Diego Pérez Romero
Assembly, Integration and Functional Test (AIT) Engineer at General Dynamics European Land Systems- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Español Native or bilingual proficiency
-
Inglés Full professional proficiency
-
Alemán Elementary proficiency
Topline Score
Bio
Experience
-
General Dynamics European Land Systems
-
Spain
-
Defense and Space Manufacturing
-
300 - 400 Employee
-
Assembly, Integration and Functional Test (AIT) Engineer
-
Sep 2018 - Present
Achievements: AIT (Assemble, Integration and Test) of 5 Wheeled Armoured Vehicles 8X8 at the Final Assembly Line in the Prototype Phase to the Spanish Army.Tasks:- Coordinate and manage electrical and functional AIT activities for platforms.- Analyze and perform test results, contribution to Non Conformities Reports. Define and support to failure investigations (RCA / FMEA). - Provide shop floor support during tests of several systems such as POWER PLANT, ECS, FUEL, FIRE, HIDROMECHANICAL, PNEUMATIC, ELECTRICAL TESTING, BRAKES. Also, perform the setup and software uploading on the vehicle.
-
-
Functional Test Engineer
-
Feb 2019 - Feb 2019
Training Course: Maintenance and Repair, Baseline Vehicle PIRANHA 5 APC
-
-
Integration and Functional Test Engineer
-
Dec 2016 - Sep 2018
Achievements: Integrate and test 100 Infantry Fighting Vehicles (IFV) within the AJAX Program Office (Ministry of Defence) in order to deliver to the British Army Tasks: - Diagnose and solve electrical / technical / practical problems. Troubleshooting.- Practical / Hands on experience in electrical and functional tests, including set-up and preparation.- Deliver the vehicle through the Quality Assurance Representative of the customer (RAC). Customer support approach.
-
-
Production / Manufacturing Engineer
-
Nov 2015 - Dec 2016
Achievements: Assemble, integrate and test 83 Infantry Fighting Vehicles (IFV) within the Pizarro Program Office (Ministry of Defence) in order to deliver to the Spanish Army Tasks:- Analyze Non Conformities reports. Support troubleshooting and technical problems in the shop floor.- Work as a team member of the MultiFunctionalTeam, together with Engineering / Quality and support other areas.- Take part in components, systems and vehicle tests (integration, static & dynamic, fire...)- Follow up of missing parts.
-
-
-
Airbus
-
France
-
Aviation and Aerospace Component Manufacturing
-
700 & Above Employee
-
Electrical Manufacturing Engineer
-
Nov 2014 - Oct 2015
Achievements: Implementation and development of a fiber optic laboratory at electrical workshop in Pre - FAL Tablada. (On Quality, On Time, On Cost) Tasks: - Manage activities involved in ATA scope (Electrical/Optical installation, harness routings... ATA 24 / 42 / …) - Industrialize Work Orders, BOM, create routings, part list - Provide technical support to Production, in line with Airbus Process Standards when applicable (AIPS/AIPI, I+D-P...). Aeronautic Standards - Take part in multifunctional teams with others departments as Production, Quality, Maintenance, Tooling, Process&Materials, Health and Safety... - Industrialize, develop and implement new procedures and processes (fiber optics cables and harnesses) for A400M / C295 according to company’s processes / standards.
-
-
-
Endesa
-
Spain
-
Utilities
-
700 & Above Employee
-
Electrical Engineer
-
Apr 2013 - Sep 2013
Achievements: make up tools, to automatise and optimise time in incident’s review (VBA). Reduce time in 50%. Tasks: - Review of incident from the call centre and the control centre operators. - Report monthly assessments to manager remote control. - Support for the technical management of the HV, MV and LV remote terminal unit. - Program in VBA. Achievements: make up tools, to automatise and optimise time in incident’s review (VBA). Reduce time in 50%. Tasks: - Review of incident from the call centre and the control centre operators. - Report monthly assessments to manager remote control. - Support for the technical management of the HV, MV and LV remote terminal unit. - Program in VBA.
-
-
-
Magtel
-
Spain
-
Renewables & Environment
-
300 - 400 Employee
-
O&M PV farms
-
Dec 2009 - Dec 2010
Achievements: I was able to manage two PV installation by my own after a few months at the company reporting monthly, quarterly and biannually to the customers, raising 10% the efficiency of the installations (PR) Functions: - Report monthly assessments through PV installation monitoring. - Write a handbook of technical specifications of each PV installation. - Support technical management of the maintenance of photovoltaic system: preventive and corrective maintenance. - Manage people: coordinate and control of team in the plant. - Provide assessment to the costumers. - Support in achievement quality standards and risk prevention.
-
-
Education
-
Universidad de Sevilla
Master of Engineering - MEng, Electricity -
Álvarez & Cía
COACHING EJECUTIVO / INTELIGENCIA EMOCIONAL -
Airbus Defense&Space
PG Dip Global Supply Chain & Aeronautical Industry Operations VI Edition, Airbus Defence and Space -
Universidad de Sevilla
Bachelor of Engineering - BEng, Electricity