Kenny Stevenson
Project Manager at Swain Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Mark Dodd
Kenny originally began working for me as Chainman as part the soil hospital on the Olympic Park development. Having shown a quick grasp to site skills, and a exceptional knowledge of plant and equipment, Kenny was quickly given the new role of logistics coordinator. Kenny has extremely good people skills, and thrives on working in high pressure environments. The commonly used phrase of "If you need something on site, then Kenny is the man to get it," was highly deserved. I would have no hesitation in having Kenny work for or with me again.
Mark Dodd
Kenny originally began working for me as Chainman as part the soil hospital on the Olympic Park development. Having shown a quick grasp to site skills, and a exceptional knowledge of plant and equipment, Kenny was quickly given the new role of logistics coordinator. Kenny has extremely good people skills, and thrives on working in high pressure environments. The commonly used phrase of "If you need something on site, then Kenny is the man to get it," was highly deserved. I would have no hesitation in having Kenny work for or with me again.
Mark Dodd
Kenny originally began working for me as Chainman as part the soil hospital on the Olympic Park development. Having shown a quick grasp to site skills, and a exceptional knowledge of plant and equipment, Kenny was quickly given the new role of logistics coordinator. Kenny has extremely good people skills, and thrives on working in high pressure environments. The commonly used phrase of "If you need something on site, then Kenny is the man to get it," was highly deserved. I would have no hesitation in having Kenny work for or with me again.
Mark Dodd
Kenny originally began working for me as Chainman as part the soil hospital on the Olympic Park development. Having shown a quick grasp to site skills, and a exceptional knowledge of plant and equipment, Kenny was quickly given the new role of logistics coordinator. Kenny has extremely good people skills, and thrives on working in high pressure environments. The commonly used phrase of "If you need something on site, then Kenny is the man to get it," was highly deserved. I would have no hesitation in having Kenny work for or with me again.
Experience
-
Swain Group
-
United Kingdom
-
Transportation, Logistics, Supply Chain and Storage
-
1 - 100 Employee
-
Project Manager
-
Sep 2022 - Present
-
-
-
Select Plant Hire
-
United Kingdom
-
Construction
-
200 - 300 Employee
-
Lifting supervisor
-
May 2022 - Aug 2022
-
-
-
A & S Faceades
-
Kingston upon Thames, England, United Kingdom
-
Lifting supervisor
-
Feb 2022 - May 2022
-
-
-
Midgard Ltd
-
United Kingdom
-
Construction
-
200 - 300 Employee
-
Logistics Manager
-
Apr 2018 - Dec 2021
260 apartments built on a 900t steel structure with precast concrete encapsulating the DLR Bank line. As well as ha having 3 elevations of the building having rail interfaces, two out of the 3 hoarded sides of the boundary have one of TFL's super cycle highway passing the 2 number delivery gates. 260 apartments built on a 900t steel structure with precast concrete encapsulating the DLR Bank line. As well as ha having 3 elevations of the building having rail interfaces, two out of the 3 hoarded sides of the boundary have one of TFL's super cycle highway passing the 2 number delivery gates.
-
-
-
Wates Group
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Logistics Manager
-
Apr 2017 - Sep 2017
-
-
-
-
Logistics Manager
-
Jan 2015 - Apr 2017
Renovation of the Midland bank hq in Bank, London into a luxury hotel. Renovation of the Midland bank hq in Bank, London into a luxury hotel.
