Ahmed Gheni
Faculty Member at Komar University of Science and Technology- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Arabic Native or bilingual proficiency
Topline Score
Bio
Experience
-
Komar University of Science and Technology
-
Iraq
-
Higher Education
-
100 - 200 Employee
-
Faculty Member
-
Sep 2019 - Present
-
-
-
Missouri University of Science and Technology
-
United States
-
Higher Education
-
700 & Above Employee
-
Postdoctoral Research Fellow
-
Oct 2018 - Aug 2022
-
-
Ph.D. Candidate
-
Jul 2013 - Oct 2018
-
-
-
Chi Epsilon International
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
Vice President
-
Dec 2015 - Jun 2016
As the vice president, I have invited and coordinated speakers for Chi Epsilon biweekly meetings.The invited speakers were from different sectors in the civil engineering filed to share their experienceand give a solid career advice to Chi epsilon members.
-
-
Social Chair
-
Jun 2015 - Dec 2015
-
-
-
-
Graduate and Honor Chair
-
Dec 2015 - Jun 2016
-
-
-
-
Scholarships Chair
-
Nov 2015 - May 2016
-
-
-
-
Design and Consulting Engineer
-
Jan 2011 - May 2012
• Quality control, structural design checking, in site nondestructive tests, structures assessments and strengthening for the new and old building of the university • Total cost of projects: 25 million USD • Quality control, structural design checking, in site nondestructive tests, structures assessments and strengthening for the new and old building of the university • Total cost of projects: 25 million USD
-
-
-
-
Design and Consulting Engineer
-
Feb 2007 - Dec 2010
• Team member who participated in the hydrological studies, digital scanning and volumetric calculations for the proposed locations for the establishment of Tel Ksiba and Hamrin earth dams in Salah Uddin, IraqTeam size: 12 engineer, project cost: 12 million USD • Team member who participated in the hydrological studies, digital scanning and volumetric calculations for the Erbil dam site, Team size:12 engineer, project cost:6 million USD• Executed the implementation of designs and drawings for the pharmaceutical laboratory Samarra Team size:3 engineer, project cost:200,000 USD• Designed concrete mixes using special admixtures and new types of aggregate (lightweight aerated aggregate).• Supervision, work drawings and quality control for the Department of Education new building project in Tikrit, Iraq. A 3-story building with 29062 ft2 total area. Team size:4 engineer, project cost:2.5 million USD• Site manager of Salah Uddin Stadium Project. Installing new certified soccer grass with its Irrigation, filtration and drainage network , Team size:4 engineer and 15 special technician , project cost:1.2 million USD• Vibrations testing for structures under impact loads
-
-
-
-
Site Manager
-
Aug 2003 - Jan 2007
• Rehabilitation of Dhuluiya Water Project in collaboration with the Engineering Brigade. Supplying and installing new sedimentation tanks, new pumps and new Sterilizing system. Team size:23 engineers and technicians, project cost:0.4 million USD• Supervised the installation of Fort Rayash water complex in collaboration with the Engineering Brigade 1st ID. Renewing the sand filtering system, new intake line new pumps, and new Sterilizing system. Team size: 26 engineers and technicians, project cost: 0.8 million USD.• Rehabilitation of Tuz Water Project in collaboration with the Engineering Brigade 4th ID. Supplying and installing new sedimentation tanks, new pumps and new Sterilizing system. Team size: 23 engineers and technicians, project cost: 0.7 million USD.• Completed reports of the annual budget of the company and work schedules progress. budget supervise: 4.5 million USD
-
-
-
-
Site Engineer
-
Jul 2000 - Jul 2003
• Monitored and supervised the project of establishing a new law school building. It is a new complex consist of three main buildings with other small service storages and the site works. Team size: 43 engineers and technicians, project cost: 0.4 million USD. • Monitored and supervised the constructions of dairy plant and plant food project, which consist of a refrigerated storage and central boiler services building. Team size: 13 engineers and technicians, project cost: 0.4 million USD. • Provided reports of projects progress. budget supervise: 1.5 million USD for three years
-
-
Education
-
Missouri University of Science and Technology
Doctor of Philosophy (Ph.D.), Civil Engineering -
University of Tikrit
Master of Science (MSc), Structural Engineering