Naveed Ramzan
Radio Frequency Team Lead at SWI - Innovation Delivered- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Urdu -
-
English -
-
Punjabi -
Topline Score
Bio
Ali Tanveer
Naveed is a very good RF Engineering Team Lead. More power to you!
Muhammad Zahid
I am lucky to be blessed by mentor like Naveed Ramzan, The thing which makes him a highly recommended Manager/Team lead is his energy and desire to deliver the abundant and vast knowledge resources of Telecommunications he possess with his team. I found him Maestro of his work, Impeccable Problem Solving skills, Dedicated to Core with his work , Ready to help and guide 24/7, More Power to you.
Ali Tanveer
Naveed is a very good RF Engineering Team Lead. More power to you!
Muhammad Zahid
I am lucky to be blessed by mentor like Naveed Ramzan, The thing which makes him a highly recommended Manager/Team lead is his energy and desire to deliver the abundant and vast knowledge resources of Telecommunications he possess with his team. I found him Maestro of his work, Impeccable Problem Solving skills, Dedicated to Core with his work , Ready to help and guide 24/7, More Power to you.
Ali Tanveer
Naveed is a very good RF Engineering Team Lead. More power to you!
Muhammad Zahid
I am lucky to be blessed by mentor like Naveed Ramzan, The thing which makes him a highly recommended Manager/Team lead is his energy and desire to deliver the abundant and vast knowledge resources of Telecommunications he possess with his team. I found him Maestro of his work, Impeccable Problem Solving skills, Dedicated to Core with his work , Ready to help and guide 24/7, More Power to you.
Ali Tanveer
Naveed is a very good RF Engineering Team Lead. More power to you!
Muhammad Zahid
I am lucky to be blessed by mentor like Naveed Ramzan, The thing which makes him a highly recommended Manager/Team lead is his energy and desire to deliver the abundant and vast knowledge resources of Telecommunications he possess with his team. I found him Maestro of his work, Impeccable Problem Solving skills, Dedicated to Core with his work , Ready to help and guide 24/7, More Power to you.
Credentials
-
Data Science Orientation
CourseraDec, 2018- Nov, 2024 -
Registered Engineer
Pakistan Engineering Council (PEC)May, 2016- Nov, 2024 -
3G Cellular Systems: Technical Overview, Planning and Optimization
Higher Education CommissionJan, 2014- Nov, 2024 -
Voyage of Telecommunication Industry - A look on 2.5G/3G/4G
Military College of Signals - NUSTJan, 2014- Nov, 2024 -
A short course on Android Development
Military College of Signals - NUSTJan, 2013- Nov, 2024 -
PHP development
Military College of Signals - NUSTJan, 2013- Nov, 2024
Experience
-
SWI - Innovation Delivered
-
United States
-
Telecommunications
-
100 - 200 Employee
-
Radio Frequency Team Lead
-
Aug 2022 - Present
• NR-SA RF shaping and RRC/L3Analysis, RACH, Paging Analysis. VoLTE/VoNR SIP-IMS Analysis. L3 messages analysis and can perform analysis and recommend parameter changes for network.• Analyze Drive test logs including L3 messages for customer complaints or others, Defining the reporting capability for Service and Resource KPIs to monitor, manage and proactively improve the Customer Experience - performance reports and dashboards, as per requirement.• Working on Dish Wireless NR-SA Rollout Project for E911 Testing, SSV, Cluster testing & Post processing using Airview X2 & XCAL Tool.• E911 Testing procedure, E911 verification from PSAP authority, Intrados Logs data, Field data, Location and Altitude verification using SMS & authenticated Email and report verification and sending to Kafka.• SSV Testing using XCAL tool for SMS/MMS/VoNR/ViNR/Ping/Iperf DL_UL testing, Post processing of logs in XCAP tool. Drop calls analysis, HO failure analysis for missing neighbor cells. • Cluster testing and logs analysis using Airview X2 Opto BI tool, VoNR accessibility and Retainability analysis. Low DL/UL throughput analysis and recommendation.• Site alarm and health check using NetAct tool, getting dump of sites and purposing Tilt and HO threshold. RF shaping for sites default integration settings changing related to tilt, azimuth & power settings. • BI tool Dashboard designing with developer team for KPI building and Reports templates.
