Alberto Pinho Novo

Consultor técnico sênior at INPLENITUS LDA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
São Paulo, Brazil, BR
Languages
  • Português Native or bilingual proficiency
  • Ingles Full professional proficiency
  • Espanhol Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Portugal
    • Architecture and Planning
    • 1 - 100 Employee
    • Consultor técnico sênior
      • Jan 2021 - Present

  • Prefeitura Municipal de Poá
    • Poá, São Paulo, Brasil
    • Secretário de Obras
      • Jan 2018 - Dec 2020

      Responsável pela análise e gestão técnicas das obras executadas no município, com suporte às demandas do executivo municipal, assim como demais Secretários e Vereadores. Gestão da equipe de projetos e orçamentos das obras públicas, Acompanhamento à equipe de fiscalização de obras, Participação ativa no planejamento dos investimentos Plurianuais. Responsável pela análise e gestão técnicas das obras executadas no município, com suporte às demandas do executivo municipal, assim como demais Secretários e Vereadores. Gestão da equipe de projetos e orçamentos das obras públicas, Acompanhamento à equipe de fiscalização de obras, Participação ativa no planejamento dos investimentos Plurianuais.

    • Senior Construction Manager
      • Mar 2013 - Dec 2017

      Driving down cost, increase revenue and hence increase the profit of the project, even with frequent scope change requests and incomplete executive project Assists in the development of scope of work, effort hour estimates, staffing plan and scheduling and prepare EPCM and capital estimates to US$80 mi investment , in the construction of 2 buildings with 16,000 m2 each and a flood retention reservoir with 240,000 m3, with total lead time of 3 years. Verify that the work is progressing in accordance with the Contract, and report on progress of work against construction milestones to the MWE Board Directors and Clients, and take appropriate action when progress is not accomplished, Manage construction interfaces with other projects and parties and implement processes, systems, and tools providing technical support during construction Respond to and coordinate rapid and effective responses to construction problems Qualify suppliers, issue requests for proposals, perform proposal evaluations and maintain subcontract files in accordance with established procedures. Monitor Contractor compliance with Planning, and Building requirements in tandem with Planning, Building and Safety Practices Controls teams. Anticipating issues, risk identification, and determining their impact on the project. Show less

    • Brazil
    • Civil Engineering
    • 100 - 200 Employee
    • Senior PQC Electrical Engineer
      • Jun 2012 - Feb 2013

      Main tasks: Cost reduction with the use of equipment and materials in accordance to local power requirements and Brazilian standards ensuring compliance of design work with all relevant engineering standards and internal procedures. Analyze and define changes to be made to the electrical projects (high, medium and low voltage) Ensure that projects were implemented within the deadlines and costs. Draw up and enforce detailed schedule of each project; Manage the interfaces and the differences between the various disciplines so that the problems were resolved with speed and harmony of the project were maintained; Maintain regular contacts with the designer (TYPSA-Spain) and the client (GRU Airport) for the understanding and the quality of the work; Ensure that projects were implemented in accordance with the Brazilian standards. Show less

    • Brazil
    • Business Consulting and Services
    • 1 - 100 Employee
    • Electrical Engineer Consultant
      • Jan 2011 - May 2012

      Main tasks: To ensure that the specifications of FIFA (Football Stadium Technical Requirements and Recommendation) were fully met to the development of electrical and IT executives projects in the 12 stadiums of FIFA World Cup Brazil and provides technical support during construction. Main tasks: To ensure that the specifications of FIFA (Football Stadium Technical Requirements and Recommendation) were fully met to the development of electrical and IT executives projects in the 12 stadiums of FIFA World Cup Brazil and provides technical support during construction.

    • Brazil
    • Civil Engineering
    • 100 - 200 Employee
    • Site Manager - Mercedes Benz
      • Jul 2009 - Dec 2010

      Main Tasks: Identify and increase the amount of services rendered and the annual sales for this customer.

    • Engenheiro Eletricista Senior
      • Aug 2008 - Jun 2009

      Main Tasks: Identify and implement corrections in the use of Brazilian Low Voltage Cables Standards.

  • TIMENOW ENGENHARIA
    • Taquari e Região, Brasil
    • SITE MANAGER
      • Jan 2008 - Aug 2008

      Main Tasks: In charge of developing a plan to retrieve six-month delay in the construction schedule, of a new MDP panel manufacturing unit with capacity of 700,000 m3 / year in an investment of approximately US$ 170 million Prepare EPCM and capital estimates and project schedules to US$200 mi investiment, in the construction of a modern particleboard line at Satipel's existing site in Taquari (RS), with a projected production capacity of 700,000 m³/year, due to start-up mid-2009. Verify the work is progressing in accordance with the Contract, and report on progress of work against construction milestones to the Satipel Board Directors, and take appropriate action when progress is not accomplished, Assist in identifying and abatement of construction related risks Manage construction interfaces with other projects and parties and implement processes, systems, and tools to support construction Respond to and coordinate rapid and effective responses to construction problems Support the Procurement of the supervisor and engineering support during construction Monitor Contractor compliance with Planning, and in tandem with Planning and Building Controls teams Monitor the Contractor’s production of As-built information Show less

    • Engenheiro Eletricista Senior
      • Mar 2006 - Jul 2008

      Main Tasks: Monitoring, controlling and solving conflicts due to different cultures while maintaining the progress of the work Prepare EPCM and capital estimates and project schedules to US$500 mi investment, determine project scope, supervise engineering detailed design companies, ensure compliance of design work with all relevant national and state engineering standards, and with corporate and client-specific internal standards power substation (69kV, 13.8kV,4.16kV, 0.44kV), transformers, motors, CCM´s, also., provide construction and commissioning technical support. Show less

  • PRIMA ENGENHARIA
    • São Paulo e Região, Brasil
    • Sócio proprietário
      • Mar 1994 - Apr 2006

      Coordination with the engineering department of keeping projects on track, monitoring, providing technical guidance on client’s requirement, preparing bids and coordinating manpower requirements to ensure delivery works. Ensure delivery in accordance with construction schedule and cost control requirements. Maintain regular contact with external clients developing and managing of successful client relationships. Apply engineering principles in the design of economical, safe, reliable, and efficient new and/or upgraded processes or systems for plant improvement. Show less

    • Engenheiro Eletricista Senior
      • Apr 1989 - Aug 1993

      Ensure compliance of design work with all relevant national and state engineering standards, and with corporate and client-specific internal standards power substations (13.8kV,4.16kV, 0.44kV), transformers, motors, CCM´s, aso., provide required interface between design and construction in accordance with construction schedule and cost control requirements, provide construction and commissioning technical support, assists in maintaining data to provide as-built documents upon project completion. Ensure compliance of design work with all relevant national and state engineering standards, and with corporate and client-specific internal standards power substations (13.8kV,4.16kV, 0.44kV), transformers, motors, CCM´s, aso., provide required interface between design and construction in accordance with construction schedule and cost control requirements, provide construction and commissioning technical support, assists in maintaining data to provide as-built documents upon project completion.

Education

  • Universidade de Mogi das Cruzes
    ENGENHARIA ELETRICA, Engenharia Elétrica e Eletrônica
    1976 - 1981

Community

You need to have a working account to view this content. Click here to join now