Víctor Javier Delgado Ponce
Field Engineer at Constructora Vilicic S.A.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Inglés Full professional proficiency
Topline Score
Bio
Credentials
-
“ASME B31.8: Tuberías de Transporte y Distribución de Gas” Certificado oficial ASME
ASME (The American Society of Mechanical Engineers)
Experience
-
Constructora Vilicic S.A.
-
Chile
-
Construction
-
1 - 100 Employee
-
Field Engineer
-
Jul 2018 - Present
Facilities management at Vilicic Holding. Supervisor under contract with ENAP. Facilities management at Vilicic Holding. Supervisor under contract with ENAP.
-
-
-
-
Field Engineer
-
Nov 2016 - Jun 2018
Responsible for project execution, assembly of various types of equipment, and flow lines. Responsible for project execution, assembly of various types of equipment, and flow lines.
-
-
-
ENAP
-
Chile
-
Oil and Gas
-
700 & Above Employee
-
Project manager
-
Jul 2015 - Jan 2016
▪ Responsible for tracking construction progress, implementing an S-curve and Gantt chart. ▪ Technical Inspector on the 43 km-long Sara-Cullen Gas Pipeline. ▪ Punta Arenas, Chile (Fixed-term position through Link Humano). ▪ Responsible for tracking construction progress, implementing an S-curve and Gantt chart. ▪ Technical Inspector on the 43 km-long Sara-Cullen Gas Pipeline. ▪ Punta Arenas, Chile (Fixed-term position through Link Humano).
-
-
-
GeoPark
-
Oil and Gas
-
400 - 500 Employee
-
Project Engineer
-
Oct 2007 - Feb 2015
▪ Implementation of new control mechanisms in earth movements using indicators. ▪ Implementation of contractor collaboration systems to reduce construction time and motivate staff. ▪ Construction and commissioning of TK-1001 at ENAP's Gregorio Terminal, improving the crude oil sales dynamics to ENAP. ▪ Project Director for over 120 km of gas pipelines and flow lines constructed by Geopark in the Fell Block. ▪ Selection of separators, heaters, and natural gas dehydrators. ▪ Negotiating with landowners for access to their properties and maintaining daily relationships to carry out work on their premises. ▪ Achieved a 30% cost reduction in retaining wall construction by implementing the use of Australian tanks instead of earthen walls. ▪ Designing the standard for permanent wellhead installation with welded lines and equipment on foundations, ensuring a safe installation for people and the environment for Geopark. Show less
-
-
-
Exterran
-
Canada
-
Oil and Gas
-
700 & Above Employee
-
Project Engineer
-
Feb 2007 - Oct 2007
▪ Project management in the construction of the Dew Point Kimiriaike Plant on Route CH-255, Km. 100, for Geopark. ▪ SEC certification of the gas pipeline connecting the Kimiriaike Plant to ENAP's 18'' gas pipeline. ▪ Designing a standard for Geopark specifying the dimensions of flare pits at wellheads based on their production. ▪ Project management in the construction of the Dew Point Kimiriaike Plant on Route CH-255, Km. 100, for Geopark. ▪ SEC certification of the gas pipeline connecting the Kimiriaike Plant to ENAP's 18'' gas pipeline. ▪ Designing a standard for Geopark specifying the dimensions of flare pits at wellheads based on their production.
-
-
-
Bufete Industrial in Methanex Chile Limited
-
Punta Arenas, Chile
-
Head of the Quality Management Department
-
Feb 2006 - Feb 2007
▪ Implementation of Quality Systems, preparation of quality manuals and procedures. ▪ Quality management and control in projects such as the assembly of a GE 10.5 MW turbine at Edelmag Tres Puentes, cathodic protection projects I and II at MCL, the fire protection ring project for MCL, and acid pump replacements in plants I, II, and III. ▪ Implementation of Quality Systems, preparation of quality manuals and procedures. ▪ Quality management and control in projects such as the assembly of a GE 10.5 MW turbine at Edelmag Tres Puentes, cathodic protection projects I and II at MCL, the fire protection ring project for MCL, and acid pump replacements in plants I, II, and III.
-
-
-
Bufete Industrial contratista de Methanex Chile Limited
-
Punta Arenas, Chile
-
Quality Supervisor
-
Feb 2004 - Feb 2006
▪ Proyectos IBL (Inside Battery Limit), la interconexión de línea de gas natural de 10’’, proyecto fresh cooling water, etc. ▪ Proyectos IBL (Inside Battery Limit), la interconexión de línea de gas natural de 10’’, proyecto fresh cooling water, etc.
-
-
-
SalfaCorp
-
Chile
-
Construction
-
700 & Above Employee
-
Computer System Administrator and Quality Assurance Manager for the warehouse.
-
Sep 2003 - Feb 2004
Development of quality procedures for the central warehouse in Tres Puentes. Development of quality procedures for the central warehouse in Tres Puentes.
-
-
-
UNIVERSIDAD TECNOLÓGICA DE CHILE – INACAP
-
Punta Arenas, Chile
-
Teacher
-
Aug 2002 - Sep 2003
Teaches courses in mechanical physics, thermodynamics, and technical drawing for the Quality and Environment Engineering and Risk Prevention Engineering programs. Teaches courses in mechanical physics, thermodynamics, and technical drawing for the Quality and Environment Engineering and Risk Prevention Engineering programs.
-
-
-
ENAP
-
Chile
-
Oil and Gas
-
700 & Above Employee
-
Internship Trainee
-
Jan 1998 - Feb 1998
▪ Worked in the preventive maintenance department of the plant, designing a digital catalog for the maintenance of AJAX compressors to avoid traceability issues between ENAP's warehouse codes and those of the manufacturer. ▪ Worked in the preventive maintenance department of the plant, designing a digital catalog for the maintenance of AJAX compressors to avoid traceability issues between ENAP's warehouse codes and those of the manufacturer.
-
-
Education
-
Universidad de Magallanes
Bachelor of Engineering in Mechanical Engineering with a specialization in hydropneumatic systems., Ingeniería mecánica -
Universidad de Viña del Mar
Master's degree in Management in the Hydrocarbon Industry., Oil & gas