Corin Bridson

Technical Manager (Central) at Breedon Ireland
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dublin City, County Dublin, Ireland, IE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Technical Manager (Central)
      • Aug 2016 - Present

      With a heritage spanning over 50 years, the Lagan Group companies rank among the leading quarry materials, cement, house building, construction products and civil engineering companies in Ireland and the UK. With a heritage spanning over 50 years, the Lagan Group companies rank among the leading quarry materials, cement, house building, construction products and civil engineering companies in Ireland and the UK.

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Chair - Irish Branch Committee
      • Jun 2019 - Jun 2021

    • Ireland
    • Wholesale Building Materials
    • 100 - 200 Employee
    • Roadsurfacing Technical Manager
      • Mar 2015 - Aug 2016

      For the past fifty years Kilsaran International, a family owned and run business, has been synonymous with innovative concrete and asphalt products in Ireland and the UK. Kilsaran are one of the leading suppliers of bituminous products in Ireland supplying a full range of both Irish/European standard products and proprietary products to satisfy the needs of the transport and construction industry. For the past fifty years Kilsaran International, a family owned and run business, has been synonymous with innovative concrete and asphalt products in Ireland and the UK. Kilsaran are one of the leading suppliers of bituminous products in Ireland supplying a full range of both Irish/European standard products and proprietary products to satisfy the needs of the transport and construction industry.

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Quality Manager
      • Aug 2014 - Mar 2015

      The N11 PPP Contract includes 5 sections of work which are the new N11 dual carriageway linking the existing Ashford - Rathnew motorway to the existing N11 Arklow Bypass, the new interchange and service area alongside the existing Gorey Bypass, the new grade separated interchange at the N7 Newlands Cross in Dublin which will remove the last set of traffic signals between the border and Cork, Limerick and Waterford and the upgrade of infrastructure on the existing Arklow and Gorey Bypasses and the Operation and Maintenance of the existing Arklow and Gorey Bypasses for 25 years. Show less

    • Materials Manager
      • Feb 2014 - Jul 2014

      The N11 PPP Contract includes 5 sections of work which are the new N11 dual carriageway linking the existing Ashford - Rathnew motorway to the existing N11 Arklow Bypass, the new interchange and service area alongside the existing Gorey Bypass, the new grade separated interchange at the N7 Newlands Cross in Dublin which will remove the last set of traffic signals between the border and Cork, Limerick and Waterford and the upgrade of infrastructure on the existing Arklow and Gorey Bypasses and the Operation and Maintenance of the existing Arklow and Gorey Bypasses for 25 years. Show less

    • United States
    • Construction
    • 700 & Above Employee
    • Environmental & QA Manager
      • Jan 2012 - Jan 2014

      The €23million N3 project included the design and construction of 7km single carriageway road through a complex area of loughs, rivers, bog and drumlin and includes significant excavation and replace of peat bog. The alignment passed through the Lough Oughter & Associated Loughs candidate Special Area of Conservation (cSAC) which is protected under the European Habitats Directive. The project included two significant bridges; the 3 span 142m River Erne Bridge constructed as a cable stayed bridge of the extradosed variety which was the first of its kind to be constructed in Ireland and the 3 span 231m Aghnaguig Bog Bridge constructed as a balanced cantilever using a travelling shutter system. Show less

    • Ireland
    • Wholesale Building Materials
    • 100 - 200 Employee
    • Assistant Contracts Manager
      • Sep 2011 - Dec 2011

    • Industrial Machinery Manufacturing
    • 400 - 500 Employee
    • Manager - Construction Materials Testing
      • Sep 2010 - Jun 2011

      Exova Metlab (formally Bodycote Testing) had two permanent civil material testing laboratories in Dublin and Cork and a further site laboratory on the N7 Castletown to Nenagh motorway scheme. Exova Metlab (formally Bodycote Testing) had two permanent civil material testing laboratories in Dublin and Cork and a further site laboratory on the N7 Castletown to Nenagh motorway scheme.

    • Materials Engineer
      • Nov 2007 - Aug 2010

      The €500million M3 Motorway constructed as a Private Public Partnership (PPP) consisted of 63km of motorway/dual carriageway including a total of 98 structures, 2 toll plazas and a further 60km of side roads. The alignment of the road bisected the historic and sensitive Tara – Skyne Valley.

    • Quality Assurance Inspector
      • Mar 2006 - Oct 2007

      The €95million design and build contract was a cross boarder job which included the construction of 9.4 km of dual carriageway through County Louth in the Republic of Ireland and 4.6 km in Co Armagh, Northern Ireland.

    • Quality Assurance Inspector
      • Jun 2005 - Mar 2006

      The €350million PPP scheme was the first of its type in Ireland and included the construction of 39km of motorway through 3 counties and included 18 over bridges, 2 online river bridges and a toll plaza and associated buildings.

    • Senior Laboratory Technician
      • Aug 2004 - May 2005

      N4/N6 Kinnegad-Kilkock N4/N6 Kinnegad-Kilkock

    • Concrete Technician
      • May 2004 - Jul 2004

    • Concrete Batching Plant Co-Ordinator
      • Nov 2002 - Apr 2004

      Dublin Port Tunnel

    • Laboratory Technician
      • Aug 2002 - Oct 2002

  • STATS Ltd
    • Kent, England
    • Senior Laboratory Technician
      • May 2002 - Jun 2002

      Channel Tunnel Rail Link CTRL Contract 320 - Thames Crossing Tunnel CTRL Contract 342 - 3.5km of Section 2 of the CTRL Project. Channel Tunnel Rail Link CTRL Contract 320 - Thames Crossing Tunnel CTRL Contract 342 - 3.5km of Section 2 of the CTRL Project.

    • Farm Worker
      • Mar 2002 - May 2002

    • New Zealand
    • Civil Engineering
    • 1 - 100 Employee
    • Laboratory Supervisor
      • Nov 1999 - Jan 2002

      IANZ Accredited Civil Materials Testing Laboratory IANZ Accredited Civil Materials Testing Laboratory

    • New Zealand
    • Civil Engineering
    • 700 & Above Employee
    • Laboratory Technician
      • Mar 1998 - Oct 1999

      IANZ Accredited Civil Materials Testing Laboratory IANZ Accredited Civil Materials Testing Laboratory

Education

  • Unitec | Te Pūkenga
    NZCE, Civil Engineering
    1996 - 1999

Community

You need to have a working account to view this content. Click here to join now