Kaashiff Baig

Field Engineer at Tecma Associates, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Chicago, Illinois, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Erosion and Sediment Control - Level I
    Illinois Department of Transportation
    Sep, 2023
    - Nov, 2024
  • STTP- S33 Soil Field Testing and Inspection
    Illinois Department of Transportation
    Feb, 2023
    - Nov, 2024
  • OSHA 30-Hour Construction
    360training
    Mar, 2021
    - Nov, 2024
  • Procore Certified: Student
    Procore Technologies
    Oct, 2020
    - Nov, 2024
  • Construction Manager-in-Training
    Construction Management Association of America (CMAA)
    Oct, 2020
    - Nov, 2024
  • DOCUMENTATION OF CONTRACT QUANTITIES
    Illinois Department of Transportation
    Mar, 2023
    - Nov, 2024

Experience

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Field Engineer
      • Aug 2023 - Present

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Construction Engineer
      • Jan 2022 - Jul 2023

      * CDOT Arterial Street Resurfacing Program (North Area) – Chicago, IL / Providing construction management services for CDOT’s $10-15 million a year Arterial Resurfacing Program/ Resurfacing and Reconstruction 15 miles arterial streets (12 separate locations) / work includes ADA complaint ramps, utility upgrades, new curbs and gutter, new lighting and traffic signals & landscaped medians.* Illinois Department of Transportation (IDOT) /Contract No. 60X74/ COOK County / Section 3034B&N-2 / Project NHPP- RBZE (142)/ Route FAU 344: IL ROUTE 83(CAL SAG ROAD) OVER TINLEY CREEK (AT 127TH / BRIDGE REPLACEMENT & INTERSECTION IMPROVEMENT, Includes Remove and Replace of Bridge, Installation of New Utility Structures, ADA Complaint Ramps, New lighting and traffic signals, Re-profiling and Resurfacing of Intersection. Show less

    • Construction Engineer Intern
      • Jun 2021 - Dec 2021

      Illinois Department of Transportation (IDOT) /Contract No. 62J59/ COOK County / Section 2019-082-RS&T / Project NHPP-35N3 (515) / Route FAU 90 Kennedy Expressway / (3.53 miles) Resurfacing and Reconstruction project on I-90 Expressway from IL Route 43 to I-94., includes PCC Patching, Trench Backfill, Landscaping, Street Lights.

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Field Engineer Intern
      • Mar 2021 - Jun 2021

      * Maintained records of fieldwork and provided progress updates and upcoming plans during daily presentations. * Documented and monitored daily progress of the projects to ensure conformance to design specifications and safety standards. * Ensured team has identified, tracked, and submitted the extra work orders, also assist the team with resolution for their queries. * Provided on-site engineering support to superintendents and subcontractors during construction of sub-structure components. * Developed constructive and cooperative working relationships with colleagues and provided technical assistance for inspection. Show less

    • India
    • Construction
    • 500 - 600 Employee
    • Field Engineer
      • Jul 2018 - Jul 2019

      * Examined all construction drawings and specifications for suspected constructability issues, potential code violations, or errors. * Coordinated with the team to prioritize tasks and ensure projects are completed within material and equipment budgets. * Scheduled meetings with local, state, federal officials, and the local public to address any concerns about on-going projects. * Facilitated communication between the owner and contractor to ensure construction projects were on-time and on-budget. * Performed duties as required to close out and occupy the project including inspection & approvals by governmental authorities. Show less

  • Redfeather Interiors
    • Bengaluru, Karnataka, India
    • Interior Design Intern
      • Mar 2018 - Jul 2018

      *Studied and assessed drawings, plans, specifications, and other documents relating to construction. * Co-ordinated and guided with the design team and execution team for changes if necessary. * Handled cost-of-material estimations, report and document tracking, project documentation, and building permit applications. * Designed AutoCAD drawings for field work, using geographical area maps as reference. *Studied and assessed drawings, plans, specifications, and other documents relating to construction. * Co-ordinated and guided with the design team and execution team for changes if necessary. * Handled cost-of-material estimations, report and document tracking, project documentation, and building permit applications. * Designed AutoCAD drawings for field work, using geographical area maps as reference.

Education

  • The University of Texas at Arlington
    Master of Science - MS, Civil Engineering, Construction Engineering and Mangement
    2020 - 2022
  • HKBK College of Engineering
    Bachelor's degree, Civil Engineering
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now