Bryan Dumford

Maintenance Crew Leader at City of Woodstock
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Canton, Georgia, US
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Maintenance Crew Leader
      • Apr 2005 - Present

      • Effectively communicates daily with engineers, contractors, equipment representatives, and crew members regarding technical work orders and projects.• Interview, train, and mentor new employees on safety procedures and daily operations. Ensured crew members were given the information and tools needed to be successful.• Maintain a working knowledge of wastewater treatment chemicals and required safety procedures.• Oversee the electrical and mechanical repair and maintenance of all… • Effectively communicates daily with engineers, contractors, equipment representatives, and crew members regarding technical work orders and projects.• Interview, train, and mentor new employees on safety procedures and daily operations. Ensured crew members were given the information and tools needed to be successful.• Maintain a working knowledge of wastewater treatment chemicals and required safety procedures.• Oversee the electrical and mechanical repair and maintenance of all high service pumps, VFDs, blowers, UV disinfection system, membrane filtration, generators, and circuitry throughout the city system that services more than 23,000 residential, commercial and industrial customers.• Order lab testing materials requiring knowledge of Georgia EPD regulations and reporting.• Maintain SCADA system operations and control for wastewater plant.• Maintain and repair 4 wastewater pumps capable of 5 MGD and provide on-call supervision for emergencies such as flooding for when wastewater plant pumps exceeded 2.5 MGD.• Understand microfiltration system consisting of 750 gpm per cassette with 12 cassettes and 48 membrane filters per cassette. • Serviced city wastewater lift stations.• Coordinate with Public Works departments to employ additional work crew as needed. Lead up to 12 crew members for large projects.• Handle inventory control and purchasing for the electrical and mechanical items, including new equipment, chemicals, and laboratory supplies for the wastewater plant. Show more Show less

    • Industrial Electrician
      • Sep 2004 - Apr 2005

      Designed and installed industrial wiring and circuitry systems for manufacturing plants consisting of components such as conveyor belts, compressors, and presses.•Oversaw electrical installation for redesigned city wastewater facility which included feeder breakers of up to 2000 Amps.•Successfully upgraded a marble quarry system including service work on 500 hp motors 1460 Volts•Advised and consulted with contractors on blueprints, schematics, timelines, budgets, and labor.

    • Cell Phone Tower Installation
      • Mar 2004 - Jun 2004

      Participated in the construction of cellphone towers in the Southeast region. •Scope of projects included: slab work, construction of building for technical network and electrical, grounding, and construction of tower.•Safely climbed with harness and rigging system daily ensuring all safety protocols were met.

    • Residential and Commercial Electrician
      • Jan 1998 - Mar 2004

      Provided electrical installation and repair services to residential and commercial accounts in the greater Atlanta area. Services included work and rewiring of electric panels, sub panels, breakers, ground fault, grounding, alarm systems, and entertainment systems.•Evaluated blueprints and schematics daily and identified missing information as needed. •Ensured electrical installation work was to code (NEC).•Demonstrated ability to successfully complete additional projects for owners… Provided electrical installation and repair services to residential and commercial accounts in the greater Atlanta area. Services included work and rewiring of electric panels, sub panels, breakers, ground fault, grounding, alarm systems, and entertainment systems.•Evaluated blueprints and schematics daily and identified missing information as needed. •Ensured electrical installation work was to code (NEC).•Demonstrated ability to successfully complete additional projects for owners including the wiring of new facilities with emphasis on the owner's office and meeting rooms. Show more Show less

Education

  • Georgia High School
    -

Community

You need to have a working account to view this content. Click here to join now