Power Generators to improve the accuracy of calculations

    • Processes Control Consultant
      • Jul 2008 - Aug 2008

      ● Mapped reverse logistics work and data flows in B2W (head office and distribution site of sales websites: Submarino.com; Shoptime.com; Americanas.com) to identify gaps and developed action plans ● Automatized (from daily 4 hours to one hour to hold up-to-date) and improved daily management reports of reverse logistics with easily understandable graphics reports and reduction of multiple sources to just one ● Mapped reverse logistics work and data flows in B2W (head office and distribution site of sales websites: Submarino.com; Shoptime.com; Americanas.com) to identify gaps and developed action plans ● Automatized (from daily 4 hours to one hour to hold up-to-date) and improved daily management reports of reverse logistics with easily understandable graphics reports and reduction of multiple sources to just one

    • Brazil
    • Utilities
    • 700 & Above Employee
    • Energy Metering and Losses Analyst
      • Apr 2004 - Apr 2008

      ● Researched continuously innovations on technologies, systems and techniques to identification of energy pilferage including optical fibre, quality meter, seals, micro drillers, drones, metal detector, measures comparator, field gauge ● Mapped and cared out of correlative-process interactions and influences in losses reduction such as billing and payment and non-payment management by strong relationship building and communications abilities ● Developed and implemented predictive… Show more ● Researched continuously innovations on technologies, systems and techniques to identification of energy pilferage including optical fibre, quality meter, seals, micro drillers, drones, metal detector, measures comparator, field gauge ● Mapped and cared out of correlative-process interactions and influences in losses reduction such as billing and payment and non-payment management by strong relationship building and communications abilities ● Developed and implemented predictive maintenance engineering on metering assets through smart quantitative and qualitative research in batch analyses and influence to prevent and minimize energy losses ● Created and commissioned web software on Crystal Reports to report daily updated results of yearly investments of €35 million in program to reduce energy losses in company’s distribution network, reduced monthly full-time effort of an experienced engineer to automated system with SQL and Oracle ● Developed of Intelligence software tool to analyse energy consumption behaviour of 2 million low voltage customers directing inspections what improve finding effectiveness index from 5% to 14% ● Built on MS Access the system to analyse Low Voltage meters lots, checking systemic losses from ageing and abrasion or project failure, which started a replacement program with finding effectiveness index of 70% Show less ● Researched continuously innovations on technologies, systems and techniques to identification of energy pilferage including optical fibre, quality meter, seals, micro drillers, drones, metal detector, measures comparator, field gauge ● Mapped and cared out of correlative-process interactions and influences in losses reduction such as billing and payment and non-payment management by strong relationship building and communications abilities ● Developed and implemented predictive… Show more ● Researched continuously innovations on technologies, systems and techniques to identification of energy pilferage including optical fibre, quality meter, seals, micro drillers, drones, metal detector, measures comparator, field gauge ● Mapped and cared out of correlative-process interactions and influences in losses reduction such as billing and payment and non-payment management by strong relationship building and communications abilities ● Developed and implemented predictive maintenance engineering on metering assets through smart quantitative and qualitative research in batch analyses and influence to prevent and minimize energy losses ● Created and commissioned web software on Crystal Reports to report daily updated results of yearly investments of €35 million in program to reduce energy losses in company’s distribution network, reduced monthly full-time effort of an experienced engineer to automated system with SQL and Oracle ● Developed of Intelligence software tool to analyse energy consumption behaviour of 2 million low voltage customers directing inspections what improve finding effectiveness index from 5% to 14% ● Built on MS Access the system to analyse Low Voltage meters lots, checking systemic losses from ageing and abrasion or project failure, which started a replacement program with finding effectiveness index of 70% Show less

    • Maintenance and Applications Technician
      • Jan 2004 - Apr 2004

      • Installed command cables and level sensors and connections in a programmable logic controller automated system into water pumps on a building site. • Installed cables and push button commands during retrofitting of a CNC lathe • Installed command cables and level sensors and connections in a programmable logic controller automated system into water pumps on a building site. • Installed cables and push button commands during retrofitting of a CNC lathe

    • Brazil
    • Oil and Gas
    • 700 & Above Employee
    • Electrical and Electronical Technician Intern
      • Mar 2003 - Dec 2003

      • Experienced issues lived in field services operational such as hard ergonomic positions, an average of 100km distance from base, hard access and roads on weekly trips to work and teamwork • Carried out preventive maintenance in substation stationary battery banks and electro mechanic oscilloperturbographs, electronic thermometers, • Learnt and carried out corrective maintenance on 12V DC and 24V DC and 48V DC energy panel fonts • Experienced issues lived in field services operational such as hard ergonomic positions, an average of 100km distance from base, hard access and roads on weekly trips to work and teamwork • Carried out preventive maintenance in substation stationary battery banks and electro mechanic oscilloperturbographs, electronic thermometers, • Learnt and carried out corrective maintenance on 12V DC and 24V DC and 48V DC energy panel fonts

Education

  • Fundação Getulio Vargas / FGV
    Master of Business Administration (MBA), Project Management
    2012 - 2014
  • CCT College Dublin
    Higher Diploma, Computer Science
    2018 - 2019
  • Code Institute
    5 days - Code Challenge, Computer Programming
    2018 - 2018
  • Universidade do Vale do Rio dos Sinos
    Energy Systems Specialization, Market, Planning, Protection, Regulation, Energy Eficiency, Research and Development.
    2009 - 2009
  • Anhanguera Educacional
    Bachelor of Engineering (B.Eng.), Electrical and Electronics Engineering
    2003 - 2007
  • Colégio Técnico de Campinas da Unicamp
    Tecnichian in Electrical and Electronical Engineering, Electrical Engineering Technologies/Technicians
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now