Luis Miguel Mora, P.E.
Electrical/ITS Engineer at Lochner- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Spanish Native or bilingual proficiency
-
Italian Elementary proficiency
Topline Score
Bio
Credentials
-
Professional Engineer (PE)
Florida Board of Professional EngineersJul, 2023- Nov, 2024 -
Engineer Inter
Florida Department of Business and Professional RegulationOct, 2022- Nov, 2024 -
Electrical Contractor
Florida Department of Business and Professional RegulationOct, 2021- Nov, 2024
Experience
-
Lochner
-
United States
-
Civil Engineering
-
400 - 500 Employee
-
Electrical/ITS Engineer
-
Nov 2021 - Present
- ITS fiber engineering. - Gathered, reviewed, and incorporated as-built plans into designs after conducting field visits to identify discrepancies or potential conflicts with the proposed design. - Drew the plans with all necessary ancillary to meet the FDOT, ADA, and NEC requirements. - Performed various electrical calculations to determine wire size, transformer size, conduit size, automatic transfer switch (ATS) size and disconnect size. Furthermore, I created single line… Show more - ITS fiber engineering. - Gathered, reviewed, and incorporated as-built plans into designs after conducting field visits to identify discrepancies or potential conflicts with the proposed design. - Drew the plans with all necessary ancillary to meet the FDOT, ADA, and NEC requirements. - Performed various electrical calculations to determine wire size, transformer size, conduit size, automatic transfer switch (ATS) size and disconnect size. Furthermore, I created single line diagrams, communication plans, and splice diagrams to assure the proper integration with the FDOT fiber optic network. - Developed concept of operation plans (ConOps), systems engineering management plans (SEMP), and minimum technical requirement reports as required by the client. - Responsible for plans preparation and calculations. - My responsibilities include providing calculations for generator sizing, conduit sizing, conductor sizing, overcurrent protection sizing, electrical panel calculation, voltage drop, and conduit fill capacity. - Performed point-by-point photometric analysis, creating lighting design analysis reports (LDAR), single line diagrams, panelboard schedules, and three phases motor protection. Show less - ITS fiber engineering. - Gathered, reviewed, and incorporated as-built plans into designs after conducting field visits to identify discrepancies or potential conflicts with the proposed design. - Drew the plans with all necessary ancillary to meet the FDOT, ADA, and NEC requirements. - Performed various electrical calculations to determine wire size, transformer size, conduit size, automatic transfer switch (ATS) size and disconnect size. Furthermore, I created single line… Show more - ITS fiber engineering. - Gathered, reviewed, and incorporated as-built plans into designs after conducting field visits to identify discrepancies or potential conflicts with the proposed design. - Drew the plans with all necessary ancillary to meet the FDOT, ADA, and NEC requirements. - Performed various electrical calculations to determine wire size, transformer size, conduit size, automatic transfer switch (ATS) size and disconnect size. Furthermore, I created single line diagrams, communication plans, and splice diagrams to assure the proper integration with the FDOT fiber optic network. - Developed concept of operation plans (ConOps), systems engineering management plans (SEMP), and minimum technical requirement reports as required by the client. - Responsible for plans preparation and calculations. - My responsibilities include providing calculations for generator sizing, conduit sizing, conductor sizing, overcurrent protection sizing, electrical panel calculation, voltage drop, and conduit fill capacity. - Performed point-by-point photometric analysis, creating lighting design analysis reports (LDAR), single line diagrams, panelboard schedules, and three phases motor protection. Show less
-
-
-
Protonup.com
-
United States
-
IT Services and IT Consulting
-
Founder
-
Jul 2020 - Oct 2021
Protonup.com is a high demand API that contain a database with thousand of EV charging stations and other relevant information. Protonup.com is developing a SaaS for optimization methods for Electric Vehicle Fleets charging stations. Protonup.com is a high demand API that contain a database with thousand of EV charging stations and other relevant information. Protonup.com is developing a SaaS for optimization methods for Electric Vehicle Fleets charging stations.
