Bagas Aryo Dananjoyo

Laboratory Research Assistant at Power System Simulation Laboratory
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Magelang Regency, Central Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • LKMM PRA-TD
    BEM FTEIC ITS
    Sep, 2021
    - Nov, 2024
  • LKMW-TD
    Badan Eksekutif Mahasiswa Institut Teknologi Sepuluh Nopember (BEM ITS)
    Dec, 2020
    - Nov, 2024
  • Power Factory DigSILENT
    Power System Simulation Laboratory
    Oct, 2022
    - Nov, 2024
  • ETAP Power Station
    Power System Simulation Laboratory
    Aug, 2022
    - Nov, 2024
  • Certified MATLAB Professional
    Power System Simulation Laboratory
    Aug, 2022
    - Nov, 2024

Experience

    • Indonesia
    • Research Services
    • 1 - 100 Employee
    • Laboratory Research Assistant
      • Aug 2022 - Present

      PSSL Laboratory is one of the laboratories of the Sepuluh Nopember Institute of Technology which is under the auspices of the ITS Electrical Engineering Department. The scientific field of the Power System Simulation Laboratory includes the analysis and design of electric and integrated energy systems including modeling, simulation, and optimization of electric power systems (reliability); and planning, protection, automation, control, and power quality. In This Laboratory, i manage to do: • Helped researchers and lecturers in carrying out annual research and community service application of technology. • Assisted researchers and lecturers in managing and holding student practicum in a laboratory. • Teaching and Academic tutor Power System Analysis Course. • Trained client work in ETAP Software for use in electrical simulation system modeling. • Trained client work in Power Factory DigSILENT software for use in electrical simulation system modeling. • Managed annual agendas in a national webinar about "Power System in Indonesia for the Future." Show less

    • Indonesia
    • Electric Power Generation
    • 700 & Above Employee
    • Electrical Engineering Maintenance
      • Jan 2023 - Feb 2023

      PLN Indonesia Power is a Steam power plant with a total installed capacity of 3,440 MW. The largest PLTU in Indonesia produces around 50% of PT Indonesia Power's total production and contributes 17% of the electricity needs of Java-Madura-Bali. ● Carried out maintenance activities during overhaul at the Power Plant Steam Power in units 5 – 7. ● Strengthened analysis of maintenance results with the data obtained during the inspection. ● Drafted conclusions and provided analysis results that are used for report purposes. Show less

    • Indonesia
    • Research Services
    • 1 - 100 Employee
    • Electrical, Programming, and Safety System Engineer
      • Nov 2021 - Feb 2023

      Low Voltage DivisionHas the responsibility for designing the safety system on formula electric cars in the form of ECU and sensors. In this project, I have the responsibility to create an Accelerator Pedal Position Sensor or APPS to monitor, check, and precise the pedal of the vehicle.• Maintain power system in an electric vehicle, incl: Battery (HV), BMS, and Motor BLDC.• Maintain safety system in Formula Electric vehicles, incl: Sensor and Control System.• Programmer and Electronics Engineer at the team. Created Electrical Circuit for Formula Electric Vehicle.• Succeeded in inventing and creating a safety system for the gas pedal and brake pedal in the third generation of the Anargya Formula electric car. Show less

    • Tractive System and Controller
      • Sep 2021 - Nov 2021

      High Voltage Division and Make Electric Go-kart

    • Business Consulting and Services
    • 1 - 100 Employee
    • Electrical Engineer Consultant
      • Sep 2022 - Dec 2022

      PT ITS Tekno Sains is a consulting and engineering company that has experience in providing totally innovative solutions and services in Technology and Management. The company cooperates with PT KAI to solve traction power system problems. ● Conceptualized the analysis related to previous years’ SOP documents of PT KAI and adjusted the documents to standards Predefined international, such as IEEE and IEC. ● Projected site surveys on facilities and infrastructure as well as analyzed the conditions in the field to make a report. ● Devised and launched Standard Operation Procedure (SOP) documents for maintenance of the electricity network on KRL (PT KAI Indonesia Persero). Show less

Education

  • Institut Teknologi Sepuluh Nopember (ITS)
    Bachelor of Engineering - BE, Electrical Power System Engineering
    2020 - 2024
  • SMAN 3 Kota Magelang
    Senior High School, Mathematics and Science
    2017 - 2020

Community

You need to have a working account to view this content. Click here to join now