Sandeep Kotwal

State Construction Head at RELIANCE CORPORATE IT PARK LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Ganderbal, Jammu & Kashmir, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Sharat Ranjan

Sandeep is a very hard working & sincere employee. He looks after the assigned tasks with full dedication & energy. I wish him all the best for his carrier

Dinesh Kumar

"I have worked closely with Sandeep Kotwal As a competent Civil Engineer-enviromental specialist. with great happiness,l would like to express my respect and appreciation for this bright young person,his extraodinary ability to work in group was invaluable,he is a hard-working self-starter who invariably understands exactly what a project is all about" I wish him a very great career ahead and success everywhere!!

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certificate
    FPPL

Experience

    • India
    • Chemical Manufacturing
    • 300 - 400 Employee
    • State Construction Head
      • Apr 2017 - Present

  • Dugar Hydro Power Limited
    • Kilar, Pangi, Himachal Pradesh
    • Site in Charge
      • Apr 2013 - Mar 2017

      Responsible for liaisoning with local authorities & affected Panchayats and entire field works for diversion of Forest Land under FCA & submission of DPR respectively i.e. 1.1. Survey 1.2. Geotechnical Investigation (Core Drilling, Drifting, Insitu Tests & laboratory tests) 1.3. Geophysical Survey 1.4. Geological Studies and Geological mapping 1.5. Seismotechtonic Evaluation 1.6. Construction Material Survey 1.7. Route Survey 1.8. Hydro metrological, Hydrological & Sedimentation Data Collection Show less

  • Fozal Power Private Limited
    • Katrain, Kullu, Himachal Pradesh
    • Vice President (Project Construction)
      • Apr 2012 - Mar 2013

      Responsible for liaison works and constructions of entire works i.e. 2.1. Civil Works (Diversion Weir, Desilting chambers, HRT, open to sky Surge Shaft, and surface Powerhouse); 2.2. Electromechanical works; 2.3. Hydro mechanical works; 2.4. Dealing with drawing consultant; 2.5. Verification of Invoices / Bills of involved vendors / contractors / agencies; 2.6. Quality Control at Site; 2.7. Drafting the Contract Agreements; Responsible for liaison works and constructions of entire works i.e. 2.1. Civil Works (Diversion Weir, Desilting chambers, HRT, open to sky Surge Shaft, and surface Powerhouse); 2.2. Electromechanical works; 2.3. Hydro mechanical works; 2.4. Dealing with drawing consultant; 2.5. Verification of Invoices / Bills of involved vendors / contractors / agencies; 2.6. Quality Control at Site; 2.7. Drafting the Contract Agreements;

    • Additional General Manager (Construction)
      • Dec 2010 - Mar 2012

      Responsible for field works for submission of DPR i.e. 3.1. Geological Survey & mapping; 3.2. Geo-technical Investigations (Bore holes, Water Pressure Tests, Insitu tests, collection of disturbed / undisturbed samples for c & phi values, exploratory drifts for underground cavity orientation); 3.3. Surveys (Contour, Reservoir, Topographical, River Soundings); 3.4. Exposure to CSR activities. Responsible for field works for submission of DPR i.e. 3.1. Geological Survey & mapping; 3.2. Geo-technical Investigations (Bore holes, Water Pressure Tests, Insitu tests, collection of disturbed / undisturbed samples for c & phi values, exploratory drifts for underground cavity orientation); 3.3. Surveys (Contour, Reservoir, Topographical, River Soundings); 3.4. Exposure to CSR activities.

    • India
    • Construction
    • 700 & Above Employee
    • Deputy Project Manager (Planning & Controls)
      • Jun 2009 - Oct 2010

      Head of Planning & Controlling Department i.e. 4.1. Planning, scheduling, conducting and coordinating the technical and management aspects of projects; 4.2. Accountable for the successful completion of engineering projects; 4.3. Requires extensive regular contact with the assigned consultants, sub-contractors, supervisors, planners; 4.4. Assist in the preparation of engineering project proposals; 4.5. Budget monitoring and trend tracking; 4.6. Participating in contractor meetings and resolving engineering and project management issues; 4.7. Review and approve project Vendor invoices; 4.8. Ensure effective engineering and Client communications; 4.9. Prepare Weekly/Monthly project status reports. Show less

    • India
    • Construction
    • 1 - 100 Employee
    • Assistant General Manager (Civil)
      • Dec 2007 - May 2009

      Responsible for construction of subsurface Power House; 5.1. Billing; 5.2. Quality Control; 5.3. Dealing with Hydro & Electro mechanical interface issues; 5.4. Progress Review Meetings with Contractor. Responsible for construction of subsurface Power House; 5.1. Billing; 5.2. Quality Control; 5.3. Dealing with Hydro & Electro mechanical interface issues; 5.4. Progress Review Meetings with Contractor.

    • Belgium
    • Engineering Services
    • 700 & Above Employee
    • Civil Engineer
      • Nov 2000 - Dec 2007

      Responsible for supervision of construction works i.e. 6.1. Underground Powerhouse (from excavation to completion stage); 6.2. Dealing with Hydro & Electro mechanical interface issues; 6.3. Participating in contractor meetings and resolving engineering issues; 6.4. Ensure effective engineering and Client communications; 6.5. Environmental issues; 6.6. Safety issues & meetings. Responsible for supervision of construction works i.e. 6.1. Underground Powerhouse (from excavation to completion stage); 6.2. Dealing with Hydro & Electro mechanical interface issues; 6.3. Participating in contractor meetings and resolving engineering issues; 6.4. Ensure effective engineering and Client communications; 6.5. Environmental issues; 6.6. Safety issues & meetings.

    • Consumer Goods
    • 700 & Above Employee
    • Field Engineer
      • Mar 1997 - Nov 2000

      Responsible for civil works of 7.1. Dam Blocks; 7.2. dealing with Hydro mechanical interface issues. Responsible for civil works of 7.1. Dam Blocks; 7.2. dealing with Hydro mechanical interface issues.

  • Mixed Exposure
    • Jammu Area, India
    • Consulting Engineer
      • Jul 1992 - Feb 1997

      • Lecturer for two years. • Supplier of Construction Materials • Lecturer for two years. • Supplier of Construction Materials

Education

  • B. N. College of Enginnering & Polytechnic, Pusad (Maharashtra)
    BE, Civil Engineering
    1988 - 1992

Community

You need to have a working account to view this content. Click here to join now