Sandeep Kotwal
State Construction Head at RELIANCE CORPORATE IT PARK LIMITED- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Sharat Ranjan
Sandeep is a very hard working & sincere employee. He looks after the assigned tasks with full dedication & energy. I wish him all the best for his carrier
Dinesh Kumar
"I have worked closely with Sandeep Kotwal As a competent Civil Engineer-enviromental specialist. with great happiness,l would like to express my respect and appreciation for this bright young person,his extraodinary ability to work in group was invaluable,he is a hard-working self-starter who invariably understands exactly what a project is all about" I wish him a very great career ahead and success everywhere!!
Sharat Ranjan
Sandeep is a very hard working & sincere employee. He looks after the assigned tasks with full dedication & energy. I wish him all the best for his carrier
Dinesh Kumar
"I have worked closely with Sandeep Kotwal As a competent Civil Engineer-enviromental specialist. with great happiness,l would like to express my respect and appreciation for this bright young person,his extraodinary ability to work in group was invaluable,he is a hard-working self-starter who invariably understands exactly what a project is all about" I wish him a very great career ahead and success everywhere!!
Sharat Ranjan
Sandeep is a very hard working & sincere employee. He looks after the assigned tasks with full dedication & energy. I wish him all the best for his carrier
Dinesh Kumar
"I have worked closely with Sandeep Kotwal As a competent Civil Engineer-enviromental specialist. with great happiness,l would like to express my respect and appreciation for this bright young person,his extraodinary ability to work in group was invaluable,he is a hard-working self-starter who invariably understands exactly what a project is all about" I wish him a very great career ahead and success everywhere!!
Sharat Ranjan
Sandeep is a very hard working & sincere employee. He looks after the assigned tasks with full dedication & energy. I wish him all the best for his carrier
Dinesh Kumar
"I have worked closely with Sandeep Kotwal As a competent Civil Engineer-enviromental specialist. with great happiness,l would like to express my respect and appreciation for this bright young person,his extraodinary ability to work in group was invaluable,he is a hard-working self-starter who invariably understands exactly what a project is all about" I wish him a very great career ahead and success everywhere!!
Credentials
-
Certificate
FPPL
Experience
-
RELIANCE CORPORATE IT PARK LIMITED
-
India
-
Chemical Manufacturing
-
300 - 400 Employee
-
State Construction Head
-
Apr 2017 - Present
-
-
-
Dugar Hydro Power Limited
-
Kilar, Pangi, Himachal Pradesh
-
Site in Charge
-
Apr 2013 - Mar 2017
Responsible for liaisoning with local authorities & affected Panchayats and entire field works for diversion of Forest Land under FCA & submission of DPR respectively i.e. 1.1. Survey 1.2. Geotechnical Investigation (Core Drilling, Drifting, Insitu Tests & laboratory tests) 1.3. Geophysical Survey 1.4. Geological Studies and Geological mapping 1.5. Seismotechtonic Evaluation 1.6. Construction Material Survey 1.7. Route Survey 1.8. Hydro metrological, Hydrological & Sedimentation Data Collection Show less
-
-
-
Fozal Power Private Limited
-
Katrain, Kullu, Himachal Pradesh
-
Vice President (Project Construction)
-
Apr 2012 - Mar 2013
Responsible for liaison works and constructions of entire works i.e. 2.1. Civil Works (Diversion Weir, Desilting chambers, HRT, open to sky Surge Shaft, and surface Powerhouse); 2.2. Electromechanical works; 2.3. Hydro mechanical works; 2.4. Dealing with drawing consultant; 2.5. Verification of Invoices / Bills of involved vendors / contractors / agencies; 2.6. Quality Control at Site; 2.7. Drafting the Contract Agreements; Responsible for liaison works and constructions of entire works i.e. 2.1. Civil Works (Diversion Weir, Desilting chambers, HRT, open to sky Surge Shaft, and surface Powerhouse); 2.2. Electromechanical works; 2.3. Hydro mechanical works; 2.4. Dealing with drawing consultant; 2.5. Verification of Invoices / Bills of involved vendors / contractors / agencies; 2.6. Quality Control at Site; 2.7. Drafting the Contract Agreements;
-
-
-
Himagiri Hydro Energy (P) Ltd
-
Gangtok Area, India
-
Additional General Manager (Construction)
-
Dec 2010 - Mar 2012
Responsible for field works for submission of DPR i.e. 3.1. Geological Survey & mapping; 3.2. Geo-technical Investigations (Bore holes, Water Pressure Tests, Insitu tests, collection of disturbed / undisturbed samples for c & phi values, exploratory drifts for underground cavity orientation); 3.3. Surveys (Contour, Reservoir, Topographical, River Soundings); 3.4. Exposure to CSR activities. Responsible for field works for submission of DPR i.e. 3.1. Geological Survey & mapping; 3.2. Geo-technical Investigations (Bore holes, Water Pressure Tests, Insitu tests, collection of disturbed / undisturbed samples for c & phi values, exploratory drifts for underground cavity orientation); 3.3. Surveys (Contour, Reservoir, Topographical, River Soundings); 3.4. Exposure to CSR activities.
