Rifki Rashad

Hydro Engineer at PT.Kasongan Bumi Kencana
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Mining
    • 100 - 200 Employee
    • Hydro Engineer
      • Oct 2022 - Present

      Responsible for developing hydrological-hydrogeological monitoring program and support for regulatory compliance program (Underground Mining Feasibility Study and Environmental Impact Assessment). Provide underground dewatering plan for proposed mines. Provide technical support using GIS, hydrological, and hydrogeological software. Responsible for developing hydrological-hydrogeological monitoring program and support for regulatory compliance program (Underground Mining Feasibility Study and Environmental Impact Assessment). Provide underground dewatering plan for proposed mines. Provide technical support using GIS, hydrological, and hydrogeological software.

    • Indonesia
    • Business Consulting and Services
    • 300 - 400 Employee
    • Hydrogeologist
      • Jun 2020 - Sep 2022

      Responsible for conducting field tests and data acquisition (wellsite/drilling supervision, geotechnical logging, hydrological mapping, aquifer tests on wellsites, well design and construction, water sampling, river discharge measurement, and georesistivity survey). Responsible for project management, technical reporting and presentation. Provide technical support using GIS, hydrological, and hydrogeological software. Projects: - Hydrological and Hydrogeological Studies for Underground Mining, PT Citra Palu Minerals - Hydrological and Hydrogeological Studies for Open Pit Mining, PT Gorontalo Minerals - Geotechnical and Hydrogeological Studies for Dry Stack Tailing Facility, PT Pelsart Tambang Kencana - Dry Stack Tailing Facility Supervision, PT Halmahera Persada Lygend - Geotechnical and Hydrogeological Studies for Main Road Access, PT Sumbawa Timur Mining - Study of Hydrology and Hydrogeology for Pond Plan in Bakan Block, PT J Resources Bolaang Mongondow

    • Indonesia
    • Higher Education
    • 700 & Above Employee
    • Hydrogeologist and Lab Equipment Operator at Laboratorium of Hydrogelology and Hydrogeochemistry
      • Apr 2019 - Mar 2020

      - Estimation of Geothermal Potential Zones by Utilizing The Results of Ground Gas Measurements in Patuha Geothermal Field, Bandung Regency, Apr 2019 - Aug 2019- Constant Head Permeameter Operator, Oct 2019 - Feb 2020- Study of Hydrogeology, Hydrogeochemistry, and Isotope to Determine The Water Level Fluctuation of Lake Batur, Kintamani, Bali Regency, Feb 2020 - Mar 2020

    • Genesis of Mineral Deposits Course Assistant
      • Sep 2019 - Dec 2019

      Responsible for giving practical tutorials on how to identify ore minerals byusing the genetic classification

    • Field Mapping Course Assistant
      • Jan 2019 - Dec 2019

      - Responsible for giving practical tutorials on how to conduct field mapping,surveying with Total Station, scanline sampling for rock engineering survey- Organized a field course to Karangsambung Geopark, Central Java

    • Geochemistry and Ore Analysis Assistant in Mining Engineering Department
      • Jan 2019 - May 2019

      - Responsible for giving practical tutorials on how to conduct survey on geochemical anomalies- Organized a field course to a gold mining site in Ciseuti, West Java

    • Crystallography, Mineralogy, and Petrology Assistant in Mining Engineering Department
      • Aug 2018 - Dec 2018

      Responsible for giving practical tutorials on how to identify crystals,minerals, and rocks

    • Mining
    • 500 - 600 Employee
    • Student Intern
      • May 2018 - Jun 2018

Education

  • Institut Teknologi Bandung
    Bachelor's degree, Mining and Mineral Engineering
    2015 - 2020

Community

You need to have a working account to view this content. Click here to join now