Kaashiff Baig
Field Engineer at Tecma Associates, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Erosion and Sediment Control - Level I
Illinois Department of TransportationSep, 2023- Nov, 2024 -
STTP- S33 Soil Field Testing and Inspection
Illinois Department of TransportationFeb, 2023- Nov, 2024 -
OSHA 30-Hour Construction
360trainingMar, 2021- Nov, 2024 -
Procore Certified: Student
Procore TechnologiesOct, 2020- Nov, 2024 -
Construction Manager-in-Training
Construction Management Association of America (CMAA)Oct, 2020- Nov, 2024 -
DOCUMENTATION OF CONTRACT QUANTITIES
Illinois Department of TransportationMar, 2023- Nov, 2024
Experience
-
Tecma Associates, Inc.
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
Field Engineer
-
Aug 2023 - Present
-
-
-
Engineering Services Group, Inc.
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
Construction Engineer
-
Jan 2022 - Jul 2023
* CDOT Arterial Street Resurfacing Program (North Area) – Chicago, IL / Providing construction management services for CDOT’s $10-15 million a year Arterial Resurfacing Program/ Resurfacing and Reconstruction 15 miles arterial streets (12 separate locations) / work includes ADA complaint ramps, utility upgrades, new curbs and gutter, new lighting and traffic signals & landscaped medians.* Illinois Department of Transportation (IDOT) /Contract No. 60X74/ COOK County / Section 3034B&N-2 / Project NHPP- RBZE (142)/ Route FAU 344: IL ROUTE 83(CAL SAG ROAD) OVER TINLEY CREEK (AT 127TH / BRIDGE REPLACEMENT & INTERSECTION IMPROVEMENT, Includes Remove and Replace of Bridge, Installation of New Utility Structures, ADA Complaint Ramps, New lighting and traffic signals, Re-profiling and Resurfacing of Intersection. Show less
-
-
Construction Engineer Intern
-
Jun 2021 - Dec 2021
Illinois Department of Transportation (IDOT) /Contract No. 62J59/ COOK County / Section 2019-082-RS&T / Project NHPP-35N3 (515) / Route FAU 90 Kennedy Expressway / (3.53 miles) Resurfacing and Reconstruction project on I-90 Expressway from IL Route 43 to I-94., includes PCC Patching, Trench Backfill, Landscaping, Street Lights.
-
-
-
ECS Limited
-
United States
-
Civil Engineering
-
700 & Above Employee
-
Field Engineer Intern
-
Mar 2021 - Jun 2021
* Maintained records of fieldwork and provided progress updates and upcoming plans during daily presentations. * Documented and monitored daily progress of the projects to ensure conformance to design specifications and safety standards. * Ensured team has identified, tracked, and submitted the extra work orders, also assist the team with resolution for their queries. * Provided on-site engineering support to superintendents and subcontractors during construction of sub-structure components. * Developed constructive and cooperative working relationships with colleagues and provided technical assistance for inspection. Show less
-
-
-
ITD Cementation India Limited
-
India
-
Construction
-
500 - 600 Employee
-
Field Engineer
-
Jul 2018 - Jul 2019
* Examined all construction drawings and specifications for suspected constructability issues, potential code violations, or errors. * Coordinated with the team to prioritize tasks and ensure projects are completed within material and equipment budgets. * Scheduled meetings with local, state, federal officials, and the local public to address any concerns about on-going projects. * Facilitated communication between the owner and contractor to ensure construction projects were on-time and on-budget. * Performed duties as required to close out and occupy the project including inspection & approvals by governmental authorities. Show less
-
-
-
Redfeather Interiors
-
Bengaluru, Karnataka, India
-
Interior Design Intern
-
Mar 2018 - Jul 2018
*Studied and assessed drawings, plans, specifications, and other documents relating to construction. * Co-ordinated and guided with the design team and execution team for changes if necessary. * Handled cost-of-material estimations, report and document tracking, project documentation, and building permit applications. * Designed AutoCAD drawings for field work, using geographical area maps as reference. *Studied and assessed drawings, plans, specifications, and other documents relating to construction. * Co-ordinated and guided with the design team and execution team for changes if necessary. * Handled cost-of-material estimations, report and document tracking, project documentation, and building permit applications. * Designed AutoCAD drawings for field work, using geographical area maps as reference.
-
-
Education
-
The University of Texas at Arlington
Master of Science - MS, Civil Engineering, Construction Engineering and Mangement -
HKBK College of Engineering
Bachelor's degree, Civil Engineering