-
-
-
Hindustan Construction Company
-
India
-
Construction
-
700 & Above Employee
-
Deputy Project Manager (Planning & Controls)
-
Jun 2009 - Oct 2010
Head of Planning & Controlling Department i.e. 4.1. Planning, scheduling, conducting and coordinating the technical and management aspects of projects; 4.2. Accountable for the successful completion of engineering projects; 4.3. Requires extensive regular contact with the assigned consultants, sub-contractors, supervisors, planners; 4.4. Assist in the preparation of engineering project proposals; 4.5. Budget monitoring and trend tracking; 4.6. Participating in contractor meetings and resolving engineering and project management issues; 4.7. Review and approve project Vendor invoices; 4.8. Ensure effective engineering and Client communications; 4.9. Prepare Weekly/Monthly project status reports. Show less
-
-
-
GATI Infrastructure Private Limited
-
India
-
Construction
-
1 - 100 Employee
-
Assistant General Manager (Civil)
-
Dec 2007 - May 2009
Responsible for construction of subsurface Power House; 5.1. Billing; 5.2. Quality Control; 5.3. Dealing with Hydro & Electro mechanical interface issues; 5.4. Progress Review Meetings with Contractor. Responsible for construction of subsurface Power House; 5.1. Billing; 5.2. Quality Control; 5.3. Dealing with Hydro & Electro mechanical interface issues; 5.4. Progress Review Meetings with Contractor.
-
-
-
TRACTEBEL
-
Belgium
-
Engineering Services
-
700 & Above Employee
-
Civil Engineer
-
Nov 2000 - Dec 2007
Responsible for supervision of construction works i.e. 6.1. Underground Powerhouse (from excavation to completion stage); 6.2. Dealing with Hydro & Electro mechanical interface issues; 6.3. Participating in contractor meetings and resolving engineering issues; 6.4. Ensure effective engineering and Client communications; 6.5. Environmental issues; 6.6. Safety issues & meetings. Responsible for supervision of construction works i.e. 6.1. Underground Powerhouse (from excavation to completion stage); 6.2. Dealing with Hydro & Electro mechanical interface issues; 6.3. Participating in contractor meetings and resolving engineering issues; 6.4. Ensure effective engineering and Client communications; 6.5. Environmental issues; 6.6. Safety issues & meetings.
-
-
-
Jaiprakash Associates Ltd.
-
Consumer Goods
-
700 & Above Employee
-
Field Engineer
-
Mar 1997 - Nov 2000
Responsible for civil works of 7.1. Dam Blocks; 7.2. dealing with Hydro mechanical interface issues. Responsible for civil works of 7.1. Dam Blocks; 7.2. dealing with Hydro mechanical interface issues.
-
-
-
Mixed Exposure
-
Jammu Area, India
-
Consulting Engineer
-
Jul 1992 - Feb 1997
• Lecturer for two years. • Supplier of Construction Materials • Lecturer for two years. • Supplier of Construction Materials
-
-
Education
-
B. N. College of Enginnering & Polytechnic, Pusad (Maharashtra)
BE, Civil Engineering