Callum Bradley

Project Engineer at Coleman Rail
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Brisbane Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Sean Parsons

My first experience with Callum was midway through our studies at Queensland University of Technology having found ourselves in the same group for a course project. Having never worked with Callum before I wasn't sure what to expect however I quickly came to realise his level of effort and attention to detail with each piece of work he submitted to the group. Working in a group involves a certain level of trust and commitment to ensure a desired level of quality is maintained and submission deadlines met. Not once did I doubt Callums work ethic and commitment to completing his studies and becoming a Civil Engineer. I believe he would be a valuable asset to any company and I look forward to following his progression from student to professional.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 200 - 300 Employee
    • Project Engineer
      • Jul 2022 - Present

    • Spain
    • Utilities
    • 700 & Above Employee
    • Project Engineer
      • Dec 2020 - Jul 2022

      Rookwood Weir Project Alliance pre-mobilisation:- Scope of works and Schedule of rates creation for market pricing- Vendor letting approvals and pre-contract discussions- Procurement of site mobilisation itemsCompletion of tender submissions:- Inland Rail, Gowrie to Kagaru PPP, on behalf of Coleman Rail- Murray Basin Rail Project, on behalf of Coleman Rail- Melbourne Airport Rail, on behalf of Coleman Rail Rookwood Weir Project Alliance pre-mobilisation:- Scope of works and Schedule of rates creation for market pricing- Vendor letting approvals and pre-contract discussions- Procurement of site mobilisation itemsCompletion of tender submissions:- Inland Rail, Gowrie to Kagaru PPP, on behalf of Coleman Rail- Murray Basin Rail Project, on behalf of Coleman Rail- Melbourne Airport Rail, on behalf of Coleman Rail

    • Australia
    • Real Estate
    • 700 & Above Employee
    • Project Engineer
      • Mar 2020 - Dec 2020

    • Project Engineer
      • Oct 2019 - Mar 2020

      Department of Planning, Transport & InfrastructureGawler Rail Electrification ProjectProject Engineer in the construction team as part of the $615 million electrification and modernisation of the Gawler rail line in Adelaide. Works involved the installation of 42km worth of overhead wiring structures, foundations, wiring & maintenance track of of a double railway track running from Adelaide CBD station to Gawler for the Department of Planning & Infrastructure along with ARTC. • Commencement procurement & fabrication of structural steel elements;• Preliminary cost and production forecasting for the upcoming erection of structural steel;• ITP, SWMS & CWMS creation and integration;• Creation & issue of a subcontract package for the maintence trackworks scope;• Complete offsite quality control audits with the independent construction verifier;• Provide guidance on initial construction staging.

    • Site Engineer
      • Jun 2019 - Oct 2019

      Australian Government - Department of DefenceAIR7000 Civil Package 5bSite Engineer in the construction team to provide preliminary support to the South Australian Engineering Business for the Civil Work Package 5B of the AIR7000 project for the upgrade of the main apron for increased flexural strength at the Royal Australian Air Force Base in Edinburgh, Adelaide.• Development of Construction Work Method Statement (CWMS) for the drainage system;• Development of Construction Work Method Statement (CWMS) for electrical conduit supply;• Lifting/Crane methodology including cost plan development & third party lifting certification;• Preliminary Crane Pad design and approval, along with subcontractor rates assessment, productivity tracking and cost monitoring;• Safe Work Method Statement (SWMS) creation with respect to cranage, electrical conduit installation & stormwater & drainage infrastructure;• Complete pre-pour inspection of precast elements to ensure sub-contractor self performance along with project quality control documentation.

    • Site Engineer
      • Feb 2019 - Oct 2019

      Kingsgate Head OfficeGateway Upgrade NorthSite Engineer within the management team assisting in variation pricing, progress claims along with provisional sum works. Works involved:• Assist the commercial manager with close out of variations, progress claims and PUP’s with respect to the Gateway Upgrade North Project;• Assist the commercial team with close out of provisional sum works and perusing payment from the client for works completed;• Aid the Project Director with various provisional sum works with respect to costing and cost build up for works completed for client discussion.

