Bayram Ali EREN
Mechanical Engineer at UET Uran Endüstri Tesisleri A.Ş.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Türkçe Native or bilingual proficiency
-
english Professional working proficiency
Topline Score
Bio
Experience
-
UET Uran Endüstri Tesisleri A.Ş.
-
Türkiye
-
Oil and Gas
-
1 - 100 Employee
-
Mechanical Engineer
-
Oct 2017 - Present
Supervised to fire fighting and HVAC system in the Project. Supervised to fire fighting and HVAC system in the Project.
-
-
-
Metag İnsaat Ticaret A.S.
-
Afghanistan
-
Project Manager
-
Feb 2015 - Aug 2017
Below items has been completed under the RW5J9LE-13-C-0021 Kajaki Irrigation Dam&Tunnel Works Afghanistan/Kajaki project. As Project Manager: a- Assisting to engineers in developing design and solving implementation issues b- Developing work safety guidelines and scheduling goals of various projects simultaneously c- Overseeing all project activities both on-site and off-site and making sure they are completed as per the schedule d- Estimated and came up with budgets to be used on the project e- Ensured that all safety standards, design specifications, and any other requirements were followed to the letter f- Updating project schedule g- Reviewed and made the necessary recommendations appertaining to any construction modifications h- Supervised suppliers and subcontractors as they worked on the project i- Able to make sure that all the project requirements have been met in regard to cost, quality, and safety j- Managing subcontractors As Site Superintendent: 1- Intake tower crane replacement(100 Tons); demolished 75tons old intake tower crane , installed new 100tons crane as well, Also tested with water balons. 2- Removed old hydro trubines and new hydro turbines installed and commisioned proper. 3- Fixed Cone Valves replacement DN2400(84") 4- Hydrolic units installation. 5- Roto valve hydrolic cylinders replacement. 6- Air duct and ventiletion system maintinance for tunnel. 7- Wheel Gate maintinance and wheels replacement. 8- Stoplog bulkhead maintenance. 9- All electrical lines reniewed for irrigation tunnel system. 10- All the electrical control panels and Mechanical systems' control units has been reniewed. 11- All site activities and construction mangement and coordinations, organizations has been accomplished as successfully.
-
-
-
Dunia Technique
-
Iraq
-
Mechanical Engineer
-
Sep 2014 - Jan 2015
Badra Oil Field Development - Phase 2 As Maintenance Mechanical Engineer. Provide all Maintenance, periodic control, prepartion maintenance cards, workshop management, ordering spare parts for the work machines proper working. Badra Oil Field Development - Phase 2 As Maintenance Mechanical Engineer. Provide all Maintenance, periodic control, prepartion maintenance cards, workshop management, ordering spare parts for the work machines proper working.
-
-
-
-
Mechanical Engineer
-
Dec 2011 - Jun 2014
Afghan National Army (ANA) Mazar-e-Sharif Air Detachment, Balkh Province, Afghanistan, Contract No: W5J9JE-10-D-0007-0010 As a mechanical engineer Completed works; a-)Aviation fuel tanks,fuel transfer pumps with remote fill station installation and commissioningb-)Fuel pipe lines and fuel dispensers installationc-)Power plant FG WILSON generators and fuel line installationd-)Separated generator fuel tanks, fuel transfer pumps with remote fill station and fuel pipe lines installation according to the UL standarte-)Vehicle fuel point mogas fuel tanks, fuel pipe lines,fuel transfer pumps and many fuel dispensers installationg-)Larger Screw(reciprocating) air compressors and compressed air distrubution pipe line installationh-)Booster pumps and expansion tanks and mechanical room completely installationi-)WWTP(waste water treatment plant and labrotory wich is for controling of WWTP system installatinon and commissioningj-)Storm water collection and larger capacity drain pumps installationk-)Well pumps,hand pumps and well house mechanical installationl-)All engineering studies,commisioning,testing, balancing and etc. has been conducted handovered to the USACE.
-
-
Mechanical Engineer
-
Oct 2012 - Jul 2013
AFGHAN BORDER POLICE BATTALION HEADQUARTER, HAIRATAN,BALKH PROVINCE, AFGHANISTAN CONTRACT NO #: W5J9JE-10-D-0007-008 Completed works;a-)HVAC and Fire Fighting system installationb-)Larger Fuel tanks installation and fuel pipe lines installationc-)Power plant generator installation and fuel pipe line installationd-)Plumbing, pump house and mechanical room equiments installatione-)Galvanized modular water storage tank installation on the water tower structure,f-)All mechanical works and Engineering studies of this project has been conducted and project successfuly and handovered to USACE.
