Nur Setianto Suroto
Sr. Engineer Facility at Pertamina Hulu Energi OSES- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Pertamina Hulu Energi OSES
-
Indonesia
-
Oil and Gas
-
100 - 200 Employee
-
Sr. Engineer Facility
-
Sep 2018 - Present
Engineering Section at Facility & Integrity Department Facility (top side) engineer for brownfield/ modification projects, including to prepare in-house engineering document (drawing and construction) and project budget proposals. Key Achievements: - PMT for EPCI 20" Subsea Pipeline Repair Pebelokan-GMS - FEED Study NEIA Development - Zahra Angel Cluster Development - Technical Management of Change (TMoC) Database Development Engineering Section at Facility & Integrity Department Facility (top side) engineer for brownfield/ modification projects, including to prepare in-house engineering document (drawing and construction) and project budget proposals. Key Achievements: - PMT for EPCI 20" Subsea Pipeline Repair Pebelokan-GMS - FEED Study NEIA Development - Zahra Angel Cluster Development - Technical Management of Change (TMoC) Database Development
-
-
-
-
-
Jan 2017 - Sep 2018
Engineering Section at Facilities DepartmentManaging and controlling project engineer team for brownfield/ modification projects, including to prepare in-house engineering document (drawing, construction and MTO).Key Achievements:- 6" subsea pipeline repair Rama H to Rama P - GCU#4 reactivation and reutilization- PMT for EPCI 20" Subsea Pipeline Repair Pebelokan-GMS
-
-
-
Jul 2011 - Dec 2016
Project Management Team (PMT) role for Greenfield Projects, namely: EPCI of Banuwati-K Gas Compressor Platform and EPCI of Mila-A & Asti-A Platforms Pipelines.Key Achievements:- Total Project budget was >US$100 MM- The projects are already completed.- Actual cost/ spending is still within project budget. - Develop and monitoring S-Curve Projects.- Planned and executed all supporting contract for both EPCI Projects.
-
-
-
Jan 2010 - Jun 2011
Relocation Project of Turbines & Gas Conditioning Units (GCU) and Develop CMMS of New Mars 100 Turbines.Key Achievements:- Maintain SAP asset register (functional locations & equipment).- Optimize maintenance scheduling for Planned Maintenance (PM02).- Develop a custom report for daily performance measurement.- Started up, pre-commissioned & commissioned Turbines and GCU after being relocated.
-
-
-
Feb 2008 - Dec 2009
Liaison officer for Users (Business Units) and Procurement Department, also set up new position formula for Maintenance Engineer other Dept.Key Achievements:- Developed Maintenance Engineer's new positions- Developed technical requirements, scope of work and schedule of rate for bidding process.- Review contractor's technical and commercial proposal.
-
-
-
Mar 2006 - Jan 2008
Maintain, repair & troubleshoot platform’s instrumentation system, including monitoring & providing instrument spare parts and scheduling manpower for daily instrument activities.Key Achievements:- Increase instrument system availability and reliability by improving preventive maintenance.
-
-
Education
-
Universitas Gadjah Mada (UGM)
Bachelor's degree, Engineering Physics -
University of Indonesia
Master's degree, Energy Management and Systems Technology/Technician -
SMU Negeri 1 Surakarta
Senior High School, Natural Sciences -
SMP Negeri 1 Surakarta
Junior High School