Ahmed Mutwakil
Civil Engineer (Utility Infrastructure, Stakeholder Interface and Estimation) at FAST CONSORTIUM- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Arabic Native or bilingual proficiency
-
Hindi Elementary proficiency
Topline Score
Bio
Venkatesh Dontha
good nature with hard working
Abdul Shukoor
I had the pleasure of working with Ahmed for 2 years at Al Rashid Trading & Contracting in KAP4 Project.Ahmed is a kind, confident and intelligent man with always smile in his face.His knowledge in Engineering particularly in Quantity Surveying and Contract Administration was excellent.
Venkatesh Dontha
good nature with hard working
Abdul Shukoor
I had the pleasure of working with Ahmed for 2 years at Al Rashid Trading & Contracting in KAP4 Project.Ahmed is a kind, confident and intelligent man with always smile in his face.His knowledge in Engineering particularly in Quantity Surveying and Contract Administration was excellent.
Venkatesh Dontha
good nature with hard working
Abdul Shukoor
I had the pleasure of working with Ahmed for 2 years at Al Rashid Trading & Contracting in KAP4 Project.Ahmed is a kind, confident and intelligent man with always smile in his face.His knowledge in Engineering particularly in Quantity Surveying and Contract Administration was excellent.
Venkatesh Dontha
good nature with hard working
Abdul Shukoor
I had the pleasure of working with Ahmed for 2 years at Al Rashid Trading & Contracting in KAP4 Project.Ahmed is a kind, confident and intelligent man with always smile in his face.His knowledge in Engineering particularly in Quantity Surveying and Contract Administration was excellent.
Credentials
-
Member of The Project Management Institute
Project Management InstituteJan, 2020- Nov, 2024 -
Basics of Finance (Certificate)
HP Life E-LearningMar, 2019- Nov, 2024 -
Strategic Planning (Certificate)
HP Life E-LearningMar, 2019- Nov, 2024 -
Civil Engineer (Degree)
Saudi Council of EngineersAug, 2013- Nov, 2024 -
Primavera P6 Enterprise (Certificate)
University of KhartoumApr, 2013- Nov, 2024 -
Construction Sites Management (Certificate)
University of KhartoumMar, 2013- Nov, 2024 -
ETABS and SAFE Structural Analysis (Certificate)
University of KhartoumFeb, 2013- Nov, 2024 -
AutoCAD 2D and 3D (Certificate)
University of KhartoumMay, 2011- Nov, 2024
Experience
-
FAST CONSORTIUM
-
Saudi Arabia
-
Construction
-
100 - 200 Employee
-
Civil Engineer (Utility Infrastructure, Stakeholder Interface and Estimation)
-
Oct 2016 - Present
1) Technical management and end-to end delivery of infrastructure projects. 2) Provide infrastructure utility design packages, supervision and management. 3) Maintain the accordance with local authorities’ standards and international codes.4) Liaising with the client, securing approvals, finalization of the specifications, reporting and handover.5) Managing utility works including, but not limited to, wet & dry utility diversions affecting the metro project, storm drainage networks along the streets adjacent to metro lines, including connections to existing storm mains, sewage networks to provide future house connections for all plots along the metro lines, potable water and sewage water networks, irrigation pumping stations and irrigation networks along the concerned metro lines.6) Weekly progress review, quality and safety meetings with the client.7) Preparation of Plan layouts concerning the Wet Utilities (Potable Water, wastewater, irrigation and Stormwater Networks).8) Submission of the Utilities Working Group Packages (UWG) Design & Handover Packages towards the clients and the concerned stakeholders.9) Liaising with Utility Agencies (Wet & Dry Utilities) and Contractors, regarding construction approvals, design changes and shutdowns of existing services.10) Participating in the hydraulic design and calculations involving the relocation of the wet utilities (Storm Water Drainage, Irrigation, potable & waste water networks).11) Developing baselines, monitoring & controlling utilities diversions cope with respect to cost, resource deployment, time overruns and quality compliance to ensure satisfactory.12) Preparing & reviewing method statements, work specific project quality plan & control plan as per specifications of contract documents.
-
-
-
TikTok
-
United States
-
Entertainment Providers
-
700 & Above Employee
-
Voiceover Artist | Content Creator
-
Nov 2021 - Present
Content Creator and Voiceover artist. https://www.tiktok.com/@muto_the_one Content Creator and Voiceover artist. https://www.tiktok.com/@muto_the_one
-
-
-
D Family
-
United Arab Emirates
-
Musicians
-
Voiceover Artist
-
Dec 2020 - Present
Voiceover artists provide voices for animated characters including those in feature films, television programmers and animated short films, narrate documentaries, voiceovers in television and radio commercials. Voiceover artists provide voices for animated characters including those in feature films, television programmers and animated short films, narrate documentaries, voiceovers in television and radio commercials.
-
-
-
Al Rashid Trading & Contracting Company (Closed Joint Stock Company)
-
Saudi Arabia
-
Civil Engineering
-
700 & Above Employee
-
Civil Engineer (Estimation, Quantity Surveying and Infrastructure).
-
Apr 2014 - Sep 2016
1) Conducted Cost and Feasibility Analysis; monitored the project costs and purchase orders (site based).2) Provided complete assistance to the Procurement Department of the project, regarding finalization of contracts and delivery orders. 3) Ensured that all proposals are cost effective, technically viable and in accordance with the customer specific requirements4) Insured the preparation cost, man - hour and cash forecasts based on the updated progress, forecasts and trends.5) Maintained cost history records for each major project area and domains.6) Ensure that all the works are going without wastage of material.7) Elevated productivity by 45% by providing apposite leadership to 10 subcontractors onsite, and consulting site managers on work shifts. 8) Effectively obtained client acceptance / approval on project’s implementation.9) Obtaining Interim Payment Certificates, Sub-Contract Payment Certificates, Supervision and assignment.10) End-to end delivery of infrastructure phases and the utility diversions.11) Participation in preparation of Plan layouts concerning the Wet Utilities (Potable Water, wastewater, irrigation and Stormwater Networks).12) Participation in preparation of profiles layouts concerning the Wet Utilities (Potable Water, wastewater, irrigation and Stormwater Networks).13) Consistently recognized as an individual that accomplish all tasks properly when dealing with strict stakeholders. 14) Able to deal with adverse situations on daily basis while maximizing HSE measurements.15) Supervised maintenance contractors and the permanent utility connections.
-
-
-
-
Civil Engineer
-
Feb 2013 - Feb 2014
1) Supervision / execution, checking and assuring that the construction is as per the final issued construction drawings.2) Preparation of BBS.3) Productivity and work progress reports.4) Interim Payment Certificates / Sub-Contract Payment Certificates.5) Coordination with Stakeholders, Client and Liaising with Utility Agency Representatives (Wet & Dry Utilities) and the Contractors. 1) Supervision / execution, checking and assuring that the construction is as per the final issued construction drawings.2) Preparation of BBS.3) Productivity and work progress reports.4) Interim Payment Certificates / Sub-Contract Payment Certificates.5) Coordination with Stakeholders, Client and Liaising with Utility Agency Representatives (Wet & Dry Utilities) and the Contractors.
-
-
Education
-
Sudan University of Science and Technology
Bachelor's Degree, Civil Engineering