Alireza Samadi Bahrami

Project Coordinator at Altrad Services APAC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Perth Area, AU
Languages
  • English Full professional proficiency
  • Persian Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Zac Mostaani

Alireza is a talented hardworking engineer which has been my role model since beginning of my career. His 'Can Do Attudide' has been always inspiring.

Esfandiar Rashidzadeh

I had the pleasure to work closely with Alireza during long and difficult negotiations along with preparation of a complex international contract for transfer of know how on solar energy. He then supervised as project manager the correct implementation of this technology and with his brilliant creativity and suggestions succeeded with his team on domestication/production and sale of related products.This happened in one of the biggest Holdings of home appliances in Iran in the field of individual and collective heaters. Esfandiar Rashidzadeh(PhD economics)

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • AMPP Membership
    AMPP: Association for Materials Protection and Performance
    Feb, 2023
    - Oct, 2024

Experience

    • Australia
    • Oil and Gas
    • 100 - 200 Employee
    • Project Coordinator
      • Jul 2021 - Present

    • Work Pack Engineer (seconded to Technip Energies)
      • Feb 2021 - Present

      SHELL Prelude Floating LNG Project- Provision of offshore resources for implementation of Brownfield projects at Shell Prelude Floating LNG plant.- Preparing SMP and Insulation Work Packs and Job Cards- Supply of materials, tools, equipment, consumables and the like for offshore works.- Contract management and administration

    • SMP Project Engineer
      • Sep 2019 - Jan 2021

      WOODSIDE KLE Project, Perth, Australia- Led, managed and provided guidance to Work Pack Engineers.- Ensured team members rosters were level out to ensure adequate project coverage.- Reviewed Scope of Work (SOW) documents and ensured project spec and code requirements were covered.- Provided technical support during all project phases to ensure that project designs met operational requirements, specified engineering standards, quality standards and time and profit objectives for the Project.- Assessed risks and hazards involved in tasks, and methods to manage the hazards in order to prevent incidents, injury and damage.- Liaised with client representatives regarding technical queries, inspections, project scheduling and deliveries.- Attended regular progress meetings with both internal and external project stakeholders.- Provided accurate daily, weekly and monthly status reports as directed.- Monitored and reviewed design changes to assess the effect on project budget and schedule.- Assisted in the preparation of work schedules, progress claims and variations.- Assisted with the compilation of construction work packs. job cards, ITPs, ITRs in accordance with Project requirements.- Oversaw subcontractor works including support of contract administration.- Composed weekly progress reports and update schedules as required. Show less

    • Work Pack Engineer (seconded to TechnipFMC)
      • Feb 2019 - Sep 2019

      SHELL Prelude Floating LNG Project- Ensured all work packs and job cards contained the right content / information to allow the successful execution of the works onsite.- Ensured ready for implementation approvals were obtained to meet deadlines.- Ensured all work packs and job cards reflected the scope of work through liaison with all associated HSE, Quality, Procurement, Plant, Equipment, Tooling, and Resourcing.- Reviewed implementation estimates.- Continuously improved the quality and accessibility of the work pack / job card information up to and during implementation phase.- Ensured a successful transition of the work pack / job card requirements from development to site implementation and close out.- Ensured all work packs and job cards were kept up to date and all changes were accounted for in a timely manner.- Managed the implementation related change and growth during the project.- Developed and managed the understanding of risks associated with projects and actively assisted in the process of eliminating or mitigating risk.- Promoted health and safety awareness at all opportunities.- Monitored work pack progress against project baselined plan.- Maintained focus on schedule and had a working knowledge of project milestones. Show less

    • Australia
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • SMP Project Engineer (seconded to Downer)
      • Sep 2018 - Feb 2019

      INPEX Ichthys LNG Project - Site walkdown & provision of engineering guidance to construction. - Liaised with client construction and engineering counterparts to resolve site technical issues. - Carried out site surveys. - Provided assistance for raising permits and pre-commissioning. - Reviewed carry over works content and ensured the scope was clear and correct and the required materials were identified. - Walkdown COW punchlist items to determine actions. - Worked with construction planners to prioritise execution based upon scope and timelines. - Prepared and reviewed field instructions and submitted to contractors. Show less

    • Australia
    • Oil and Gas
    • 100 - 200 Employee
    • Work Pack Engineer
      • Aug 2017 - Sep 2018

      INPEX Ichthys LNG Project Being part of a multi - discipline work pack team, developed work packs in accordance with approved budget, schedule requirements, quality, safety, health and environmental requirements. - Developed and produced quality construction solutions pertaining to various aspects of the defined scope of work to comply with relevant codes, specifications and procedures. Involved interfacing with other disciplines like, planning, construction, procurement, and client. - Prepared construction 'work packs' for onshore procurement, fabrication and construction activities in line with schedule requirements. - Prepared job cards, construction drawings and documentation, materials requisition and liaised with engineering, operations and support services as required. - Reviewed Design Engineers output for completeness and clarity of intent and liaised with discipline engineers / TAs for the development of work orders / packs, major / minor plant changes and major repairs. - Maintained an overview of current work pack status in the associated WMS systems and provided progress updates to the integrated planning engineer. Show less

    • Australia
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Mechanical Project Engineer
      • Jul 2013 - Aug 2017

      - Performed FEMAP/FEA analysis for steel structures and parts, design verification and modification. - Provided detailed designs and component drawings in CAD and 3D modelling environment. - Developed accurate estimates through first principles pricing of direct and indirect job costs. - Interpreted and apply Australian Design Rules (ADR) and Australian Standards to designs. - Improved design, performance and efficiency of existing products. - Researched and developed ideas for new products and production systems. - Created and planed new production processes. - Advised purchasing department on product purchase and cost control. - Provided engineering support to production plant throughout design stages. - Managed scope and executed work in a cost and time effective manner. Show less

    • Iran
    • Automotive
    • 200 - 300 Employee
    • Mechanical Project Engineer
      • Nov 2005 - Oct 2012

      - Liaised with client representatives regarding technical queries, inspections, project scheduling and coordinating deliveries. - Produced as-built drawings for piping installations. - Oversaw subcontractor works including support of contract administration. - Prepared work packs for modular assembly works. - Arranged method statements for modular assemblies and organised project testing requirements. - Composed weekly progress reports and updated schedules as required. - Ensured relevant field inspection checklists were completed and signed in conjunction with client representatives. - Understood and implemented quality control techniques. - Maintained company standards for Quality Assurance purposes. - Presented neat documentation, correspondence and records as requested. - Provided accurate daily, weekly and monthly reports as directed. Show less

Education

  • Sharif University of Technology
    Master of Science - MS, Biomechanical Engineering
    1996 - 1999
  • Guilan University
    Bachelor of Science - BS, Mechanical Engineering
    1992 - 1996

Community

You need to have a working account to view this content. Click here to join now