Debjit Sanpui

Project Manager || Engineering Department Manager at China Petroleum
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Debabrata Samanta , B.E., PGDM,PMP ®, FIE, CPCM,CPPP

Debjit is thorough on his field of process knowledge and implementation of the same in project. He has potential to grow and can take bigger responsibility including interdisciplinary management. His communication skill is good.

Siddhartha Mazumdar

I have been acquainted with Debjit for four years in my capacity of Manager Projects and Execution for Emirates National Oil Company. Debjit worked as an Engineering Manager on behalf of Punjlloyd for the Construction of Bulk Liquid Terminal facility along with 60 km pipeline to Dubai International Airport for a project value of USD 150 Million. Debjit distinguished himself by consistently given input to various Engineering challenges encountered on this project with his in depth knowledge of various discipline. He possesses high intelligent, good analytical and communication skills and a pleasant disposition under pressure conditions. I would rank him as one of the best Engineering I have worked with in my career.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Design Services
    • 100 - 200 Employee
    • Project Manager || Engineering Department Manager
      • Dec 2020 - Present

      Main Responsibilities: • Oversight of the work undertaken by the dedicated Project team, under the supervision of the Engineering Manager. • Interface with COMPANY on matters that need specific attention, as necessary. • Liaising, interfacing and coordinating with the different functions and disciplines of the ENGINEER engineering team; highlights any problems and resolving any issues in the best possible interest of the Project. • Ensure complete, correct and timely flow of information to the COMPANY, as well as with the members of the ENGINEER’s Project / engineering team. • To define the strategies to be followed, reviews the critical areas, approves the Project control documents and issues to the COMPANY. • Ensures the correct allocation of the resources necessary for carrying on and completing the Project. • To monitor the management of the SUBCONTRACTORs during all the Project phases in order to ensure the conformity of the work with the contract specifications. • Produces a Project close-out report containing all significant information for future use by the COMPANY. • Efficient management of cost, scope, schedule and proper monitoring and implementation of contract terms. • Managing the entire Engineering Department Show less

    • India
    • Oil and Gas
    • 1 - 100 Employee
    • Director and Chief Operating Officer
      • Mar 2016 - Dec 2020

      Project: Upgradation of Al-Luihaiss Degassing Station and FEED for booster Hydrocarbon compressor station Client: South Oil Company, Basra, Iraq Project comprises of Separator Vessels, Crude oil storage Tanks, HC Gas Booster Compressor, Flare, Nitrogen and Instrument Air package, Crude oil discharge & booster pumps. Project: Detailed Engineering and Corrosion Monitoring System for 42” 100 km Crude Pipeline Client: South Oil Company, Basra, Iraq Project comprises 100 km 42” crude pipeline with 5 intermediate block valve stations, Crossing monitoring has been done with Corrosion coupon and ER probes. Project: Conceptual & Detailed Engineering for Ajeel Gas Compressor Station Client: Basra Oil Company, Basra, Iraq Project comprises of different pressure stage HC Gas Compressors, Fliters, Scrubbers, Vessels, Air coolers, Flare, Nitrogen and Instrument Air package, Fire water, Service water system and Plant buildings. Project: Detailed Engg. for Produced Water Treatment Plant and HCU Unit Client: GAZPROM, Baghdad, Iraq Project comprises of Chemical injection packages, Produced water treatment package, Horizontal combustion Flare, Nitrogen and Instrument Air package, Fire water, Service water system, OWS System and Control room. Project: Detailed Engineering for HC tanker loading facility, Interconnecting Piping, OWS System and Detailed Engineering for LPG Pumping, Pipeline and End Stations Client: ONGC Mangalore Petrochemicals, India Project comprises of HC tanks, Tanker loading, 93 km 30” LPG pipeline, Filters, Nitrogen and Instrument Air package, Fire water, Service water system, OWS System and Control room. Project: Conceptual, FEED and Detailed Engineering for LPG storage and Handling System Client: RAK GAS, UAE LPG storage Spheres, Bullets, Pumps, Ship loading / unloading system, Road Tanker loading system, Single point Mooring, Sub-sea Pipeline, Nitrogen and Instrument Air package, Fire water, Service water system and Plant buildings. Show less