-
-
-
SICE
-
IT Services and IT Consulting
-
700 & Above Employee
-
Electrical Project Manager
-
Dec 2019 - Apr 2021
- Directs the scheduling and installation of intelligent equipment of key personnel team and subcontractors, reducing non-productive time. - Oversees work in progress to reach production goals and budget, while monitoring deviations. - Conducts continuous communication with clients and identifies potential new opportunities to turn them into cumulative paths of business and revenue. - Creates technical installation protocols, capable to decrease drastically the learning curve and… Show more - Directs the scheduling and installation of intelligent equipment of key personnel team and subcontractors, reducing non-productive time. - Oversees work in progress to reach production goals and budget, while monitoring deviations. - Conducts continuous communication with clients and identifies potential new opportunities to turn them into cumulative paths of business and revenue. - Creates technical installation protocols, capable to decrease drastically the learning curve and enhance overall efficiency. - Created a maintenance of communication plan, single line diagrams, and technical reports to maintain the electrical and communication FDOT network during the six temporary phases of the project. - My responsibilities included maximizing the efficiency of the design and reducing the project cost while meeting project’s specifications and NEC standards. For this purpose, assessed electrical calculation such voltage drops, conduit fills, wire sizing, transformer sizing and service load for the Lighting, ITS and Signalization plans. - Drew As-Built plans for all electrical disciplines, ensuring accurate documentation of the project's final electrical infrastructure. - Recommended alternative lighting design that had a cost saving factor after performing reliable photometric and electrical calculations. - Conducted inspections to ensure that the electrical and infrastructure components were installed in complete adherence to the plans, drawings, and National Electric Code. - Coordinated with FPL the service points locations in accordance with the voltages and load needs. - Recommended design changes due to unforeseen field conditions on Lighting, ITS, Tolling and Signalization scope of work. Show less - Directs the scheduling and installation of intelligent equipment of key personnel team and subcontractors, reducing non-productive time. - Oversees work in progress to reach production goals and budget, while monitoring deviations. - Conducts continuous communication with clients and identifies potential new opportunities to turn them into cumulative paths of business and revenue. - Creates technical installation protocols, capable to decrease drastically the learning curve and… Show more - Directs the scheduling and installation of intelligent equipment of key personnel team and subcontractors, reducing non-productive time. - Oversees work in progress to reach production goals and budget, while monitoring deviations. - Conducts continuous communication with clients and identifies potential new opportunities to turn them into cumulative paths of business and revenue. - Creates technical installation protocols, capable to decrease drastically the learning curve and enhance overall efficiency. - Created a maintenance of communication plan, single line diagrams, and technical reports to maintain the electrical and communication FDOT network during the six temporary phases of the project. - My responsibilities included maximizing the efficiency of the design and reducing the project cost while meeting project’s specifications and NEC standards. For this purpose, assessed electrical calculation such voltage drops, conduit fills, wire sizing, transformer sizing and service load for the Lighting, ITS and Signalization plans. - Drew As-Built plans for all electrical disciplines, ensuring accurate documentation of the project's final electrical infrastructure. - Recommended alternative lighting design that had a cost saving factor after performing reliable photometric and electrical calculations. - Conducted inspections to ensure that the electrical and infrastructure components were installed in complete adherence to the plans, drawings, and National Electric Code. - Coordinated with FPL the service points locations in accordance with the voltages and load needs. - Recommended design changes due to unforeseen field conditions on Lighting, ITS, Tolling and Signalization scope of work. Show less
-
-
-
OnGCloud.com
-
Technology, Information and Internet
-
Start-Up Founder
-
Apr 2014 - Jan 2021
Monitoring System based in oil wells automation, where O&G operators can continuously monitoring their production and relevant data thru the cloud. Monitoring System based in oil wells automation, where O&G operators can continuously monitoring their production and relevant data thru the cloud.
