Jeremias Bertis Mateo

Production (O&M) Manager at Marubeni Power Asset Management Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kowloon, Hong Kong SAR, HK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

LinkedIn User

Jerry is a hardworking and intelligent guy. He has the capability to understand all the aspects in engineering. He is a problem solver that uses all the resources he can have.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Hong Kong
    • Utilities
    • 1 - 100 Employee
    • Production (O&M) Manager
      • Apr 2019 - Present

      MARUBENI POWER ASSET MANAGEMENT LTD - provides asset management services for Marubeni’s own electrical power generation facilities all over the world totalling to over 42,000MW. Works in cooperation with local staff and other shareholder representatives to optimize the costs and benefits of the power stations in parallel with achieving sustainable, stable and safe operation.• Collaborated with the local teams in each facility to identify opportunities, determine possible contributing factors on operational losses and provide actionable recommendations that resulted to a 5% performance ratio improvement on a floating solar power station, increased annual revenue of 8% in a combined cycle gas turbine plant, reduced generation revenue loss by 15% in a sub-critical coal-fired unit and reduced fuel cost by 3% in a supercritical coal-fired power station.• Developed and have currently deployed the company’s thermal performance optimization program to 17 facilities (full-blown and partial) which includes execution of internal performance tests and analysis, trainings and workshops for the Plant Managers and Engineers. • Recently launched the company’s in-house thermal performance monitoring system to a CCGT pilot facility which induced four (4) additional projects within the region. Show less

    • Manager-Fleet Performance Engineering
      • Apr 2015 - Present

      Monitor, advise and assist the engineering and operational performance of Marubeni invested power and water generating assets. Heavily involve in proactive initiatives and reactive programs to boost asset's availability, reliability, thermal performance and financial earnings. Experienced in modeling, analysis of power and water cycles based on industry standard procedures utilizing Thermoflow Suite and Gatecycle, and optimization strategies for Thermal and CCGT power plants.

    • Assistant Manager-Fleet Performance Engineering
      • Aug 2012 - Mar 2015

      Monitoring and reporting responsibility for Marubeni-invested thermal plant assets. Serves as the company’s program coordinator for Marubeni - Hong Kong's fleet oversight and support, performance and reliability improvement and remote monitoring programs. Includes thermal performance and optimization, project management, and Root cause analysis.

    • United States
    • Utilities
    • 700 & Above Employee
    • Performance Engineer
      • Dec 2009 - Jul 2012

      AES CORPORATION – Fortune 500 global power company with generation and distribution businesses in 31 countries. AES is a developer, builder and operator of generation facilities that are fuelled by a diverse portfolio of thermal and renewable fuel sources. • Prepared timely plant performance analysis and reports which reduced the day-ahead spot market electricity trading uncertainty by 10%. • Worked jointly with multidisciplinary team to implement new business initiatives to improve plant performance, efficiency, and availability through an engineering work approach. Won the company’s annual AES Performance Excellence regional competition in 2010 and 2011 which reduced overall EFOR by 3%. • Involved with the turn-around activities that reinforced and strengthen safety culture, helped achieved the maximum power generation from 433MW to 630MW, increased overall efficiency by 13% and reduced particulate emissions by 80%. These improvements were recognised internationally through the Edison Award (2011), Power Magazine - Top coal-fired power plant globally (2011), Best Power Plant Upgrade in Asia – Gold (2011), and Independent Power Producer of the Year -Gold (2011). Show less

Education

  • Mapua Institute of Technology
    Bachelor's degree, Mechanical Engineering

Community

You need to have a working account to view this content. Click here to join now