    • Site Engineer
      • Sep 2018 - Feb 2019

      Department of Transport & Main Roads along with Transurban Gateway Upgrade North • Manage the sub contract works of pipe repairs for drainage lines in where internal cracking was present via fibreglass patching;• Assist the current team in the management and execution of defect rectification works with respect to nominated existing structures;• Track cost’s associated with the above mentioned works;• Program out works to completion and identify critical path of works. Provide a 3 week look ahead for liaison with traffic team along with senior management due a magnitude of works being completed under traffic control and timely constraints being in place;• Integrate with other disciplines (structures, earth works, asphalt, line marking etc) to ensure little down time for all construction crews.

    • Site Engineer
      • Jun 2018 - Sep 2018

      Kings Gate Head Office Cross River RailSite Engineer within the construction team assisting the Senior Design Manager of Rail for various tender designs and submissions.Responsibilities• Assist in preliminary design and interface with designers for tender submission;• Identification of derogations and departures to that of project and client technical requirements;• Assist the estimators in cost plan estimates;• Assist the transport planner in operational modelling;• Assist the construction team by providing Time & Chainage diagrams, as well as provide advice on construction staging.

    • Australia
    • Construction
    • 200 - 300 Employee
    • Site Engineer
      • May 2018 - Jun 2018

      Transport for New South Wales - Sydney Light Rail Project. Secondment to Acciona Australia. Manage the rectification works in Randwick (Zone R) as part of practical completion.Works involved:• Hydroblasting concrete pedestrian crossings for black oxide concrete replacement;• Checking of blocked conduits from Axle counters, loops & point motor drainage;• Assist in various concrete pours of both single and dual track slabs.

    • Site Engineer
      • Aug 2017 - May 2018

      V/Line - Murray Basin Rail ProjectSite Engineer for the Murray Basin Rail Project in Victoria, Australia as part of the $440 million track maintenance works. Works involved completing gauge standardisation to convert the existing broad-gauge track to standard gauge whilst also increasing axle load bearing capacity and forming continuously welded rail. Responsibilities:• Oversee and manage works of free & destress welding, turnout regauging, tie replacement, ballasting;• Successful management of destressing works for 256km’s of track from Dunolly to Mildura;• Management of onsite costs;• Monitoring of construction progress;• Dealing with an increased scope of works (60% increase to that of originally specified);• Coordinationor of client/contractor site walk-downs to establish quality, scope, snagging (punch) lists;• Mentoring and training of undergraduate engineers with regards to quality, costing and technical works for rail construction & maintenance processes.

    • Graduate Site Engineer
      • Mar 2017 - Aug 2017

      Goldlinq - Gold Coast Light Rail Stage 2Graduate Site Engineer for the delivery of the ballasted track construction as part of a $420 million, 7.3km new track package to join Helensvale heavy rail to the existing stage 1 light rail at the Gold Coast University Hospital. Responsibilities:• Provide technical support to ballasted track construction by the generation of work packs,l along with Inspection Test Plans;• Resource procurement (international and national) through the use of requisitions & purchase orders; • Weekly programming and 3 week look ahead review for constructability sequencing and supply lead times;• Development and submission of RFI's with regards to design;• Management and submission of quality assurance documentation for the purpose of lot completion and as part of substantial and practical completion;• Participating on site walk downs, handover walks with client along with independent verifiers;• Scheduled supply and delivery of ballast for the entirety of stage 2 works;• Daily on site cost tracking and budget management for the works as well as assisting in monthly reviews and reporting.

    • Australia
    • Truck Transportation
    • 700 & Above Employee
    • Undergraduate Engineer
      • May 2015 - Sep 2015

      Undergraduate Engineer for Queensland Rail design office as part of practical placement for completion of a graduate degree:Tasks included:• Basic AutoCAD drafting of bridge abutments for bridge replacement program;• Site Inspections for Culvert Rehabilitation works;• Preliminary costing and qty take off's;• Client & contractor liaison for upcoming works for track maintenance using tampers and ballast regulators;• Preliminary ordering and quantifying of sleepers for tie replacement maintenance works.

Education

  • QUT (Queensland University of Technology)
    Bachelor's Degree, Civil Engineering, Dual Major - Civil Construction & Civil Infrastructure
    2011 - 2015
  • Forest Lake College
    High School, Full Academic Course Load
    2002 - 2007

Community

You need to have a working account to view this content. Click here to join now