Jon (Jose) Giroy

Production Supervisor at ChampionX Artificial Lift
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Augustine Heights, Queensland, Australia, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Statistics Foundations: 2
    LinkedIn
    Jun, 2022
    - Oct, 2024
  • Google Sheets Advanced Tips and Tricks
    LinkedIn
    Sep, 2021
    - Oct, 2024
  • Learning Microsoft Power Apps
    LinkedIn
    Aug, 2021
    - Oct, 2024
  • Professional Certificate of Competency in Instrumentation, Automation, and Process Control
    Engineering Institute of Technology
    Nov, 2018
    - Oct, 2024
  • Provide basic emergency life support
    Chubb Alba Control Systems Ltd, A United Technologies BIS Company
    Sep, 2018
    - Oct, 2024
  • Provide cardiopulmonary resuscitation
    Chubb Alba Control Systems Ltd, A United Technologies BIS Company
    Sep, 2018
    - Oct, 2024
  • Provide first aid
    Chubb Alba Control Systems Ltd, A United Technologies BIS Company
    Sep, 2018
    - Oct, 2024
  • Professional Chemical Engineer - Skill Level 1
    Engineers Australia
    Jul, 2015
    - Oct, 2024
  • Teacher of Swimming and Water Safety (TSW)
    AUSTSWIM
    Jul, 2015
    - Oct, 2024
  • Professional Chemical Engineer
    Philippine Institute of Chemical Engineers
    Dec, 2012
    - Oct, 2024

Experience

    • Oil and Gas
    • 200 - 300 Employee
    • Production Supervisor
      • Aug 2022 - Present

    • Business Owner
      • Jul 2021 - Present

    • Australia
    • Food and Beverage Services
    • 700 & Above Employee
    • Manufacturing Supervisor
      • Jun 2021 - Aug 2022

    • Process Technician
      • Sep 2017 - Jun 2021

      Achievements:- Created a SharePoint site for the PET line Production Team that hosts a number of applications- Created an online application that displays raw material and product specifications; replaced the old practice of printing 60 pages of production worksheets per day.- Provided technical support during the commissioning of the Reverse Osmosis Unit bypass pipeline. Created an application to assist operators in process control of the new control system.- Authored training documents for new process technicians with the aid of Microsoft Office Suite (PowerPoint, Excel)- Developed a visual tracking system of blow moulds current condition which was used to identify defects for immediate repair. The system was used as state standard template.

    • Higher Education
    • 700 & Above Employee
    • Research Assistant
      • Oct 2016 - Dec 2016

      Promoting Workplace Health and Safety in the Workplace Achievements: - Authored a laboratory manual using Microsoft Word for two laboratories at the School of Chemical Engineering with focus on health, safety and environment - Developed a comprehensive laboratory induction process for incoming research students with emphasis on Workplace Health and Safety responsibilities and equipment competency - Developed a laboratory safety culture survey and delivered face-to-face interviews with stakeholders to assess the effectiveness of the existing laboratory induction process - Supported coordination of workshops, conferences, and meetings

    • Philippines
    • Oil and Gas
    • 700 & Above Employee
    • Process Engineer
      • Dec 2012 - Jan 2015

      Project: Refinery Master Plan Phase 2 (RMP-2) Commissioning of Gas Oil Hydrotreating Unit and Kerosene Mercaptan Oxidation Unit - Managed the commissioning of the Gas Oil Hydrotreating Plant (GOHT-4) as a process engineer through interpersonal and collaboration skills and building positive internal and external stakeholder relationships. - Successfully helped solve a compressor capacity control issue while keeping the plant running on stable operation; saved the refinery USD 30 M from opportunity losses - Identified a major piping construction error months before commissioning; potentially saved the company months of delay - Worked autonomously and in the team by conducting on-site inspections, reviewing of technical documents, and maintaining construction punch lists - Created a strategic plan using Microsoft Excel to advance the commissioning schedule of GOHT-4 plant and by prioritising and placing commissioning activities in parallel with other activities without compromising process safety and quality of work. - Developed and issued an 850-page GOHT-4 and MerOx-2 operating manuals using Microsoft Word compliant with ISO 9001 format to serve as a reference for all concerned disciplines - Developed the operations training manuals and lecture notes using Microsoft PowerPoint; Conducted and facilitated in-house classes to the operations group

Education

  • University of the Philippines
    Bachelor's Degree, Chemical Engineering
    2007 - 2012

Community

You need to have a working account to view this content. Click here to join now