Jeroen Godtschalk

Senior Consultant | Manager Offshore Wind at BLIX Consultancy
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
NL
Languages
  • English Full professional proficiency
  • German Limited working proficiency
  • French Elementary proficiency
  • Dutch Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Roland Kneissl

During the time period I worked with Jeroen, he assisted with the setting up of a Dutch organisation for the Witron Onsite Services organisation in The Netherlands. During this time, I have come to know Jeroen as a person that is enthusiastic, pleasant, honest and with a sense of humour. Although, I worked only a relatively short period with Jeroen, I am sure that Jeroen can contribute positively to any organisation.

Frank Visser

Ik werk nu ruim anderhalf jaar samen met Jeroen die als directeur van onze afdeling Productie en Techniek met veel enthousiasme de diverse collega’s van de afdeling heeft samengesmeed tot een team. Zijn manier van werken is direct, duidelijk, geen onzin verhalen en altijd met een vleugje humor, al met al heel prettig om mee samen te werken!

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Netherlands
    • Business Consulting and Services
    • 1 - 100 Employee
    • Senior Consultant | Manager Offshore Wind
      • Nov 2019 - Present

      Senior Consultant and manager of the Offshore Wind Department in BLIX. I am a broadly interested and experienced consultant who works on a variety of projects related to both offshore wind and onshore wind. My main focus is on the project management of site investigations for offshore wind farms (geophysical, geotechnical, metocean), but I also work on feasibility studies, technical due dilligences, transport & installation work and onshore wind farms. I am also a creator and teacher of various courses on site selection for offshore wind farms at the EAGE and DOB-Academy.

    • Germany
    • Transportation, Logistics, Supply Chain and Storage
    • 700 & Above Employee
    • Onsite Manager
      • Jan 2019 - Oct 2019

    • Netherlands
    • Construction
    • 1 - 100 Employee
    • Director Production & Technology
      • Apr 2017 - Dec 2018

      Director of the Production & Technology department of Dekker Grondstoffen. Responsible for the day to day management as well as the long term strategy of both the Dutch activities as well as the activities in France and Germany. Department consisted of about 75 fte and main achievements are the reorganisation of the French and German activities; further optimisation and structuring of the Dutch activities; electrification of the Dutch fleet and an improved HSEQ policy. Director of the Production & Technology department of Dekker Grondstoffen. Responsible for the day to day management as well as the long term strategy of both the Dutch activities as well as the activities in France and Germany. Department consisted of about 75 fte and main achievements are the reorganisation of the French and German activities; further optimisation and structuring of the Dutch activities; electrification of the Dutch fleet and an improved HSEQ policy.

    • Netherlands
    • Engineering Services
    • 700 & Above Employee
    • Operations Manager
      • Jan 2011 - Mar 2017

      Operations Manager in the Asset Management Department. Responsible for all operational matters of the vessels, including vessel logistics/supply chain, production monitoring, importation of the vessel and equipment, crew logistics, budget input and day-to-day 24/7 management of the vessels. - From September 2014 - March 2017: Operations Manager DCV "Aegir" - From January 2011 to September 2014: Operations Manager H851 floatover barge. Operations Manager in the Asset Management Department. Responsible for all operational matters of the vessels, including vessel logistics/supply chain, production monitoring, importation of the vessel and equipment, crew logistics, budget input and day-to-day 24/7 management of the vessels. - From September 2014 - March 2017: Operations Manager DCV "Aegir" - From January 2011 to September 2014: Operations Manager H851 floatover barge.

    • Netherlands
    • Oil and Gas
    • 500 - 600 Employee
    • Project Manager
      • Mar 2009 - Dec 2010

      Completed projects:* Oil production improvement of the oil production of a North Sea FPSO. Due to various reasons and defects, oil production was not at the desired levels and a task force was established to evaluate and solve the problems in the top-sides and equipment. * Project close out of 3 large SPM FSO mooring systems for Maersk Oil Qatar* Upgrade and repair work for SPM system for the Rompetrol Oil Terminal in Midia (Romania)

    • General Manager
      • Apr 2006 - Mar 2009

      General Manager of the Bluewater Kuala Lumpur office. The office was built up from scratch. There were 0 employees in June 2006 to around 50 fte in March 2009.

    • Project Engineer
      • Jul 2005 - Apr 2006

      Responsible for management of the engineering team and compliance of the engineering work with Client and Classification Authority requirements on various Single Point Mooring projects worldwide.

    • Proposal Engineer
      • Jul 2003 - Jun 2005

      Preparation of numerous technical and commercial proposals for various tenders (turrets, CALM buoys, deep water SPM systems). Liaising with clients and participate in various technical and commercial meetings and/or negotiations.

    • Geotechnical/Offshore Installation Engineer
      • Aug 2000 - Jul 2003

      Geotechnical design work for drag anchors, anchor piles, mooring chains/wires and the offshore installation of the system. Involved in soil surveys (geotechnical and geophysical), tow out and installation/hook-up of FPSO's and numerous other offshore works.

    • Netherlands
    • Telecommunications
    • 700 & Above Employee
    • Contract Engineer
      • Apr 1999 - Jun 2000

      Responsible for the technical evaluation of requests to place 3rd party antennas and equipment in KPN masts and on KPN property. Responsible for the technical evaluation of requests to place 3rd party antennas and equipment in KPN masts and on KPN property.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Internship
      • Feb 1998 - Oct 1998

      Internship for thesis project: Investigation into the added value of high resolution seismics Internship for thesis project: Investigation into the added value of high resolution seismics

Education

  • Universiteit Utrecht
    MSc, Geophysics
    1992 - 1998
  • Christelijk Lyceum-Havo Gouda
    VWO, Atheneum
    1985 - 1992

Community

You need to have a working account to view this content. Click here to join now