Bob Amaral

Superintendent at Griffith Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Escondido, California, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • 10-Hour Safety
    OSHA
  • Confined Space Rescue
    -
  • Confined Spaces
    -
  • Fall Protection Awareness
    -
  • First Aid
    -
  • LA City Certified Welder
    -
  • Repiratory Protection/Fit Testing
    -
  • Scaffold Awareness Training
    -
  • Trenching/Shoring
    -

Experience

    • United States
    • Construction
    • 200 - 300 Employee
    • Superintendent
      • Mar 2007 - Present

      Supervise, schedule direct all field staff. Monitor Safety and schedule for the constructiion of multiple projects including: Coachella Ave 54 Wastwater Treatment Plant Upgrade Perris Raw Water Augmentation Pump Station Poche Beach UV Bacterial Disinfection System LADWP Van Norman Chloramination Stations 1&2 LADPW Morris Dam Retrofit of slidegate and fixed cone valves Reporting direct to Project Manager and Division Vice President. Supervise, schedule direct all field staff. Monitor Safety and schedule for the constructiion of multiple projects including: Coachella Ave 54 Wastwater Treatment Plant Upgrade Perris Raw Water Augmentation Pump Station Poche Beach UV Bacterial Disinfection System LADWP Van Norman Chloramination Stations 1&2 LADPW Morris Dam Retrofit of slidegate and fixed cone valves Reporting direct to Project Manager and Division Vice President.

    • United States
    • Construction
    • 200 - 300 Employee
    • Senior Foreman / Field Superintendent
      • Aug 1997 - Mar 2007

      Foreman for Pile Driving and Welding. Projects include: Burro Creek Bridge Metropolitan Water District Intake Water Tower (Lake Matthews) Lake Hodges Coffer Dam System for Generator Installation Fish Elevator System (WA) Long Beach Pier 400 first and second stage Vincent Thomas Bridge Retrofit Coronado Bridge Retrofi Evergreen Container Pier Widening (San Pedro) Chinaland Pier Gerald Desmond Bridge Retrofit This role included underwater welding and barge work. I was elevated to Field Superintendent for the last several years in this position. Show less

    • Pile Driver/Welder
      • Jun 1995 - Nov 1996

      Leading hand / welder (LA City Certified) for pile driving crew for HWY 56 to HWY 5 Interchange. Leading hand / welder (LA City Certified) for pile driving crew for HWY 56 to HWY 5 Interchange.

    • Construction
    • 700 & Above Employee
    • Millwright / Welder Foreman
      • Sep 1977 - 1984

      Worked on the San Onofre Nuclear Power Plant as a Millwright/Welding Foreman. My responsibilities included: Rigging, Installation, Alignment and maintenance of heavy machinery, both outside and inside; 11000 megawatt generators; pumps; reactor coolant pumps; cranes; conveyor lines and turbines. This work also included working within the core after commissioning of the power plant. Worked on the San Onofre Nuclear Power Plant as a Millwright/Welding Foreman. My responsibilities included: Rigging, Installation, Alignment and maintenance of heavy machinery, both outside and inside; 11000 megawatt generators; pumps; reactor coolant pumps; cranes; conveyor lines and turbines. This work also included working within the core after commissioning of the power plant.

Community