Julien Trystram
Project Director at PETROFAC FACILITIES MANAGEMENT LIMITED- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
French -
-
English -
Topline Score
Bio
David Guerreiro
Working with Julien was a very good experience. Julien is a real team maker with a wide knowledge on process and civil areas. I learnt a lot from him. He was always a good support for all the team and an example to follow. I wish we will cross our professional carriers once again.
Taieb BOUBAKER
Je recommande Julien Trystram pour sa force de travail, son relationnel et pour ses qualités de manager.
David Guerreiro
Working with Julien was a very good experience. Julien is a real team maker with a wide knowledge on process and civil areas. I learnt a lot from him. He was always a good support for all the team and an example to follow. I wish we will cross our professional carriers once again.
Taieb BOUBAKER
Je recommande Julien Trystram pour sa force de travail, son relationnel et pour ses qualités de manager.
David Guerreiro
Working with Julien was a very good experience. Julien is a real team maker with a wide knowledge on process and civil areas. I learnt a lot from him. He was always a good support for all the team and an example to follow. I wish we will cross our professional carriers once again.
Taieb BOUBAKER
Je recommande Julien Trystram pour sa force de travail, son relationnel et pour ses qualités de manager.
David Guerreiro
Working with Julien was a very good experience. Julien is a real team maker with a wide knowledge on process and civil areas. I learnt a lot from him. He was always a good support for all the team and an example to follow. I wish we will cross our professional carriers once again.
Taieb BOUBAKER
Je recommande Julien Trystram pour sa force de travail, son relationnel et pour ses qualités de manager.
Credentials
-
SMSTS
-
Experience
-
PETROFAC FACILITIES MANAGEMENT LIMITED
-
United Kingdom
-
1 - 100 Employee
-
Project Director
-
Jun 2022 - Present
Project Director for Earls Gate project, UK 1 line EfW plant with steam export and gas fired back-up boilers Section, capacity 216 ktons/year and steam export 64 t/h, gross power 25 MWe, Project revenue ~€175m ● Overall responsibility for the civils and process works in respect of HSE, quality, cost, programme, design, procurement, construction and commissioning ● Leading by example being supporting and challenging in equal, to ensure consistent delivery of the project ● Project Execution Strategy: develop and implement overall strategy for project execution to achieve project performance goals ● Ensuring Safety, Health, Environmental and Quality matters are managed on the Project ● Programme Management: Responsible for delivery of scope safely and to defined schedule and cost parameters ● Communication: represent CNIM to client; control and manage this interface and relationship ● Project Organisation: Set up and secure necessary resources for project execution. Organise project team and ensure that members have clearly identified roles & responsibilities ● Claim Management: Define strategy for claim management and direct actions accordingly. ● Risk and Opportunities: Define Risk Management Plan, update and review risk and opportunities ● Lead and Support the Commercial team in administering subcontracts
-
-
-
CNIM
-
France
-
Industrial Machinery Manufacturing
-
400 - 500 Employee
-
Project Director Civil
-
Dec 2019 - Jul 2020
Civils Project Director on Avonmouth ERF, UK2 lines, capacity 350 ktons/year, gross power 36 MWe, Project revenue ~€250m ● Crisis management: In charge of re-engagement of the supply chain and remobilisation of the civils staff, following administration of Clugston Construction Ltd● Project reorganisation with integrated civils & process teams● Overall responsibility on delivery of the civils part of the project – manage staff, budget, programme, construction, design, quality and HSE ● Strived to achieve Readiness to receive waste and construction completion in June 2020 by leading people and promoting engagement towards delivery
-
-
Project Director
-
Aug 2019 - Dec 2019
Project Director for the pre-engineering phase of Protos ERF, UK, from the Preferred bidder status, 2 lines, capacity 400 ktons/year● Overall responsibility for the EfW process works in respect of HSE, quality, cost, programme, design, procurement, construction and commissioning ● Set up all the preparation of the project, including budget and programme ● Mobilise and engage the team, establish the project organisation chart, plan and manage the JV organisation with civils partner ● Set out project execution plan, quality plan, procurement strategy, construction phasing plan, site logistics
-
-
Site Director
-
Feb 2018 - Aug 2019
Appointed Deputy Project Director and Site Director on Parc Adfer Energy Recovery Facility at Deeside Industrial Park, North Wales Project. The project includes one line of capacity 200,000 tonnes/year, gross electrical power ~19 MWe. Project revenue ~€140m. Role and responsibilities: - Senior site representative of CNIM, Principal Contractor under CDM regulations - Manage all CNIM staff on site - Has overall responsibility for installation of the EfW process plant on site and providing clearleadership and direction to the construction team;- Ensure that the works are undertaken in accordance with all HS&E legislation, and the site Health, Safety and Environmental Plans;- Proactively monitor activities including Construction, installation, testing and commissioning toensure compliance with procedures and certification of the works;- Liaise with the client’s team for all site issues;- Responsible for site communication with any third parties, stakeholders, unions, authorities, etc.; - Ensure the main contract administration with the Project Director;- Monitor CNIM budget and costs with the Project Director;- Responsible for the management of all changes with subcontractors on site.