-
-
RF Engineer II
-
Jan 2022 - Aug 2022
Dish Wireless Open-RAN NR-SA Rollout Project• Working on Dish Wireless NR-SA Rollout Project for E911 Testing, SSV, Cluster testing & Post processing using Airview X2 & XCAL Tool.• E911 Testing procedure, E911 verification from PSAP authority, Intrados Logs data, Field data, Location and Altitude verification using SMS & authenticated Email and report verification and sending to Kafka.• SSV Testing using XCAL tool for SMS/MMS/VoNR/ViNR/Ping/Iperf DL_UL testing, Post processing of logs in XCAP tool. Drop calls analysis, HO failure analysis for missing neighbor cells. • Cluster testing and logs analysis using Airview X2 Opto BI tool, VoNR accessibility and Retainability analysis. Low DL/UL throughput analysis and recommendation.• Site alarm and health check using NetAct tool, getting dump of sites and purposing Tilt and HO threshold. RF shaping for sites default integration settings changing related to tilt, azimuth & power settings.
-
-
RF Engineer II
-
Oct 2021 - Dec 2021
• Worked on AT&T NSA Cluster Testing, Pre and Post Analysis and Optimization Project.• Cluster optimization, and post processing of drive test log files to identify possible swap feeders, wrong PCIs, missing neighbors, overshooting cells. Layer3 messages and events analysis by using Actix. Antenna hardware modification (Tilt, Azimuth) for overshooting and interference.• Mobility analysis for HO prep, HO execution failures and rectification to improve the KPIs, identifying missing PCI neighbor cells and rectify with help of Implementation Team. RF shaping for Over-shooter based on Drive test and Scanner Data.• ToNR Improvement, VoLTE accessibility and Retainability analysis. Low DL/UL throughput analysis and recommendation.• Site alarm and health check using NetAct tool, getting dump of sites and purposing Tilt and HO threshold.
-
-
RF Engineer I
-
Jul 2020 - Sep 2021
RF Engineer Nokia/Cluster Testing & Post Processing• Completed VoLTE Call Testing C-Spire Cluster Project in Mississippi State on TEMS. Troubleshooting of VoLTE issues and Post processing on Actix and MapInfo.• MUMIMO/SUMIMO Testing Project testing and processing using XCALL with Nokia & USCC R&D Team.• Dish NR-SA Rollout Project testing and post processing using Actix and AirViewx with Nokia R&D Team.• Prepared EME reports as per FCC criteria for on building RF safety measurement using RoofView simulation software.• Atoll LTE site prediction and planning learning for different bands. Part of 5G Airview app development.
-
-
RF Engineer I
-
Oct 2019 - Jun 2020
Successfully completed T-Mobile 5G Launch Project.• 5G NR testing and troubleshooting with DT on TEMS 21.2.3, connecting scanner and OP7/Note10 mobile phone for NOKIA 5G NSA Project.• Logged file Analysis on Mapinfo for N600/L600/L1900/L2100 & AWS3 Band Measuring Different KPI like RSRP, RSRQ, SNR, SCG Addition, neighbor missing & Throughput for degraded site and give suggestion to improve the network Quality.• Supporting for improving KPIs like Accessibility, Retainability, Mobility (RRC Setup success rate, IRAT Handover success rate, DL & UL Throughput measurement & Drop calls). % Time on NR/LTE.
