Muhamad Shahzeb Elahi
Project Planning & Coordinator at Habib Construction Services (Pvt) Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Six Sigma Yellow Belt Professional
6sigmastudy - The global certification body for six sigma certificationsJan, 2023- Oct, 2024 -
Registered engineer
Pakistan Engineering Council (PEC)Sep, 2017- Oct, 2024 -
Agile Project Management
University of Colorado Boulder -
Construction Management Specialization
Columbia University -
Corporate Financial Decision-Making for Value Creation
University of Melbourne -
Credentials Evaluation
American Council on Education -
Employment Contracts
University of Pennsylvania -
Engineering Project Management Specialization
Rice University School of Engineering -
Fundamentals of Project Planning and Management
University of Virginia -
Getting Started with Power BI Desktop
Coursera -
Global sustainability and corporate social responsibility: Be sustainable
Macquarie University Engineering -
Google Project Management Certificate
Google -
Project Execution and Control
University of Illinois at Urbana-Champaign, School of Information Sciences -
Project Management & Other Tools for Career Development Specialization
University of California, Irvine Division of Continuing Education I Coursera -
Risk Management Specialization
New York Institute of Finance -
Six Sigma Green Belt Specialization
University System of Georgia -
Six Sigma Yellow Belt Specialization
University System of Georgia -
Sustainable Cities Specialization
The Johns Hopkins University
Experience
-
Habib Construction Services (Pvt) Limited
-
Pakistan
-
Civil Engineering
-
100 - 200 Employee
-
Project Planning & Coordinator
-
May 2023 - Present
𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐍𝐚𝐦𝐞: Urban Regeneration of Walton Airport Project𝐒𝐩𝐨𝐧𝐬𝐨𝐫 / 𝐂𝐥𝐢𝐞𝐧𝐭: Punjab Central Business District Development Authority (PCBDDA).𝗖𝗼𝗻𝘀𝘂𝗹𝘁𝗮𝗻𝘁 : NESPAK𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐬:• Road Works • Series of Network of Roads• Sewerage System • Storm Water Drainage Works• Fire Fighting Works • Electrical Works• Ancillary Works
-
-
Project Planning & Coordinator
-
Oct 2017 - Present
Planning all work schedules. Preparing and submitting weekly & monthly report, Cash Flows, Rate Analysis to Steering Committee and Change Control Board. Preparing S-Curve, Man power, Histogram, Resource, Material & Cost loading etc. in the program as required from client. Prepare Manpower and Equipment Schedules in close collaboration with Estimation Manager/ Project Manager. Attending meetings with Client on site & full-fill their requirement. Dealing with supplier to convince correct requirement on site. Preparing Detailed Project Baseline Programme in accordance with Approved Planning Process and Procedures Manual. Preparing KPI Sheets of project and update them on daily basis. Raised inspections, collecting approved QC documents and done quantity survey. Providing analysis and recommendations as to corrective action based upon planning data. Show less
-
-
Project Planning & Coordinator
-
Oct 2022 - May 2023
𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐍𝐚𝐦𝐞: Remodeling of Main Boulevard from Liberty Chowk to Kalma Chowk (CBD Square)𝐒𝐩𝐨𝐧𝐬𝐨𝐫 / 𝐂𝐥𝐢𝐞𝐧𝐭: Punjab Central Business District Development Authority (PCBDDA).𝗖𝗼𝗻𝘀𝘂𝗹𝘁𝗮𝗻𝘁 : NESPAK𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐬:No of underpasses: 3• Ali Zaib Underpass• CBD Underpass• Kalma Underpass ExtensionRoad WorksDrainage WorksHSE WorksFinishing / Architectural Works
-
-
Planning Engineer
-
May 2021 - Sep 2022
-
-
Planning Engineer
-
Apr 2019 - Jun 2020
-
-
Planning Engineer
-
Apr 2019 - Jun 2020
-
-
-
Habib Construction Services (Pvt) Limited
-
Civil Engineering
-
1 - 100 Employee
-
Project Planning & Coordinator
-
May 2023 - Present
𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐍𝐚𝐦𝐞: Construction of Flyover at Akbar Chowk. 𝐒𝐩𝐨𝐧𝐬𝐨𝐫 / 𝐂𝐥𝐢𝐞𝐧𝐭: Lahore Development Authority (LDA) 𝗖𝗼𝗻𝘀𝘂𝗹𝘁𝗮𝗻𝘁 : NESPAK 𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐬: • Road Works • Structure (Flyovers) • Structure (Covered Nullah Drain) • Drainage & Erosion Works) • Electrical Works • Ancillary Works • U-Turns 𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐍𝐚𝐦𝐞: Construction of Flyover at Akbar Chowk. 𝐒𝐩𝐨𝐧𝐬𝐨𝐫 / 𝐂𝐥𝐢𝐞𝐧𝐭: Lahore Development Authority (LDA) 𝗖𝗼𝗻𝘀𝘂𝗹𝘁𝗮𝗻𝘁 : NESPAK 𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐬: • Road Works • Structure (Flyovers) • Structure (Covered Nullah Drain) • Drainage & Erosion Works) • Electrical Works • Ancillary Works • U-Turns
-
-
-
PMO ( Project Management Office for Punjab )
-
Lahore, Pakistan
-
Trainee
-
Apr 2017 - Jun 2017
Working as Contract Manager in PMO Barrage a management unit of Irrigation Department Punjab. Operating Tenders, Bidding, Contract Letters (Acceptance, tender, notifications, proposals, notices, applications, permissions, and authorities) and regulations of GCC, PCC by FIDIC (International Federation of Consulting Engineers). Working as Contract Manager in PMO Barrage a management unit of Irrigation Department Punjab. Operating Tenders, Bidding, Contract Letters (Acceptance, tender, notifications, proposals, notices, applications, permissions, and authorities) and regulations of GCC, PCC by FIDIC (International Federation of Consulting Engineers).
-
-
-
TEPA ( Traffic Engineering & Planning Agency )
-
Lahore, Pakistan
-
Trainee
-
Jan 2017 - Apr 2017
Worked on Orange line Project, Sight Area mainly barrels passing through Jian Mandir, hall road, anarkali, mall road via Traffic Engineering & Planning Authority (TEPA) Lahore. Supervising construction of subway barrels, its foundation with columns formwork, concreting of inner columns with latest technology of shooting concrete, installation of HVACS, cables and electric plates by which the train will run and pavement of road inside the barrel. Worked on Orange line Project, Sight Area mainly barrels passing through Jian Mandir, hall road, anarkali, mall road via Traffic Engineering & Planning Authority (TEPA) Lahore. Supervising construction of subway barrels, its foundation with columns formwork, concreting of inner columns with latest technology of shooting concrete, installation of HVACS, cables and electric plates by which the train will run and pavement of road inside the barrel.
-
-
-
C&W ( Communication & Works Department )
-
Lahore, Pakistan
-
Trainee
-
May 2016 - Sep 2016
Worked as Estimator on Calculation and estimation of Multiple Gov. Projects, costs and their billing via C&W. Covered no of projects based upon detailed, model, parametric, comparison estimate and unit based estimation. Worked as Estimator on Calculation and estimation of Multiple Gov. Projects, costs and their billing via C&W. Covered no of projects based upon detailed, model, parametric, comparison estimate and unit based estimation.
-
-
-
LDA ( Lahore Development Authority )
-
Lahore, Pakistan
-
Trainee
-
Jun 2015 - Sep 2015
Worked with Site Engineer on Ravi Bridge Project for Road extension via Lahore Development Authority. Project working meanwhile was on the construction of Piers from its base such as trimming etc and the placement of girder and slabs. Worked with Site Engineer on Ravi Bridge Project for Road extension via Lahore Development Authority. Project working meanwhile was on the construction of Piers from its base such as trimming etc and the placement of girder and slabs.
-
-
-
Habib Construction JV Maqbool Calsons Pvt ltd.
-
Lahore, Pakistan
-
Trainee
-
Jan 2015 - Mar 2015
Worked with Sight Engineer on Orange Line Project (Transom Section), Kharak Nala Location via Lahore Development and Authority. Focused areas of Beam Formwork, Column Formwork, Plastic Formwork and the formwork of shaft and their steeling. Worked with Sight Engineer on Orange Line Project (Transom Section), Kharak Nala Location via Lahore Development and Authority. Focused areas of Beam Formwork, Column Formwork, Plastic Formwork and the formwork of shaft and their steeling.
-
-
Education
-
Bahria University
Master of Philosophy - MPhil, Project Management -
Imperial College of Business & Studies
Bachelor of Science - BS, Civil Engineering -
Punjab Group of Colleges
FSc Pre Engineering, Engineering -
Jauhar Foundation High School
Matric, Science