Gotam Das

Project Planning Analyst at Scatec ASA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK
Languages
  • Urdu Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Norway
    • Renewable Energy Power Generation
    • 700 & Above Employee
    • Project Planning Analyst
      • Feb 2023 - Present

      3x50MW PV Project, Sukkur 3x50MW PV Project, Sukkur

    • Pakistan
    • Renewable Energy Semiconductor Manufacturing
    • 200 - 300 Employee
    • Project Manager
      • Apr 2021 - Feb 2023

      Delivering the EPC & PPAs projects as per contracts with strict QHSE complianceProactively identify the potential risk areas to mitigate adverse impacts on achieving objectivesAchieving the Cost KPIs with engineering estimation and aligning the right suppliersTechnically & commercially evaluating the bidders with the help of supply chainTracking, reviewing, and reporting the progress of projects to meet project KPIsWorking with a government official for approvals, licenses, and duties Reviewing contracts, proposals, RFQs, and BOQs to eliminate any conflicts Effectively maintaining communications with clients, consultants, contractors, and involved stakeholders.

    • Asset Management Lead-South
      • Apr 2019 - Nov 2022

      Commissioning of PV plants including the Single Axis Tracking, fixed tilt ground, and roof-mounted PV plants.Improving the operational efficiency of installed assets by performing different diagnostics analysisSCADA designing, back-end calculation verification for performance analysis of plantsManaging the O&M handover, Conducting the QA/QC audits during the handover of the projectsManaging CAPEX/OPEX of the portfolio, inventory management

    • Pakistan
    • Oil and Gas
    • 100 - 200 Employee
    • Electrical Engineer
      • Mar 2017 - Mar 2019

      Project: 2x330 MW Thar Coal Power Plant • Owner and Project Management of 1.2 Billion Dollar Budget CPEC Project • CFB Boiler, 500kV Indoor GIS, 30MW BOP Responsibilities • Looking after the electrical Construction quality & Pre-commissioning testing includes  500kV Indoor GIS  2X420MVA Step-up T/F, 50MVA Startup T/F, 2x50MVA Auxiliary Transformer  3x37MVar, 500kV Single phase Shunt Reactor Installation (Include CBs, SA,DS,CVT)  20kV Hydrogen and water cooled Steam Turbine Generators  Generator Excitation System  6kV MV Switchgear  6kV/0.4kV LV Transformer, LV Switchgear & Protection Panels  800kVA UPS & 220V DC System Installation, testing & energization  CVTs, CTs & SA  20kV Hydrogen and water cooled Steam Turbine Generators  Generator Excitation System  20kV & 6kV NSPB & IPB  Motors • Scheduling and attending regular progress & quality meetings with the Chinese EPC contractor and Sub-contractors • Preparing the Construction Progress Reports • Reviewing the Contractor method statement before the work commencement • Reviewing the Design Change Memos • Preparing the Electrical safety Audit Reports

    • Pakistan
    • Construction
    • 100 - 200 Employee
    • Junior Electrical Engineer
      • Apr 2016 - Mar 2017

      Responsibilities • Planning, coordination and control of the project. • Schedule and attend regular meetings with the contractor, consultant and client • Quality Assurance/Quality control (QA/QC) • Reviewing the material technical submittals as per specifications and BOQ. • Verifying the invoices • Valuation of Variations • Comparing the BOQ, Specifications and drawings to eliminate the areas of conflict Responsibilities • Planning, coordination and control of the project. • Schedule and attend regular meetings with the contractor, consultant and client • Quality Assurance/Quality control (QA/QC) • Reviewing the material technical submittals as per specifications and BOQ. • Verifying the invoices • Valuation of Variations • Comparing the BOQ, Specifications and drawings to eliminate the areas of conflict

    • Pakistan
    • Construction
    • 100 - 200 Employee
    • Electrical Site Engineer
      • Jan 2015 - Mar 2016

      Client: Procter & Gamble (P&G), Pakistan Project: Shahen Hair Care, Bin Qasim Port Karachi. • Construction and Maintenance of the Plant. • First LEED (Leadership in Energy & Environment Design) Certified Project in Pakistan • 11KV/400V Indoor Substation Responsibilities  To control and ensure the electrical work is carried out to the required contract specification and approved shop drawings.  Notifying Project Engineer/QC Engineer and issuing the RFI (request for inspection and approval) in timely manner.  Accompanying the representative (CM/PM) for ongoing inspection and obtain the approval to proceed with next activity.  Controlling the coordination between all involved working member to ensure Safety, Quality and schedule requirements are met.  Underground Cable Laying for Medium Voltage and Fibre Optics.  Termination and Cable Laying of Power Transformer 2MVA, RTU and LV Panels  Boards at the Substation and the Plant.  Execution works of Substation, LT Electrical Distribution, Cable Tray, UPS System, Light fixtures, point wiring and LV System (Fire Alarm, ACS, PA System & Data/Telephone)  Electrical Grounding of the whole Plant for the Lightning and Equipment Protection. Attended the Health And Safety Training by P&G Pakistan.

Education

  • Mehran University of Engineering and Technology Jamshoro
    Bachelor’s Degree, Electrical Power Engineering
    2011 - 2014
  • Institute of Business Administration
    Certificate in Business Management
    2017 - 2017

Community

You need to have a working account to view this content. Click here to join now