Vijay Chiplunkar

Manager at Gammon Infrastructure Projects Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Mumbai, Maharashtra, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Vijay was hardworking student. His problem solving skills were above par. Positive attitude and perseverance are the two qualities I distinctly observed in Vijay.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Investment Management
    • 100 - 200 Employee
    • Manager
      • Apr 2018 - Present

    • Investment Management
    • 100 - 200 Employee
    • Deputy Manager
      • 2015 - 2018

    • Asst.Manager
      • Oct 2008 - 2015

      A. Biomass Power I. Project Management for 12MW Independent Biomass power project, Identifying and coordinating appropriate team for EPC and 30 MW Bagasse Based Cogeneration Power Project• Develop, negotiate and signed the Project Development Agreement, Site identification and selection, Co-ordinate with Legal & Liasioning department for land acquisition, submit proposal/application and technical support for obtaining various clearances/approvals from MEDA, MNRE, AAI, Mining, MPCB and Environmental Clearance with Public Hearing• Study, negotiated, coordinated and signed Power Purchase Agreement with DISCOM for 13 years • Coordination with STU for grid evacuation, technical approval, budget approval, field survey and execution of 132kVA transmission line. Approval final grid connectivity from State Transmission Utility and synchronization from SLDC • Preparation of techno-commercial reports, coordinate with bankers for Lender Engineer Site visit/Bill Certification and getting financial assistance for the project• Project Management for project with Identifying and coordinating appropriate team for EPC, finalisation of different vendors, Implementation of project, keep monitoring physical and banking progress and achieved COD• Key role for Capital Incentive form MNRE, Renewable energy Certification from MEDA/SLDC/NLDC • Currently successfully keep monitoring of operation of the project since COD Assessing fuel matrix with bagasse and coal compliance with MSEDCL and Billing B. Solar Photovoltaic Power Projects • Feasibility, Concept, granting permission from key stack holder’s for setting up of 50 MW grid connected solar power project • Finalisation of EPC vendor, financial closure assistance, and getting approval from various agencies such as MSEDCL/MSETCL, Mining, MPCB for setting up said project along with final grid connectivity from State Transmission Utility. • Installation of MW scale solar rooftop power project under net metering

    • Executive Engineer- Renewable Energy (Bioenergy)
      • May 2006 - Oct 2008

      A. Bio Conversion Technology (Bioenergy) • Project engineer for implementing 45, 30 and 85 cum/day capacity biogas plants based on different de-oiled cake for cooking of food to common canteen to replace LPG. • Lead Team member for study the techno-economics feasibility, design, commissioning and erection of 1.7 MW, 100% biogas based combine heat and power generation from different fruit solid waste with Innovas, Germany for Jain Irrigation Systems Ltd., Jalgaon.B. Solar Photovoltaic Technology • Study the techno-economics feasibility, design, commissioning and erection of MW scale Solar PV based power generation for (Captive -In house Consumption) C. Waste Water Treatment (Anaerobic followed by Aerobic) • Project incharge for design and erection of two 1000 m3 anaerobic followed by aerobic effluent treatment plant based on dissolved air flotation, packed bed reactor system for fruit processing unit. • Erection, installation and commissioning of wastewater treatment plant at JISL Unit-I & II Chittoor(A.P.)• Project engineer for erection of 2000 m3 anaerobic followed by aerobic effluent treatment plant based on dissolved air flotation, packed bed reactor system for fruit processing unit.

Education

  • Maharana Pratap University of Agriculture and Technology
    Master of Engineering, Renewable Energy Engineering
    2003 - 2005
  • Engineering
    B.Tech, Agricultural Engineering (Renewable)
    1999 - 2003
  • Alore Highschool Alore
    -

Community

You need to have a working account to view this content. Click here to join now