Marina Hueners
Senior Associate Planner/Urban Designer at QK- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Creativity Bootcamp
LinkedInAug, 2019- Nov, 2024 -
On the Job Site: Construction
LinkedInAug, 2019- Nov, 2024
Experience
-
QK
-
Civil Engineering
-
100 - 200 Employee
-
Senior Associate Planner/Urban Designer
-
Jul 2021 - Present
-
-
-
Dewberry
-
United States
-
Engineering Services
-
700 & Above Employee
-
Landscape Architect
-
Dec 2016 - Jul 2021
• Implemented land-use amendment plans for residential subdivisions, mixed-use infrastructure, commercial, retail, electrical substations, and industrial sites. • Developed comprehensive plan amendments, rezoning plans, special use permits, conditional use permits, master zoning plans, conceptual exhibits, and processed entitlement permit applications for customer clients. • Drafted and reviewed construction site plans to be in compliance with Local County, and City code zoning ordinances, procedures, and state department of transportation regulations. • Managed and executed GIS based environmental constraints analysis maps to include: soils, existing vegetation, steep slopes, trails, wetlands information, Waters of the U.S analysis, 100 Year floodplains, topography, and endangered species maps to ensure state and federal compliances. • Researched and delivered land-use maps to display parcels, structures, Right-of-Way easements, electrical utility easements, vehicular, and pedestrian circulation. • Constructed and prepared project exhibits, 3D visualization graphics, diagrams, and charts for general public to review. Show less
-
-
-
Louis Berger
-
United States
-
Civil Engineering
-
700 & Above Employee
-
Landscape Architectural Designer
-
Dec 2012 - Dec 2016
• Designed and Delivered final landscape site plans for Statue of Liberty, National Park Service (NPS). • Orchestrated multiple military master planning projects throughout the U.S. to obtain federal funding. • Constructed environmental analysis plans, short, mid, and long range reports for China Lake Naval Air Weapons Station (NAWS), Fort Irwin National Training Center, and Fort Leavenworth Army installation. • Successfully executed concurrent project deadlines for multiple U.S military installations. • Managed and organized facility functions, construction phase plans, and provided electrical utility recommendations for U.S Army Intelligence and Security Command (INSCOM). • Assembled and strategized stakeholder workshops with installation planners, environmental engineers, architects, and military installation personnel in preparing the installation's vision master plan report. • Executed existing utility base maps, prepared documentation, developed section drawings based on analysis, and created maps in accordance with National Environmental Policy Act (NEPA), Legislative Environmental Impact Statement (LEIS), UFC-2-100-01, Bureau Land Management (BLM), and AR-420 Army Facilities Management handbook. • Managed and delivered ArcGIS existing conditions maps to include: restricted airspace, utility infrastructure networks, road transportation networks, facilities conditions assessments, environmental assessments, site evaluation assessment, geological faults, soils, hydrology, vegetation, threatened and endangered species. • Developed design guidelines for military installations to include sustainable solutions and strategies pertaining to site specific climates with natural disasters. Show less
-
-
Education
-
California Polytechnic State University-San Luis Obispo
Bachelor's degree, Landscape Architecture