Maurice van Hall

Realization Project Manager at NTS-Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Eindhoven, North Brabant, Netherlands, NL
Languages
  • English Full professional proficiency
  • German Professional working proficiency
  • Dutch Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Marc Keijsers

Maurice is a constructive, open minded BPA in ASML's IT department. We worked together on a few cross departmental projects where IT contribution to ASML's D&E roadmap was crucial for success. As a BPA Maurice helped us to translate our business needs into IT supported solutions, thanks!

Guido D.

I worked together with Maurice on different IT projects within ASML. Maurice had good technical knowledge, and was not afraid to ask for real use cases from end-users. Formal and informal contact was easy and smooth. Maurice did not hesitate to go the extra mile to make the customer happy. He was able to act as a translator between user and supplier. Working with Maurice was efficient and pleasant.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Quick Response Manufacturing
    QRM Management Center
    Jan, 2017
    - Oct, 2024
  • ECM master (enterprise content management)
    AIIM

Experience

    • Netherlands
    • Industrial Machinery Manufacturing
    • 400 - 500 Employee
    • Realization Project Manager
      • Jun 2022 - Present

    • Sr NPI Engineer
      • Oct 2019 - Jun 2022

  • Original Concepts
    • Veldhoven, The Netherlands
    • Owner
      • Feb 2006 - Present

      Mechatronic projects, architecture, design, coding and prototyping. Key Achievements/expertise - Cryogenic micro controlled pump and valve. Design and prototyping - Cryogenic pump long life design. Approximate 200 produced, proven MTBT of +50.000 hrs. - Design and prototyping of Laboratory measurement systems (ASTM norms) - Embedded software (C, C++, Qt5 )for MicroControllers or headless systems - Misc IoT projects - 3D design / 3D printing - Machining (verspanen) Show less

    • Netherlands
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • NPI Manager
      • Jul 2018 - Jul 2019

      Responsible for setting up a new department with staff, R4V creation process, planning and work guidelines. We produce a variety of Automotive industrial chargers ranging from 25 to 600kW. NPI in liaison with our customer aligning the development of new products resulting in a functional prototype followed by a first system delivering the production and pricing information. ​Finetuning the production information in a zero-serie, ready for volume production in a lean production street. As our customer operates in a new market where a fast introduction time is essential, the daily challenge is to stick to the processes to guarantee quality but also keeping the NPI department flexible to cope with unplanned new developments. 95% of the 20+ projects within budget and delivered on time. Show less

    • Netherlands
    • Semiconductor Manufacturing
    • 700 & Above Employee
    • Business Process Analyst
      • 2001 - Mar 2018

      Responsible for optimizing software and business processes for the Development, Manufacturing and Customer support divisions. Key Achievements - Introduced SAP/NX -Team Center Interface at Mechanical Development department - Introduced SAP Engineering Change Management (ECM) for the manufacturing and mechanical department - Co-created the ECM process, blueprint, organized brown paper sessions. This resulted in an ECM manual including many detailed steps and RACI matrix. Users approximately 1000-3000 staff. In use for more than 10 years now - Co-created the business processes (As-Is and To-Be) for the work instructions for Manufacturing, Industrial Engineering and Customer support. Made blueprint for the various SAP interfaces. Took part in the implementation as team member. The new work instruction system was delivered in phases. Cost of the project's first four phases €1.6M , users 4000+, 20000+ work instructions, implementation timespan 4 years - Various improvement projects, from blueprint to implementation - Next to the project participation, responsible for the changes on the Work Instruction software. From specification to the implementation including release management. Show less

    • Sr. Product Lifecycle Management Consultant
      • 1999 - 2001

      Created new business processes for customers based on the SAP Product Life Cycle software, and implemented it as part of a bigger project. Motherwell had developed a business model for MKB discrete manufacturers which was used as a base for projects. Key Achievements - Betonson: adapting the documentation- and engineering change process and customizing the SAP modules accordingly - Hoogovens: created a blueprint for the legacy documentation (over 1 million drawings) - Te Strake: created a blueprint for the documentation- and engineering change process. Implementation of the blueprint (as a team member) for the documentation and EC process, BoM/Routing, including training of staff (project budget €1.2M). - Developed the AutoCAD/SAP interface for a project team (Stork Boxmeer) - Various Sales sessions on Customer site Show less

  • Protector Alsafe UK
    • Aldershot/Skelmersdale UK
    • Project Manager design and manufacturing of safety equipment
      • Dec 1996 - 1999

      Responsible for a new generation of Powered Respirators, from specification, to the first production batch. Project cost £350k , duration 2.5yrs Key Achievements - Obtained ISO, FDA, FAA certification, including approval for Explosion and Hazardous environments - Time to market according to planning (3 yrs) - Introduced a new manufacturing production line, including test and calibration equipment - Responsible for new product manufacturing quality the first 6 months - Visit with SAAB/Volvo in Sweden resulted in a successful new product line of Spray mask Show less

    • Germany
    • Manufacturing
    • 700 & Above Employee
    • Project Manager
      • 1989 - 1996

      From 1993 responsible for a new generation of compressed air breathing apparatus (diving/fire brigade). Transferred part of the development to the production facility in England. Using newly designed generic modules, we were able to use some assemblies in other equipment gaining a substantial cost saving of £50k/yr . Project cost £600k , duration 2.5 yrs. Products sold to date approx. 300.000 pcs. Key Achievements - Reduced the estimated development time from four years to two and a half, using a feature in the approval guidelines. Obtained four patents. - Introduced the 3D Cad in my team for rapid development of complex parts - Hands-on creation of crucial design parts - Setting up of measuring- and duration test equipment for the laboratory - Performed various FMEA's for safety analysis - Passed all audits on the project documentation, first time right. Show less

Education

  • Haagse Hogeschool/TH Rijswijk
    production automation
    1982 - 1986
  • QRM Management Center
    Alpha Specialist, Manufacturing Proces Optimization
    2017 - 2018
  • Mikrocentrum
    Green Belt, Lean Six Sigma, Design for Six Sigma
    2017 - 2018

Community

You need to have a working account to view this content. Click here to join now