Muhammad Mashood Khawaja

at Pak Arab Fertilizers Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Chemical Manufacturing
    • 100 - 200 Employee
      • May 2022 - Present

      • May 2020 - May 2022

      • Nov 2018 - May 2020

      PROJECT ENGINEER Pakarab Gas Processing Factility (PGPF) – Electrical Lead • Lead the installation and commissioning of Diesel Generator. • Designing and layout planning for power and control cables along with lighting circuit distribution for hazardous area classified areas. • Designing the solar system arrangement for meeting the power supply requirement at remote location • Procurement and inspection of Gas Generators as per site location requirement. • Designing of interim arrangement for DC power supply arrangement for the metering skid. • Studied the Immersed Current Cathodic Protection, IP15 standard for Area Classification. Replacement of Motor Control Center – Project Lead • Planned the replacement of old switchgear of Chemical House (1976) • Designing of required equipment and motor starter and provided to the vendor • Carried out FAT for the manufactured panel. • Planning of execution of the panel replacement of chemical house. • Installation and Commissioning of the procured panel (in progress) RELIABILITY ENGINEER To ensure the safe operation of electrical equipment of Utilities East, CAN/CN, NP & PH&S. Some of major responsibilities include; • Planning and Scheduling of PM and CM activities. • Ensure minimum downtime by following emergency response protocol. • Develop work instructions and work procedures for each critical activity of Electrical while ensuring its implementation in true spirit. • Chalk out Job Safety Analysis (JSA), Sub-EHSE documents for critical and major activities. • Prepare Power Consumption Reports, Safety Reports, Incident investigations etc. • Work on the closure of recommendations raised in EHSE, Reliability Incident (RIR) and Incident Reports (IRR). • Ensure technical and HSE/IPP training of staff members of my team. • Provide engineering solutions for existing problems of switchgears, MCCs, motors, generators, transformers etc. Show less

      • Nov 2017 - Oct 2018

      • Studied the Motor Starters like Direct online, Star Delta, Forward Reverse, Soft starter and VFDs starters. • Developed an understanding of Low and Medium Voltage Single Line Diagrams. • Carried out Power Changeover Activities for plant operation. • Carried out the planning and scheduling of PM and CM activities. • Studied Process Safety Management Modules, API Pilot Series, Stop Series, NFPA 70E, NFPA 2001, IFA standard, ISO 9001, ISO 14001 and OHSAS 18001. PROJECTS Relocation of Liquified Carbon Dioxide Plant - Electrical Lead • Decommissioning followed by commissioning of 20 motors varying 4-400kW. • Decommissioning and commissioning of MCC comprising of 15 DOL starters and 5 soft starters as per available documentation. • Documentation of decommissioning and commissioning activity Installation and Commissioning of Packaged Type Boiler - Electrical Lead • Lead the installation and commissioning of 3MTPH packaged type boiler • Prepared the power supply arrangement plan along with preparation of main control circuit diagram.Installation and Commissioning of Gas Generator and Diesel Generators - Project Lead• Lead the installation and commissioning of two 1.4MW and one 1.1MW gas generator• Lead the installation, commissioning and decommissioning of 725kVA diesel generatorINERGEN IG-541 System – Project Lead• Design and forecasted for INERGEN IG-541 installation at Pakarab Fertilizers Limited• Proposed the cost-effective solution for the INERGEN IG-541 by modification in existing system. Show less

    • United States
    • Non-profit Organizations
    • 700 & Above Employee
      • Feb 2016 - Feb 2017

      To lead the program team to organize the events.

      • Sep 2015 - Feb 2016

      The job requires to cope with the team and organize the events on hand and to facilitate students in a developing their skills.

    • Pakistan
    • Utilities
    • 100 - 200 Employee
    • Summer Intern
      • Aug 2016 - Sep 2016

      An overview of the working with departments of Grid System, operation and working of various departments like metering and testing. An overview of the working with departments of Grid System, operation and working of various departments like metering and testing.

      • Sep 2015 - Sep 2016

      The major task of this post is to lead the marketing team in such a manner that they can encourage other people to come to the event and workshops held by our society. The other task is to gather the sponsors in such a manner that they find it beneficial in supporting our society

      • Apr 2015 - Sep 2015

      1. Coordinate with the HR department.2. Coordinate with the Marketing Department for the duties.

    • Summer Intern
      • Jul 2016 - Aug 2016

      To present a cost effective solution to handle the bottle loss during different stages of the process along with a thorough understanding of function of the Blowing Unit (SBO-8), Air Conveyer and Labeling Machine. To present a cost effective solution to handle the bottle loss during different stages of the process along with a thorough understanding of function of the Blowing Unit (SBO-8), Air Conveyer and Labeling Machine.

  • Student Government Association Society (SEECS,NUST)
    • National University of Sciences and Technology
    • Director Alumni Relations
      • Sep 2015 - Aug 2016

      The major task of this is post is to manage the record of the outgoing student of the university and the outgoing and the alumni of university in every matter. The other major task which this post require is to spread awareness of how to deal with the outside world and how the people has made their way to their world for this various talks of the alumni are organized. The major task of this is post is to manage the record of the outgoing student of the university and the outgoing and the alumni of university in every matter. The other major task which this post require is to spread awareness of how to deal with the outside world and how the people has made their way to their world for this various talks of the alumni are organized.

    • Oil and Gas
    • 1 - 100 Employee
    • Summer Intern
      • Jun 2016 - Jul 2016

      A comprehensive experience of operations involved in combined cycle power generation including an understanding of water purification, electrical and instrumentation department, training on presentation skills. A comprehensive experience of operations involved in combined cycle power generation including an understanding of water purification, electrical and instrumentation department, training on presentation skills.

    • Pakistan
    • Oil and Gas
    • 100 - 200 Employee
    • Summer Intern
      • Aug 2015 - Aug 2015

      In the internship I studied the basic working of the Power Plant. The major departments which I covered were Balancing of Plant, Operations, Electrical and Instrumentation and the Power Generation through generator and the Solar Power System. The plant has the capacity of generating 727MW through thermal process while 1.254MW was also generated by Solar Power System. In the internship I studied the basic working of the Power Plant. The major departments which I covered were Balancing of Plant, Operations, Electrical and Instrumentation and the Power Generation through generator and the Solar Power System. The plant has the capacity of generating 727MW through thermal process while 1.254MW was also generated by Solar Power System.

    • Summer Intern
      • Jun 2015 - Jul 2015

      I worked as an intern at the power plant of Mahmood Textile mills. The departments which I covered were as follows: Power Generation, Power Transmission and Control Systems. The power generation was based on Gas Fired system. In which the fuel was the gas (Sui Gas) and the system was based on generating the power up to 20MW. In Power Transmission studied the basic transmission setup of the low power and high power transmission of the system being employed by the firm and studied how it work. In the Control System worked on the circuits of the machine and studies and made a circuits used for the basic machine working like Star Delta connection, Direct online connection and forward and reverse direction machine operation circuit. Show less

Education

  • National University of Sciences and Technology (NUST)
    Bachelor's Degree, Electrical and Electronics Engineering
    2013 - 2017
  • Punjab College for Information Technology, Multan, Pakistan
    High School, Pre-Engineering
    2011 - 2013
  • Multan Public School and College, Multan, Pakistan
    Matriculation, Science
    2009 - 2011

Community

You need to have a working account to view this content. Click here to join now