-
-
-
VINCI ENVIRONNEMENT
-
France
-
Environmental Services
-
1 - 100 Employee
-
Project Director
-
Nov 2005 - Jan 2018
• Manage turnkey/EPC contracts and projects for EfW plants • Drive contracts and projects to meet budget, schedule, quality and performance objectives whilst dealing with HS&E aspects in compliance with company policy • In charge of clients and subcontractors business relationships, co-ordinate multidisciplinary project teams • Strongly involved in technical and process areas to support team engineers, specialised in furnace-boilers and steam thermal cycles for power generation • Main EfW Contracts/Projects executed: Allerton Waste Recovery Park Civils & Process EPC Contract (200 M€), Vernea – EPC Contract (80 M€), Guernsey – Design phase (D&B 80M€), Carrières S/Seine – Design and construction (30 M€), Sotradis (Martinique) - Design phase (30M€) – Projects/tendering: responsible for detailed tenders of several EfW projects in UK: Surrey, N/Yorkshire, Suffolk, Merseyside • Initiated and implemented a Document Management System in the company
-
-
-
-
Project Manager
-
Nov 1999 - Nov 2005
• Responsible of design, fabrication, erection and commissioning of turnkey desalination plants • Contract administration: achieved schedule, budget and quality project goals & managed relationships with clients • Suppliers/subcontractors leading: technical specifications, equipment purchasing, expediting and inspection • Process calculations and equipment design: evaporators, condensers, thermal exchangers, pumps, filters, etc. • Main contracts delivered: China-TEDA (Contract price $10M, Output 10000 m3/day), Kalba-SEWA ($10M, 9000 m3/day), Egypt-SEGAS (€2M, 2 x 216 m3/day), Qatar-RASGAS (€1.6M, 1250 m3/day), Abu Dhabi-Sheikh Zayed ($20M, 8 x 2500 m3/day), Arzew-ENIP (€1.5M, 2400 m3/day)
-
-
-
-
Project engineer (assisting project manager)
-
Jan 1998 - Nov 1999
• Suppliers/subcontractors leading: purchase orders follow-up, inspection and expediting of manufacturers in their factories, supervision of plant erection in the workshop • Technical specifications preparation: pressure vessels, pipeworks, gas compressors, process pumps, etc. • Main Contract achieved: hydro-isomerisation package plant (IFP licensed) for ECOPETROL: design, fabrication and FOB delivery (Contract price €6M) • Suppliers/subcontractors leading: purchase orders follow-up, inspection and expediting of manufacturers in their factories, supervision of plant erection in the workshop • Technical specifications preparation: pressure vessels, pipeworks, gas compressors, process pumps, etc. • Main Contract achieved: hydro-isomerisation package plant (IFP licensed) for ECOPETROL: design, fabrication and FOB delivery (Contract price €6M)
-
-
-
-
Consultant engineer for Environmental issues and energy savings
-
Sep 1996 - Jan 1998
• Technical advisor for energy savings and heat transfer calculations in private housing and large public buildings: heat loss and energy calculations, building heating systems pricing • Expertise in FLUENT CFD calculator for modelling temperature and speed gradients of heated floors • Technical advisor for energy savings and heat transfer calculations in private housing and large public buildings: heat loss and energy calculations, building heating systems pricing • Expertise in FLUENT CFD calculator for modelling temperature and speed gradients of heated floors
-
-
Education
-
Polytech Nantes
Ingénieur, Multidisciplinary Master’s degree, specialised in heat transfer, thermodynamics and fluid dynamic -
Université de Pau et des Pays de l'Adour
Master, Thermique & Energie