Gennadiy Kraev

Deputy Project Manager / Chief Project Engineer at ФСК
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rotterdam, South Holland, Netherlands, NL
Languages
  • Russian Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Critical Thinking in Management: Information Analysis, Argumentation, and Decision Making
    Practicum by Yandex (INO CPE “Yandex EdTech”)
    Dec, 2022
    - Nov, 2024

Experience

    • Real Estate
    • 1 - 100 Employee
    • Deputy Project Manager / Chief Project Engineer
      • Mar 2023 - Present

      Main project: The 1st Donskoy residential complex, with 400,000 sqm of living space and social, public, and technical infrastructure. Responsibilities:● Development and agreement of technical design brief. Tender support and audit of potential design contractors.● Ensure quality control of the contractor's technical solutions during the pre-project documentation stage in terms of economic and time implications.● Review design documentation and ensure compliance with the regulations, standards of the company, and design brief. Review of bills of quantities and support of tender for selection of construction contractors.● Manage the execution of projects, coordinate activities of contractors, ensure timely information exchange, and monitor progress.● Interaction with all stakeholders, including construction contractors, resource and supply organizations, and regulatory government bodies. Show less

    • Assistant Chief Project Engineer
      • Mar 2022 - Mar 2023

    • Russian Federation
    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Architect
      • Apr 2021 - Mar 2022

      Main projects: Sence | Logos Apartment Complex at 3 Podolskoye Shosse, Stone | Belorusskiy Business Centre, Capital Group | Krasnoyarsk Sports and Recreation Centre, PIK | 110 Kurortny Prospect Residential Complex in Sochi, Level Group | Yuzhnoportoviy Residential ComplexAchievements:● Won 7 intra-team competitions for architectural and urban planning solutions;● 10 albums of architectural and urban planning concepts were developed; ● 2 positive expert opinions were received;● 1 construction documentation was completed.Responsibilities:Development of architectural and urban planning, massing and facade concepts, albums of architectural and urban solutions, development of architectural solutions and disabled access to the stage of design documentation, passing the examination, development of working documentation, development of nodes, coordination with engineers and designers, preparation of tasks. Show less

    • Architect
      • Oct 2018 - Apr 2021

    • Russian Federation
    • Civil Engineering
    • 1 - 100 Employee
    • BIM Coordinator
      • May 2017 - Oct 2018

      Main project: VTB Arena, Wine Tourism Center. Responsibilities: ● Organisation of processes and support for designers in BIM environment; ● Checking models for compliance with modeling requirements; ● Collision analysis in Navisworks environment; ● Issuing reports; ● Coordination of designers in the process of collision elimination; ● Development of Revit families. Main project: VTB Arena, Wine Tourism Center. Responsibilities: ● Organisation of processes and support for designers in BIM environment; ● Checking models for compliance with modeling requirements; ● Collision analysis in Navisworks environment; ● Issuing reports; ● Coordination of designers in the process of collision elimination; ● Development of Revit families.

    • Construction Site Manager
      • Aug 2015 - Aug 2016

      Main project: General contractor for the construction of Shustov-Park residential complex (two 14-storey monolithic brick residential buildings in Solnechnogorsk, ul. Leningradskaya 20)Responsibilities:Construction management, execution of production tasks, execution of work schedule, control over supplies of materials, supply of materials, control of the regulatory documentation, executive documentation in accordance with the regulations, preparation and signing of financial statements, write-off of materials, control and maintenance of health and safety, input control materials. Show less

    • Construction Site Foreman
      • Jul 2014 - Aug 2015

  • USTI Ltd.
    • Moscow, Russia
    • Junior Architect
      • Jul 2013 - Dec 2013

      Main projects: Reconstruction of the Research and Development Institute of Physical Measurements (JSC NIIFI) in Penza. Correction of facade and planning drawings, detail drawings at the design stage documentation. Work in AutoCAD. Main projects: Reconstruction of the Research and Development Institute of Physical Measurements (JSC NIIFI) in Penza. Correction of facade and planning drawings, detail drawings at the design stage documentation. Work in AutoCAD.

Education

  • Moscow Architectural Institute (State Academy) (MARCHI )
    Bachelor's degree, Architecture
    2016 - 2020
  • Moscow College of Architecture and Management in Construction
    Architecture
    2010 - 2014

Community

You need to have a working account to view this content. Click here to join now