-
-
RF Engineer I
-
Apr 2017 - Sep 2019
I have joined Sublime Wireless Innovations Lahore from April 2017 as RF engineer on Nokia USA TMO Remote Support Project.Responsibilities in SWI:• Performed RF Data Analysis, Post processing & reporting of LTE/WCDMA/GSM network in Houston, Kansas, Oklahoma, Birmingham, Memphis & Puerto Rico Markets. Troubleshooting networking and hardware issues, Drive Routes, Pre & Post Testing and Reporting. Daily activities involve analyzing Nemo/TEMS Drive test data to achieve target KPIs on DL/UL throughput & VoLTE calls.• Logged file Analysis on Mapinfo for L600/L700/L1900/L2100/UMTS & GSM Measuring Different KPI like RSRP, RSCP, SNR, Ec/Io, RSRQ, RSSI & Throughput for degraded site and give suggestion to improve the network Quality.• MIMO testing for newly LTE integrated sites, CA, DC, LAA testing and processing on Actix and Nemo.• Responsible for EFDS tracker of drive test and tester and keeping record of bonus sheets of DTE.• Responsible for Telecom Site Survey project for T-Mobile Construction site acceptance testing and Reporting.
-
-
-
LCC
-
Algeria
-
Telecommunications
-
100 - 200 Employee
-
RF Engineer Level III
-
Oct 2015 - Apr 2017
I have joined LCC Lahore from October 2015 as RF Engineer working on Mobilink Benchmarking Project and then Ericsson Mobilink Radio Network Optimization Project in RF planning and optimization department. Responsibilities in LCC: Performed city level drive testing using Nemo Invex II, Nemo Outdoor & TEMS Investigation. Analysis of logfiles using Nemo Analyzer and Report generation. Drive testing for coverage, Audio Quality MOS, Call setup and success rates, Handovers, Drop call and FTP throughput rates for 2G/3G/4G
-
-
-
SAYBI Ltd, UK
-
Telecommunications
-
1 - 100 Employee
-
DT and Analysis Engineer
-
Dec 2014 - Sep 2015
I am attached with SayBi from December 2014 as Drive Test and Analysis Engineer in Mobilink Drive test and Reporting Project in QoS department.Responsibilities in Mobilink: Performed Drive testing to analyze and Benchmark Network Performance. Proficient with drive-testing tools such as NemoInvex-I, Nemo Outdoor & TEMS Investigation. Planned drive test routes, carried out testing for Coverage, Audio Quality MOS (using PSEQ & POLQA), Call Setup and Success rates, Handovers and FTP throughput rates for GSM/GPRS/EDGE/WCDMA/HSPA/LTE services. Post processing and analysis of Log files using Nemo Analyzer, TEMS& MapInfo. Analysis of Drop calls, Call setup failures, Inter/Intra Frequency Handover failures using Layer 3 Signaling Messages in Nemo Analyzer. Prepared Executive City level 4G/3G/2G Benchmarking reports for comparison of Mobilink with three other networks for the different Cities. Data extraction from IManager2000 using quires and to record data for BSC level for daily network monitoring. Testing using different Apps for coverage and Quality like MCC, TEMS Mobile Insight, Qmon and Coverage View.
-
-
-
IEEE
-
United States
-
Non-profit Organizations
-
700 & Above Employee
-
Student Branch Member
-
Jun 2013 - Sep 2014
Organizing Technical Workshops and seminars for fellow graduates. Organizing Technical Workshops and seminars for fellow graduates.
-
-
-
Rohde & Schwarz
-
Germany
-
Telecommunications
-
700 & Above Employee
-
Interne
-
Jul 2013 - Aug 2013
Drive test equipment utilization Oscilloscopes testing Tender process & evaluation Customer services representative Planning and strategizing Services Support Drive test equipment utilization Oscilloscopes testing Tender process & evaluation Customer services representative Planning and strategizing Services Support
-
-
-
PTCL.Official
-
Pakistan
-
Telecommunications
-
700 & Above Employee
-
Interne
-
Jul 2012 - Aug 2012
Network Monitoring Power outages problems Switching problems reporting Transmission problems reporting Problem Resolution Network maintenance activities Network Monitoring Power outages problems Switching problems reporting Transmission problems reporting Problem Resolution Network maintenance activities
-
-
Education
-
National University of Science and Technology
Bachelor of Engineering - BE, Electrical Telecommunication Engineering -
Military College of Signals
Electrical Telecom Engineering, Telecommunications Engineering -
Faran Model College
F.S.C, Pre-Engineering -
Govt High School College Road Jhang
Matriculation, Science