-
-
-
Grupo ACS
-
Construction
-
1 - 100 Employee
-
Electrical Project Manager
-
Aug 2016 - Nov 2019
Midasco - Directs the scheduling and installation of intelligent equipment of key personnel team and subcontractors, reducing non-productive time. - Oversees work in progress to reach production goals and budget, while monitoring deviations. - Conducts continuous communication with clients and identifies potential new opportunities to turn them into cumulative paths of business and revenue. - Creates technical installation protocols, capable to decrease drastically the learning… Show more Midasco - Directs the scheduling and installation of intelligent equipment of key personnel team and subcontractors, reducing non-productive time. - Oversees work in progress to reach production goals and budget, while monitoring deviations. - Conducts continuous communication with clients and identifies potential new opportunities to turn them into cumulative paths of business and revenue. - Creates technical installation protocols, capable to decrease drastically the learning curve and enhance overall efficiency. - Main achievements: Managing Miami-Dade, 836 MDX and FDOT projects ($48MUSD) - Assessed the photometric constraints and designed temporary lighting alternatives. - Conducted voltage drop calculations to size electrical wires, calculated size of overcurrent protection, and calculated service load for each TTCP phase of the project. I conducted inspections to ensure that the electrical components were installed in complete adherence to the plans, drawings, and National Electric Code. - Proposed corrections when a deficiency was detected. - Made contribution to the design plans revisions during the post-design phase. I directed field changes, when necessary, due to unforeseen field conditions. - My responsibilities included preforming calculations for conduit size, conduit fill capacity, and maximum conduit bending radius on electrical infrastructure for Tolls Facilities and ITS. - Supervised the installation and proper bonding of the lightning protection system in accordance with NFPA 780 for 5 toll gantries and toll building facilities. - Provided leadership, motivation, and direction to project team members throughout the project life cycle to ensure projects are completed within budget and on schedule. - Prepared As-Built plans for the Design-Build Engineer of Record for all electrical disciplines, ensuring accurate documentation of the project's final electrical infrastructure.
-
-
Energy Business Development Manager
-
Nov 2012 - Jul 2016
- Grupo Cobra is part of the ACS Group, largest privately-owned construction company in the world. - Started the Energy Division for Cobra Group in USA, searching for key alliances to start drilling operations and introducing our services to new clients while creating a business structure. - Responsible for business development of sourcing projects in the Energy sector. Managed bid preparations negotiating with strategic partners and clients. - Coordinated country wide energy… Show more - Grupo Cobra is part of the ACS Group, largest privately-owned construction company in the world. - Started the Energy Division for Cobra Group in USA, searching for key alliances to start drilling operations and introducing our services to new clients while creating a business structure. - Responsible for business development of sourcing projects in the Energy sector. Managed bid preparations negotiating with strategic partners and clients. - Coordinated country wide energy operations, managing crews, supervising the acquisition of high-tech equipment and scheduling activities. - Main achievements: Successfully completed 10+ oil wells with production of +300BBL a day in Texas and Oklahoma. - Successfully was shortlisted for Trans Anatolian Natural Gas Pipeline Project TANAP (11MMUSD), PetroAmazonas Campaign in Ecuador (70MUSD) and prequalified for the Sonangol Project. (45MUSD)
-
-
Energy Maintenance Department Manager
-
Jul 2012 - Nov 2012
- Responsible to direct engineering and technical personnel to solve software and hardware problems with electronic drilling rigs. - Supervised, coordinated, and scheduled maintenance equipment activities, reducing NPT due to electronics failures from 5% to >3% in 3 months. - Main achievements: Promoted to lead the USA division in 4 months.
-
-
-
Urbaser
-
Spain
-
Environmental Services
-
700 & Above Employee
-
Assistant Project Manager
-
Sep 2008 - Jul 2012
- Assisted project planning, scheduling and control. - Developed technical procedures for a waste management plant. - Provided technical direction and ensured compliance with QHSE standards. - Responsible for personnel management. - AutoCAD design. - Assisted mechanics and technical personnel to solve electrical and or mechanical problems with waste management trucks. - Assisted project planning, scheduling and control. - Developed technical procedures for a waste management plant. - Provided technical direction and ensured compliance with QHSE standards. - Responsible for personnel management. - AutoCAD design. - Assisted mechanics and technical personnel to solve electrical and or mechanical problems with waste management trucks.
-
-
Education
-
Universidad Miguel Hernández de Elche
Bachelor Degree in Electronic Engineering and Telecommunication, Electronics -
Atlantis University
Master of Business Administration - MBA, Information Technology -
University of Michigan
Specialization, Python