Ak Khairul Izhwan

Resident Engineer at BW Perunding Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cheras, Selangor, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified site supervisor
    CIDB Malaysia
    Jan, 2016
    - Nov, 2024
  • Graduate engineer
    Board of Engineers Malaysia
    Apr, 2014
    - Nov, 2024

Experience

    • Malaysia
    • Civil Engineering
    • 1 - 100 Employee
    • Resident Engineer
      • Nov 2021 - Present

    • Malaysia
    • Civil Engineering
    • 200 - 300 Employee
    • Site Engineer
      • Jun 2021 - Sep 2021

      Project : KVLRT3 Package GS03 - Station 7 Glenmarie Key Responsibilities 1. Ensuring the SIR/RFI is in order for every work 2. Managing interfacing work between subcontractors 3. Coordination for site works at site with subcontractors 4. Regular monitoring and reporting for progress and issue occur at site 5. Conducting inspection with supervising consultant for every work done by subcontractors 6. Liaising with varies parties for coordination of site works 7. Work closely with project manager and construction manager for planning and sequence of site works 8. Responsible in site preparation and documentation for station launching work Show less

  • Kayynhans Enterprise
    • Shah Alam, Selangor, Malaysia
    • Engineer
      • Oct 2020 - Dec 2020

      Project : Sub RC works for rebar, formwork and concreting work for Package 16 KVLRT 3 (Piercap, Pier and Pilecap) Key Responsibilities 1. Responsible in planning the works done on site to achieve required work target 2. Responsible in optimizing manpower and material for works on site 3. Liaised with client regarding the machineries, materials and equipment 4. Supervised and monitored work done by workers according to construction drawings 5. Responsible in claim preparation and documentation submission to client Show less

  • Paneagle Infratek sdn bhd
    • Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
    • Engineer
      • May 2019 - Jun 2020

      Project : Construction of Parking Lot (Design and Build) at HQ PERSADA PLUS, Subang Key Responsibilities 1. Ensured the ground formation and level are according to specification 2. Controlling resources (manpower, machineries and materials) on site 3. Ensuring the quality of works done are according to specification 4. Monitoring and supervising subcontractor for the quality of infrastructure works (roads, drainage, and kerb) Project : Resurfacing roadworks at Petronas Regional Office and Compressor Station, Kuantan (completed) Key Responsibilities 1. Responsible as Work Leader on site for Work Permit Application and documentation related to site work 2. Monitored subcontractor for resurfacing road works including road kerb painting and road marking 3. Successfully completed the project within specified time, budget and quality required 4. Work closely with client for any site issues arised Project : Lot 91, Mixed Commercial Development, Kuala Lumpur – Road and Drainage work Key Responsibilities 1. Successfully completed drainage work with specified time, budget and quality 2. Coordination and monitoring site works to achieve daily target activity 3. Responsible in resolving any site issues arise 4. Planning and controlling the requirement of resources on site (manpower, machineries and materials 5. Liaising with various parties including local authority, client, consultant and main contractor for site works activity 6. Work closely with project manager for construction method and planning of works Show less

    • Malaysia
    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • Nov 2018 - Feb 2019

      Project : Construction for 79 bungalows, tnb substation and security guard building Key Responsibilities 1. Carried out inspection of the works done by the subcontractor with client representative 2. Ensured the quality of works done achieve the required specification 3. Responsible in resolving any issues on site 4. Responsible in preparing RFIN for inspection of structure works 5. Regular monitoring progress based on CPM 6. Responsible in issuing NCR and site memo to subcontractor for quality issue 7. Managed and coordinated the site works with subcontractor according to CPM Show less

    • Malaysia
    • Oil and Gas
    • 1 - 100 Employee
    • Resident Engineer
      • Aug 2017 - Aug 2018

