Muhammad Ilham A.

Process Engineer FOSI at FURUKAWA ELECTRIC GROUP
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Banten, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Japan
    • Appliances, Electrical, and Electronics Manufacturing
    • 200 - 300 Employee
    • Process Engineer FOSI
      • Apr 2023 - Present

      Delegated for PT. Furukawa Optical Solution Indonesia member of Furukawa Electric Group, produce Optical Fibre Cable with high quality. Jobdesk : 1. Create and set machines parameters used for the production process. 2. Design and procure dies and tools used in production process. 3. Lead, monitor product process and process problem. 4. Conduct improvment and process trial for new products or machines. 5. Control process and documents based on ISO 9001, 14001, 45001 Delegated for PT. Furukawa Optical Solution Indonesia member of Furukawa Electric Group, produce Optical Fibre Cable with high quality. Jobdesk : 1. Create and set machines parameters used for the production process. 2. Design and procure dies and tools used in production process. 3. Lead, monitor product process and process problem. 4. Conduct improvment and process trial for new products or machines. 5. Control process and documents based on ISO 9001, 14001, 45001

    • Indonesia
    • Telecommunications
    • 100 - 200 Employee
    • Process Engineer
      • Jul 2022 - Apr 2023

      Jobdesk : 1. Create and set machines parameters used for the production process. 2. Design and procure dies and tools used in production process. 3. Lead, monitor product process and process problem. 4. Conduct improvment and process trial for new products or machines. 5. Control process and documents based on ISO 9001, 14001, 45001 Jobdesk : 1. Create and set machines parameters used for the production process. 2. Design and procure dies and tools used in production process. 3. Lead, monitor product process and process problem. 4. Conduct improvment and process trial for new products or machines. 5. Control process and documents based on ISO 9001, 14001, 45001

    • Staff Engineering
      • Sep 2020 - Jun 2022

      Jobdesk : 1. Monitor all machines activites in plant. 2. Make schedule maintanance of all machines. 3. Research and develop products. 4. Coordination with the production department to imporove the plant productivity. 5. Programming CNC machine. 6. Drawing machines or products with 2D/3D software. 7. Analys production & assembling of bike, E- bike and E - motor. Jobdesk : 1. Monitor all machines activites in plant. 2. Make schedule maintanance of all machines. 3. Research and develop products. 4. Coordination with the production department to imporove the plant productivity. 5. Programming CNC machine. 6. Drawing machines or products with 2D/3D software. 7. Analys production & assembling of bike, E- bike and E - motor.

    • Indonesia
    • Professional Services
    • 700 & Above Employee
    • Research Internship
      • Oct 2019 - Nov 2019

      Final Project Research with topic "Performance of Gas Turbine Cooling System (Radiator) at PLTGU XYZ against Environmental Air Temperature" Jobdesk : 1. Analys the effectivity of gas turbine cooling system in plant. 2. Analys the comparison of gas turbine cooling system effectivity in previous years with time of research. 3. Analys the factors that decrease effectivity of gas turbine cooling system. 4. Give improvments to the company to keep the system more better than before. Final Project Research with topic "Performance of Gas Turbine Cooling System (Radiator) at PLTGU XYZ against Environmental Air Temperature" Jobdesk : 1. Analys the effectivity of gas turbine cooling system in plant. 2. Analys the comparison of gas turbine cooling system effectivity in previous years with time of research. 3. Analys the factors that decrease effectivity of gas turbine cooling system. 4. Give improvments to the company to keep the system more better than before.

    • Indonesia
    • Professional Services
    • 700 & Above Employee
    • Student Internship
      • Jan 2019 - Feb 2019

      Practical Work with the Title "Maintenance of the Sea Water Supply System at PT. PJB UP. Muara Karang Block 1" Jobdesk : 1. Maintanance al machines in the plant. Ex : Heat Exchanger, pump, turbine, boiler and generator 2. Make schedule maintanance of all machines in the plant. Ex : Preventive maintanance, corrective maintanance and overhaul 3. Analys all system in the plant related about engineering improvment. 4. Make coorperate with vendors in the process of procures the machines and spareparts. Show less

Education

  • Universitas Mercu Buana
    Magister Teknik (M.T.), Teknik Mesin
    2022 - 2023
  • Universitas Sultan Ageng Tirtayasa
    Sarjana, Teknik Mesin
    2016 - 2020

Community

You need to have a working account to view this content. Click here to join now