    • India
    • Oil and Gas
    • 200 - 300 Employee
    • Associate Vice President
      • Aug 2010 - Mar 2016

      Role: Department Manager – Process Engineering Managing a team of 50 Process and HSE Engineers. Activities involved – - Administrative works to run the complete discipline - Updation of Process Work Procedures, Standards, Checklist as per Company Quality policy - Training the Middle / level Junior team members to enhance their knowledge - Support to ongoing Projects for closure of Process related matters - Inter-discipline coordination – mainly with Instrumentation & Piping for smooth delivery - Value addition presentation for FEED / EPC Projects - Critical Document Review for various on-going Projects - Project site support for pre-commissioning and start-up Role: Department Manager – Proposal Engineering Engineering Managing a team of 15 Multi-discipline Engineers. Activities involved – - Administrative works to run the complete discipline - Updation of Pre-bid procedure, implementation of Pre-bid data base and mail server - Review of ITB packages, Pre-bid MTO, MRs, RFQ, Basis - Estimation of Engineering Hrs. and preparation of Level 2 schedule - Preparation of Enginnering Cost Sheet for the Management approval - Pre-bid presentation to Clients and attend the Pre-bid clarification meetings Project Engineering Manager --------------------------------------- Project completed : 1. Water filtration and pumping (Feed / Conceptual Engineering) for UAE Client 2. Jet fuel storage, pumping and supply (Detailed Engineering) for UAE Client On going Projects with me : 1. Gas gathering station (Detailed Engineering) for Indian PSU : 99% completed 2. Infra Project for UAE Client (Detailed Engg.) - 70% completed. Working part time 3. Detailed Engineering for LOBP, GMP plant for Singapore Client - 40% completed: presently not working in this Project. Show less

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Principal Engineer
      • Apr 2007 - Aug 2010

      - Involved in FEED, FEED Update and EPC of O&U Units and Interconnecting P&IDs/Interface management for different Clients. - Simulation for Chemical Plants - Involved in FEED, FEED Update and EPC of O&U Units and Interconnecting P&IDs/Interface management for different Clients. - Simulation for Chemical Plants

    • United States
    • Construction
    • 700 & Above Employee
    • Process Specialist
      • Aug 2006 - Mar 2007

      - Involved in KNPC, Kuwait Fire Water Network analysis - Developed Chemical Injection System for KOC, Kuwait - Involved in KNPC, Kuwait Fire Water Network analysis - Developed Chemical Injection System for KOC, Kuwait

    • India
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Research Scientist
      • 2004 - 2006

      - Scale up for three APIs - Process upgradation from Lab scale to Pilot/Plant scale - Scale up for three APIs - Process upgradation from Lab scale to Pilot/Plant scale

    • Oil and Gas
    • 700 & Above Employee
    • Sr. Process Engineer
      • 2003 - 2004

      Lead Process Engineer - Pre-bid work for IFFCO Plants - Phulpur - Pre-bid work/Simulation for MRPL mixed xylene project Lead Process Engineer - Pre-bid work for IFFCO Plants - Phulpur - Pre-bid work/Simulation for MRPL mixed xylene project

    • Oil and Gas
    • 100 - 200 Employee
    • Sr. Process Engineer
      • 2002 - 2003

      - Feasibility study for SBR - ARU/SWS inhouse BEP development - Feasibility study for SBR - ARU/SWS inhouse BEP development

Education

  • Indian Institute of Technology, Kanpur
    Ph.D., Engineering
    1999 - 2002
  • Jadavpur University
    Engineering
    1989 - 1993

Community

You need to have a working account to view this content. Click here to join now