Talat Khafash, P.Eng., PMP
PM/Estimator at VOLKER STEVIN Canada- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Arabic Professional working proficiency
-
French Limited working proficiency
Topline Score
Bio
Experience
-
Volker Stevin Canada
-
Canada
-
Construction
-
100 - 200 Employee
-
PM/Estimator
-
Aug 2021 - Present
-
-
-
Kiewit
-
United States
-
Construction
-
700 & Above Employee
-
Estimator
-
Jan 2019 - Aug 2021
-
-
Superintendent
-
May 2016 - Jan 2019
-
-
Estimator
-
Feb 2016 - May 2016
-
-
Engineer, EIT
-
Oct 2015 - Mar 2016
Preformed preliminary construction system walkdowns and provided the General Superintendent with a list of remaining work to be completed and a punchlist identifying all construction deficiencies that required remedial actions before turning over the system package to QC.
-
-
-
Kiewit
-
United States
-
Construction
-
700 & Above Employee
-
Lead Engineer, EIT
-
2013 - 2015
- Trained field engineers in field inspections, quantity tracking, material control.- Incorporated plans, specifications, and schedule to ensure required materials are available.- Tracked cost and progress by developing and reporting daily and weekly cost reports and tracking quantities installed.- Liaised with suppliers and vendors to deliver equipment and material to site as needed.- Reviewed RFI's, NCRs and SDRs before transmitting the documents.- Act as an effective communication link between the piping team and engineering to provide quality feedback on design issues and their potential impact on construction and schedule. - Review and analyze design changes/change notices and their impact on baseline schedule. Communicate all the changes to the department and track the progress.- Work closely with general superintendent to assess man power required for project execution purposes. - Audit daily claiming reports submitted by field engineers.
-
-
Field Engineer, EIT
-
2013 - 2013
- Assisted job Superintendent on planning and scheduling.- Development of work plans for individual scopes of work.- Preformed walkdowns and quality inspections of work areas.- Identify problems, inaccuracies, and cost savings measures that may arise.- Work progress tracking and reporting.- Maintain As-built drawings.- Gained working knowledge on cranes and rigging by planning and supervising heavy pipe installation.
-
-
Piping FIWP Lead, EIT
-
2012 - 2013
- Developed complete understanding of contract plans, specifications and applicable codes.- Supervised, trained and mentored planning engineers in their respective duties and responsibilities as assigned.- Delegated and assigned tasks to team members which included, preparing FIWP’s, developing RFI’s for approvals, and uploading data into the system to track progress.- Performed detailed quantity take-offs, construction sequence planning and provided specifications and quantities of materials to the procurement group for purchasing.- Work with the Procurement department to ensure that the required materials are processed and received at site within required time frames.- Ensure Engineering Deliverables are released for planning phase of every project.- Have a thorough knowledge of the project quality management system, work instructions and procedures.- Prepare templates for the Quality and Completions Department to track the progress of tasks completed.
-
-
Education
-
University of Toronto
Engineer’s Degree, Engineering