-
-
-
Alstom Transport
-
Nottingham. United Kingdom
-
Logistics Manager/Coordinator
-
Jun 2013 - Jan 2015
Alstom Transport – Nottingham I am currently working for Alstom Transport as part of a joint venture (Taylor Woodrow Alstom JV) delivering the Nottingham NET (phase 2) project; this phase includes two additional tram lines out of the city center. I work within what is known as the OPC team Alstom Transport; as a team we are the main interface between the tack team for Alstom and Taylor Woodrow; Alstom are tasked with all of the installation of the rail slab track, rails and overhead poles and power cable instillations. Logistically this is quite a demanding project due to the amount of satellite sites around the city and the planning permissions set in place by the local council and NET (client). In my time here I have set up, maintained and managed a delivery management system to ensure better planning for Alstoms side of the project. My main roles for the company included: •Attending interface and handover meetings – arranging the safest possible access, egress and working areas •Liaising with TW to plan the safest and most time efficient access/egress to all sites for all deliveries. •Liaising with company planners, the procurement team, site managers and engineers to schedule planned works for the weeks ahead. •Managing/planning all plant and material movements around the project to the most cost effective and time efficient manner as possible including producing task briefings and RAMS for the movements. •Ensuring all deliveries are made in compliance to the projects EHS regulations and County Councils planning permissions. •Supervising HGV/HIAB operators loading/unloading materials and machinery on site (typically abnormal loads). Show less
-
-
-
Caddick Construction LTD
-
Aylesbury, Buckinghamshire, UK
-
Logistics Manager/coordinator
-
Feb 2012 - Jun 2013
New Dairy undergoing construction: Working as part of the principle contractor management structure in constructing the country’s biggest dairy factory; being the first Logistics Manager that CCL have taken on I have had to set up various systems and trackers to control subcontractors and CCL’s own deliveries and collections to/from the site working in regulation to the strict planning permission for the project. I am also heavily involved in the procurement of the site set up, plant and materials for site. My main roles for the company include: • Produce daily/weekly logistics schedules and trackers. • Produce and maintain the site waste management plan. • Manage all sub-contractors waste segregation. • Procurement of plant and materials. • Manage and report a live hire and purchase cost registers of plant/materials/services. • Manage H&S Signage internally around site. • Manage/set up/maintain welfare facilities to HSE standard. • Coordination of temporary works. • Organize and manage any additional labor that may be required. Show less
-
-
-
Galliford Try
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Assistant Buyer
-
Nov 2011 - Jan 2012
Assistant buyer for MGJV working on behalf of Thames Water as part or the AMP 5 frame work agreement. As the assistant buyer my roles and responsibilities include; Processing material purchase orders on DEMA from requisitions sent in by various sites around the south of England. Purchase the products in accordance with the established budgets, seeking quotes on prices and availability of materials from a variety of suppliers. Manage and report on the accumulative cost of all new purchases. To ensure all materials comply with health and safety guidelines. Keeping all sub-contract orders up to date on DEMA. Liaising with suppliers and the site operations teams; resolve/deal with invoice queries. Show less
-
-
-
Morrison Galliford Joint Venture (MGJV)
-
London, United Kingdom
-
Logistics Coordinator
-
Jan 2011 - Nov 2011
Logistics Coordinator for the rehabilitation of the Finsbury Park and Woodford, 42" and 36" water mains running through the 2012 Olympic Park. As logistics coordinator for the MGJV project on The Olympic Park, my roles and responsibilities included among other things: Ensuring all bookings (deliveries/collections) for plant/materials are processed on the ODA web based Delivery Management System (DMS). Booking of abnormal loads in accordance to vehicle/load specification. Ensuring abnormal loads are compliant with UK legislation. Procurement and negotiation of plant and material supply contracts. Keeping all relevant site documentation required to record all plant and material requisitions. Monitoring and tracking of waste material movements through different waste streams to ensure compliance with UK Waste Regulations. Completion of client waste returns on quarterly basis, based around onsite completed Waste Transfer Notes/Consignment Notes Liaison with Health, Safety and Environmental specialists to ensure materials/plant are removed from site safely and within the requirements of UK Environmental Legislation Show less
-
-
-
2010 - 2011 ATKINS
-
London, United Kingdom - The Olympic Park
-
Soil Hospital Management Team
-
Jun 2010 - Jun 2011
Member of a team managing the reuse of site waste materials within the Olympic Park project, handling processing/treating and redistributing over 1.8million tons of waste materials including soils and concrete. Within the Soil Hospital team I was heavily involved in arranging the chemical and geotechnical sampling and testing of all materials for waste classification and assessment against reuse criteria. Member of a team managing the reuse of site waste materials within the Olympic Park project, handling processing/treating and redistributing over 1.8million tons of waste materials including soils and concrete. Within the Soil Hospital team I was heavily involved in arranging the chemical and geotechnical sampling and testing of all materials for waste classification and assessment against reuse criteria.
-
-
-
2009 - 2010 Morrison Construction
-
London, United Kingdom - Olympic Park
-
Soil Hospital Operations Team
-
May 2009 - Jul 2010
Logistics coordination, construction material tracking, material stockpile surveying Logistics coordination, construction material tracking, material stockpile surveying
-
-
-
Morrison Construction
-
Construction
-
300 - 400 Employee
-
Logistics Coordinator
-
May 2009 - Jul 2010
Many of my roles and responsibilities were the same as the above two positions i.e. managing the DMS. Other duties included: Surveying material stockpiles Drawing and maintaining stockpile plans Many of my roles and responsibilities were the same as the above two positions i.e. managing the DMS. Other duties included: Surveying material stockpiles Drawing and maintaining stockpile plans
-
-