      Project : Tadika Anak Permata Pengerang Key Responsibilities - Responsible in any inspection of the work done by the contractor - Regular monitoring of the quality of the work done on site as per specification and approved drawings - Responsible in resolving any constructability issues on site - To ensure that the documentation on the site is in order - To liaise with local authorities, clients and contractor on site matters - Regular monitoring on the quality of the work on site - Ensuring the material used on site is approved and according to standard - To assist contractor in design issues for all field (Civil, Structural, and M&E) - Responsible in claim verification for contractor based on site works done - Responsible in weekly report preparation and site daily report verification by contractor - Responsible in issuing NCR and site memo for any quality issue on site Show less

  • Paneagle Infratek Sdn. Bhd
    • Pengerang, Johore, Malaysia
    • Project Engineer cum Site Engineer
      • Jan 2015 - Mar 2017

      Project : RAPID Pengerang - sub structure work for temporary buildings, interlocking paver bustop, perimeter fencing, chemical tank foundations Key Responsibilities - Ensuring all works done are according to established method statement and specification - Work closely with project manager for planning of construction, method of construction and resources - Supervised and managed site works and monitoring progress to achieve daily target activities - Work closely with project manager to rectify any issue on site - Responsible in QAQC matters such as RFIN, Material approval, Laboratory test - Monitoring and supervising works to optimize the resources on site - Ensuring the daily targeted tasks are achieved - Responsible in ensuring the delivery of materials on site - Responsible in business engagement with suppliers and vendors - Involved in tendering process including tender meeting, document preparation, kick off meeting and technical meeting - Involved in preparing and submission of claims to main contractor - Responsible in preparing preliminary items prior to construction - Ensuring the health and safety matters are practiced on site Show less

    • Malaysia
    • Oil and Gas
    • 700 & Above Employee
    • G.E.E.S
      • Jan 2014 - Sep 2014

      Project : EPCC Tank 7 New Jetty project Key Responsibilities - Attended 2 months soft skills classes and 6 months attachment to Petronas LNG 9 Sdn Bhd - Familiarization with design standard, requirements and Petronas Technical Standard - Involve in reviewing Job Method Statements and Job Hazard Analysis for civil works - Ensuring the quality of the works done on site for civil works. - Involve in site inspections (concreting, rebar inspection and formwork installation) for temporary and permanent infrastructures. - Involve in reviewing specification based on standards and requirement as per project specification. Show less

  • Indah Water Konsortium
    • Kuala Lumpur, Malaysia
    • Technical Assistant
      • Sep 2013 - Jan 2014

      Project : Upgrading and refurbishment of 7 waste treatment plants works (GKL Project) Key Responsibilities - Responsibile in monitoring and supervising site works - Involved in HAZOP and technical discussion - Ensured that safety and health matters are practise on site - Involved in site measurement for montly claim - Involved in reviewing method statement and MAR for construction - Ensured that the quality of construction work done are according to standard and within budget and schedule - Produced Minutes of Meeting for Hazop discussion and montly meeting - Liased with authorities, client, main con and sub con for design approval Specialities: Project management and supervision in construction Show less

  • Gamuda Berhad
    • Kuala Lumpur, Malaysia
    • SL1M Trainee
      • Jun 2013 - Sep 2013

      Project : KVMRT 1 (UG) Jalan Cochrane Key Responsibilities - Involved in supervising and monitoring tunneling works by Tunnel Boring Machine for KVMRT project (Cochrane Site) - Liasing with different personel for task need to be done on site - Ensured that all the problems occured are resolved within acceptable time duration - Updating daily progress of mining operation - Produce Weekly Minutes Meeting Specialities: Tunnelling and project management Project : KVMRT 1 (UG) Jalan Cochrane Key Responsibilities - Involved in supervising and monitoring tunneling works by Tunnel Boring Machine for KVMRT project (Cochrane Site) - Liasing with different personel for task need to be done on site - Ensured that all the problems occured are resolved within acceptable time duration - Updating daily progress of mining operation - Produce Weekly Minutes Meeting Specialities: Tunnelling and project management

Education

  • Universiti Teknologi MARA
    Bachelor of Engineering (HONS) Civil, Structural Engineering
    2010 - 2013
  • Universiti Teknologi MARA
    Diploma in Civil Engineering, 3.06 / 4.00
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now