-
-
Mechanical Engineer
-
Oct 2010 - Dec 2011
100% SAME TWIN PROJECTS; DESIGN / CONSTRUCT PN 74120 WASTE MANAGEMENT AREA FOB SALERNO & FOB GHAZNI BASES AT AFGHANISTAN 1- As Mechanical Engineer.a-)Incinerators installation, commisioned perfectlyb-)Fuel tanks and fuel pipe lines installationc-)Power Plant generators and fuel line installation,d-)All mecanical equipment installation and all commisioning,testing, balancing has been conducted and successfuly handovered to USACE. 2-As a QC Engineer. a-) All mechanical, civil,electrical equipments submittal documentations prepared, submitted on the QCS/RMS p.c program and provided approve all theese submittals. b-) Dailiy reports prepare, weekly meeting minutes prepare and sending from on the QCS/RMS p.c program.c-) Prepare of monthly progress payments fromon the QCS/RMS p.c program. and as last successfully completed cloe out of this project.
-
-
-
-
Mechanical Engineer
-
Dec 2009 - Aug 2010
Construction of : -6 Nos of Dormitories (contract no: KDZ 232/0318-0821) -Billeting Facilities and a Kitchen (KDZ232/0318-1474) -DFAC (KDZ232/0318-0820) for ISAF Forces, in Taloqhan, Kunduz/Afghanistan As Mechanical Works Site Manager, Supervised all mechanical works (HVAC/Plumbing/Sanitary systems and, other mechanical equipment installation) to include; checking and approving of all mechanical shop drawings, sourcing all mechanical equipment/material, preparation/submitting of all mechanical design and material specifications, preparation of material quantity take-offs and, placing the material purchase orders, preparation/revision of schedules, preparation/submittal of daily, weekly, monthly progress reports, preparation/submittal of O&M manuals, as-built drawings.
-
-
-
Ciner Group
-
Türkiye
-
Mining
-
300 - 400 Employee
-
Mechanical Engineer
-
Jan 2009 - Nov 2009
Underground Facilities Installation Project As Site Manager supervised design and installation works of 55Kw-250 Kw powered material conveying systems, cooling car systems, monorail systems, shunting trolley systems, underground waste water drainage systems, shilts, Eickhof conveyors, rumble stations, all underground equipment (Deilman-Haniel, Eimco, PK9), Underground Facilities Installation Project As Site Manager supervised design and installation works of 55Kw-250 Kw powered material conveying systems, cooling car systems, monorail systems, shunting trolley systems, underground waste water drainage systems, shilts, Eickhof conveyors, rumble stations, all underground equipment (Deilman-Haniel, Eimco, PK9),
-
-
-
TOKAR CONSTRUCTION & INDUSTRY INC.
-
Moscow, Russian Federation
-
Mechanical Engineer
-
Mar 2008 - Oct 2008
Moscow Plot 9 Towers Project, consisting construction of Moscow Tower (75-Floor) , St. Petersburg Tower (63 Floor), South Tower (19 Floor) and their 6 Floor common basement building (Contract value: 140 mil US$) As Mechanical Works Site Engineer, supervised to installation of all pipe lines, heating system, chiller units, exchangers, water&chemical pumps, AHU units, Fancoil units, mechanical rooms(each 20 floors and under floors) completion , and other mechanical QC activities, testing and commissioning works completed
-
-
-
Metag İnsaat Ticaret A.S.
-
Afghanistan
-
Mechanical Engineer
-
Mar 2007 - Jan 2008
Design-Build ANP Border Police 6th Brigade HQ Project, Herat/Afghanistan Supervised to Mechanical installation, plumbing system , hot/cold water systems, chlorination equipment, HVAC system, fuel (gas and diesel) tanks piping, cold storage rooms and all mechanical production works. Design-Build ANP Border Police 6th Brigade HQ Project, Herat/Afghanistan Supervised to Mechanical installation, plumbing system , hot/cold water systems, chlorination equipment, HVAC system, fuel (gas and diesel) tanks piping, cold storage rooms and all mechanical production works.
-
-
-
İmbat Madencilik
-
Türkiye
-
Mining
-
200 - 300 Employee
-
Mechanical Engineer
-
Dec 2005 - Mar 2007
Workshop Engineer for Metal Production:supervised manufacturing of underground mechanization equipment like band conveyors, cylindirical band rollers, chained conveyors and underground water drainage system equipment and its parts Underground Facilities engineer:supervised installation works of : 1-longer more than 1000 mt EP600, 17 degrees inclined band conveyor, longer more than 1200 mt long EP400, 7 degrees inclined band conveyor, - longer more than 250 mt EP400, 4 degrees inclined band conveyors, About 130 mt long double drive and double chained conveyors, R&D(Research Development) for the underground coal mining system mechanization calculations and installation for the underground water drainage pumps. calculations for the pressured water distribution line which is for the hydrolic support posts. Underground machineries(Eickof, excavators, loaders and drillers) system placement and maintenance Maintenance Engineer:supervised maintenance activities of equipment to include procurement of the spares R&D Engineer : carried out market research and sourcing activities for mechanized and automatic coal extraction and monorail system.
-
-
Education
-
Balıkesir University