Nur Setianto Suroto

Sr. Engineer Facility at Pertamina Hulu Energi OSES
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jakarta, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Oil and Gas
    • 100 - 200 Employee
    • Sr. Engineer Facility
      • Sep 2018 - Present

      Engineering Section at Facility & Integrity Department Facility (top side) engineer for brownfield/ modification projects, including to prepare in-house engineering document (drawing and construction) and project budget proposals. Key Achievements: - PMT for EPCI 20" Subsea Pipeline Repair Pebelokan-GMS - FEED Study NEIA Development - Zahra Angel Cluster Development - Technical Management of Change (TMoC) Database Development Engineering Section at Facility & Integrity Department Facility (top side) engineer for brownfield/ modification projects, including to prepare in-house engineering document (drawing and construction) and project budget proposals. Key Achievements: - PMT for EPCI 20" Subsea Pipeline Repair Pebelokan-GMS - FEED Study NEIA Development - Zahra Angel Cluster Development - Technical Management of Change (TMoC) Database Development

      • Jan 2017 - Sep 2018

      Engineering Section at Facilities DepartmentManaging and controlling project engineer team for brownfield/ modification projects, including to prepare in-house engineering document (drawing, construction and MTO).Key Achievements:- 6" subsea pipeline repair Rama H to Rama P - GCU#4 reactivation and reutilization- PMT for EPCI 20" Subsea Pipeline Repair Pebelokan-GMS

      • Jul 2011 - Dec 2016

      Project Management Team (PMT) role for Greenfield Projects, namely: EPCI of Banuwati-K Gas Compressor Platform and EPCI of Mila-A & Asti-A Platforms Pipelines.Key Achievements:- Total Project budget was >US$100 MM- The projects are already completed.- Actual cost/ spending is still within project budget. - Develop and monitoring S-Curve Projects.- Planned and executed all supporting contract for both EPCI Projects.

      • Jan 2010 - Jun 2011

      Relocation Project of Turbines & Gas Conditioning Units (GCU) and Develop CMMS of New Mars 100 Turbines.Key Achievements:- Maintain SAP asset register (functional locations & equipment).- Optimize maintenance scheduling for Planned Maintenance (PM02).- Develop a custom report for daily performance measurement.- Started up, pre-commissioned & commissioned Turbines and GCU after being relocated.

      • Feb 2008 - Dec 2009

      Liaison officer for Users (Business Units) and Procurement Department, also set up new position formula for Maintenance Engineer other Dept.Key Achievements:- Developed Maintenance Engineer's new positions- Developed technical requirements, scope of work and schedule of rate for bidding process.- Review contractor's technical and commercial proposal.

      • Mar 2006 - Jan 2008

      Maintain, repair & troubleshoot platform’s instrumentation system, including monitoring & providing instrument spare parts and scheduling manpower for daily instrument activities.Key Achievements:- Increase instrument system availability and reliability by improving preventive maintenance.

Education

  • Universitas Gadjah Mada (UGM)
    Bachelor's degree, Engineering Physics
    2000 - 2005
  • University of Indonesia
    Master's degree, Energy Management and Systems Technology/Technician
    2020 - 2022
  • SMU Negeri 1 Surakarta
    Senior High School, Natural Sciences
    1997 - 2000
  • SMP Negeri 1 Surakarta
    Junior High School
    1994 - 1997

Community

You need to have a working account to view this content. Click here to join now