Javed Akhter

Electrical Construction Superintendent at Tecnimontarabia LTD.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
New Delhi, Delhi, India, IN
Languages
  • English -
  • Hindi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Verified International Academic Qualifications
    World Education Services
    Dec, 2021
    - Oct, 2024

Experience

    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Construction Superintendent
      • Jan 2023 - Present

    • Italy
    • Construction
    • 100 - 200 Employee
    • Electrical Engineer- Commissioning
      • May 2018 - Dec 2021

       Responsible for the monitoring of subcontractor works including issuance of project materials during installation & pre-commissioning as per ITP and Project specifications. Monitoring the activities of subcontractors to ensure construction, materials and installations & testing comply with project specifications and quality control criteria Review of drawings for the Installation purpose and recommending the solution for any discrepancy observed.  Responsible for inspection of cable laying and termination of low and high voltage cables, installation of all electrical equipment, step-down transformers and switchgears, motors and motor control centers, UPS and battery systems, panel boards, emergency generator, grounding and lighting systems, conduits, cable trays, cable duct banks and trenches, etc. Daily site surveillance to check the construction works and give comments if necessary, according to standards. Preparation, review, updating and distribution of the ITP, MS and QCP Preparation of TRA for the client approval prior to start of Installation Preparation of punch list, Surveillance report and test report as per client requirements. Witness of electrical test such as insulation resistance test and High Pot Test for Power Cables and other test for Switchgear & control gears, Transformer, Motors, Generator, Lighting & Power Panels, etc. Prepare and submitted all documents for final acceptance prior to commissioning Preparation of documents and acquiring acceptance from client for any inspection carried out and mechanical completion reports Responsible for the monitoring of all installation and pre-commissioning inspection of power and control, Functional test of all electrical equipment (Like. MCC, Transformer, Motors, and UPS. etc)  Preparations of proper documentation packages and ensure all electrical installation complies to client standards and specifications. Show less

    • Electrical Engineer
      • May 2018 - Dec 2021

    • France
    • Environmental Services
    • 200 - 300 Employee
    • Construction & Commissioning Engineer
      • Oct 2014 - Apr 2018

      Precommissionng and Commissioning of Sea Water Reverse Osmosis Plant, SADARA, Jubail (KSA)  An electrical commissioning expertise with extensive knowledge of electrical MV, LV distribution systems, variety of switchgear types including protection relays (ABB, ALSTOM, SIPROTEC) and control systems  Ensuring all installations are per latest revisions IFC design drawings, specifications, standards and codes  To ensure electrical execution works are completed and turned over to commissioning for start-up in a smooth, safe and efficient manner  Excellence in recognizing & resolving problems, ramping up Precommissioning and Commissioning activities; liaising with clients & contractors and maximizing productivity  Interact with EPC Sub-contractor and client to keep commissioning management informed of system completion status  Familiar with the use of electrical softare i.e. PCM 600 for Re-Configuration of logic for assigning the new Binary Input and Outputs and Implementing the workable relay setting parameters  Logic modification, Relay parameter settings, ATS logic execution and changes as per the requirement  Working knowledge of commication protocols MODBUS SERIAL/TCP IP, establishing the communications of various devices with the IPCS /SCADA system and simulation test as per I/O list  Testing and Commissioning of various protection functions e.g. Thermal overload 49, Blocked Rotor 51LR, Over current 50/51, Earth Fault 51N, Sensitive earth fault, Negative Sequence 46 and Successive and Long Starts (66 & 48) etc. Show less

    • Construction
    • 1 - 100 Employee
    • Lead Commissioning Engineer
      • Sep 2012 - Jul 2014

      Project: Oil Tank Farm and Port Oil Loading Facilities Responsibilities:  Pre-commissioning and Commissioning of MV/LV Switchgears, MCCs etc.  Relay setting configuration in Switchgears and MCCs  Verify inter panel connections according to Schematics.  Function tests of Transformers, Switchgears and Control gears.  Loop checks for Switchgears and MCCs  Simulation of Trips and Alarms - Power Transformers to Switchgears.  Start/ Stop test for LV/MV Motors from Local Control Station or DCS.  RTD simulation tests for MV Motor winding temperature.  HIPOT test for Bus Bar, Circuit Breaker and Power Cables etc.  IR Tests for Power Transformers, LV Motors, Cables etc.  Training for Mechanical operation of Breakers and Interlocking between switchgears. Show less

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Senior Team Lead
      • Dec 2011 - Jul 2012

      Coordination for 3D Navis work modelling and creation of electrical shop drawings for Dubai International Airport, Terminal -2 Coordination for 3D Navis work modelling and creation of electrical shop drawings for Dubai International Airport, Terminal -2

    • India
    • Construction
    • 700 & Above Employee
    • Senior Electrical Engineer - Field Engineering
      • Sep 2007 - Oct 2011

       Reviews the design works and studies performed by the Engineering Consultants and ensure that they are in accordance with the technical requirements and meet the standards.  Interpret design drawings and interface with engineering office to resolve design and constructability issue.  Work with the suppliers to ensure compliance with project drawings and specifications  Evaluation of vendor technical particulars with respect to approved specifications to assist the procurement of electrical major items and bulk items.  Work with Procurement's expediting team to ensure the delivery of vendor materials to support the projects schedule.  Providing technical direction and support to the Contractors.  Prepares scope of work for EPC subcontractor contractors for the execution of jobs.  Provide technical support to Site engineers for smooth execution of projects  Review of Cable Schedule, Load List.  Implementation of Relay Settings.  Respond to vendor for technical questions and clarifications.  Technical Specifications review to cross check with Contracts requirement Provides technical assistance, coordination and liaison with other discipline engineers within the Company and other business units to acquire technical and general requirements and manage interfaces. Complete take-off from project one-line drawings, outline and specifications. Develop test procedures and assist in testing of switchgear equipment. Show less

  • Avadh Transformers (P) Ltd. (Project Div.)
    • Lucknow, Uttar Pradesh, India
    • Assistant Project Manager
      • Oct 2005 - Aug 2007

      Installation, Testing and Commissioning of 33/11 kV Electrical Power Substation, 33 kV and 11 kV Power distribution lines. Responsibilities:  Supervision for Installation, Testing and Commissioning of 33/11 kV Power Transformers and 11 kV Switchgears etc.  Monitoring the progress of project work, preparing progress reports depicting the status of ongoing work.  Preparation of substations layouts and drawings and getting approval.  Supervise & check quality of works and compliance to technical specifications.  Timely completion of works & to ensure quality and performance standards.  Assist contractors/Engineers in day to day activities.  Payment certificates preparations.  Identifying actual causes of delay which impact the completion of work and recommending remedial solutions. Liaison with Govt. Officers and arranging shut down  Survey of sites Show less

Education

  • Visveswaraiah Technological University
    Engineer’s Degree, Electrical and Electronics Engineering
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now