Gajendran Ganesan

Construction Professional at Hardesty & Hanover, LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US
Languages
  • Tamil -
  • Kannada -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Project Management Professional
    11352

Experience

    • United States
    • Civil Engineering
    • 300 - 400 Employee
    • Construction Professional
      • Jun 2021 - Present

  • BACE Foundations
    • Vellore Area, India
    • Principal Consultant
      • Jul 2016 - May 2021

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Construction Professional
      • Apr 2012 - Mar 2016

      Project Highlight: New Ramp, Painting and Miscellaneous Repairs at the Approach and Suspended Spans at the Verrazano-Narrows Bridge, MTA-TBTA. New Bus/HOV Ramp to connect the Gowanus Expressway in Brooklyn to the Upper Level of the Verrazano‐ Narrows Bridge. This project involves construction of a new ramp which will weave its way through the spaghetti pile formed by the existing and complex ramp network forming the Brooklyn Approaches to the bridge. Major work includes removal of existing structures; modification to others, including reducing depths to provide increased vertical clearance; construction of new piers founded on micro‐piles within the congested site under the bridge; erosion, sediment, noise and dust control; and appurtenant work which will include drainage, sign structures, fire protection and lighting installation. Project Cost $85M Shore Parkway Bridge over Fresh Creek Basin, Brooklyn, NYCDOT. Roadway reconstruction and bridge replacement project. Major work includes multi-staged construction to construct new pile-supported concrete abutments, concrete piers, composite steel stringer, concrete deck, elastomeric bearings and reconstruction of 900 feet of the Belt Parkway requiring soil surcharging to control settlements of proposed new fills. Project Cost $120M

    • United States
    • Construction
    • 500 - 600 Employee
    • Construction Engineer
      • Aug 2004 - Apr 2012

      Projects Involved: Reconstruction of Kingston Avenue between Empire Boulevard and Eastern Parkway, NYC DDC. The activities include roadway reconstruction, Triborough Bridge (RFK Bridge) Deck Replacement on the Wards and Randall’s Island Viaduct: Valued at $272 million, is the TBTA’s largest bridge project to date Construction of pedestrian and bicycle pathway phase-1, Town of Hempstead, Nassau County Countywide Resurfacing in Nassau County. Tappan Zee Bridge, Special Interim Inspection. Terminal Area - Emergency Access Road at Westchester County Airport/ Airport Security - Vehicle Access Checkpoint, Westchester, NY. North Ocean Ave (CR 83) Bridge over I-495:

    • Structural Engineer
      • Mar 2002 - Aug 2004

      Projects Involved: 4 Bridges on Raritan Valley Line: Route 9A: Segment 1, BPU Roof Extension Broadway Bridge over Harlem River Tappan Zee Bridge/I287 Corridor Environmental Impact Study Projects Involved: 4 Bridges on Raritan Valley Line: Route 9A: Segment 1, BPU Roof Extension Broadway Bridge over Harlem River Tappan Zee Bridge/I287 Corridor Environmental Impact Study

    • Singapore
    • Truck Transportation
    • 700 & Above Employee
    • Technical Service Officer
      • Oct 1997 - Oct 2001

      Projects Involved: Maxwell Road Underpass, Singapore Upgrading of PIE / Adam Road Interchange, Singapore Extension of Choa Chu Kang North 7 to Sungei Kadut, Singapore. Proposed Road Link from PIE to Jurong West Avenue 1/Jurong East Avenue 1, Singapore Extension and Widening of Upper Serangoon Road from Hougang Ave 5 to Sengkang New Town and Arterial Road from Punggol Road, Singapore Proposed Widening of Upper Bukit Timah Road (Phase 1), Singapore Projects Involved: Maxwell Road Underpass, Singapore Upgrading of PIE / Adam Road Interchange, Singapore Extension of Choa Chu Kang North 7 to Sungei Kadut, Singapore. Proposed Road Link from PIE to Jurong West Avenue 1/Jurong East Avenue 1, Singapore Extension and Widening of Upper Serangoon Road from Hougang Ave 5 to Sengkang New Town and Arterial Road from Punggol Road, Singapore Proposed Widening of Upper Bukit Timah Road (Phase 1), Singapore

    • Project Engineer
      • Sep 1992 - Oct 1997

      Projects: Road Over Bridge at Tarikere, Karnataka, Southern Railways, India Birur-Shimoga Section, Karnataka, Southern Railways, India Birur-Chickjajur Section, Karnataka State, Southern Railways, India Projects: Road Over Bridge at Tarikere, Karnataka, Southern Railways, India Birur-Shimoga Section, Karnataka, Southern Railways, India Birur-Chickjajur Section, Karnataka State, Southern Railways, India

    • Technical Assistant
      • Jun 1991 - Sep 1992

      Projects: Survey for Villupuram Bye-Pass road, Tamil Nadu India Ulundurpet Junction Improvement, Tamil Nadu, India Projects: Survey for Villupuram Bye-Pass road, Tamil Nadu India Ulundurpet Junction Improvement, Tamil Nadu, India

Education

  • Columbia University
    MS, Construction Administration
    2008 - 2010
  • Vellore Institute of Technology
    BE, Civil Engineering
    1987 - 1991

Community

You need to have a working account to view this content. Click here to join now