Experience
-
Denison Gas Limited
-
Australia
-
Oil and Gas
-
1 - 100 Employee
-
Project Manager
-
Jun 2022 - Present
-
-
-
Arrow Energy
-
Australia
-
Oil and Gas
-
500 - 600 Employee
-
Project Lead
-
Jan 2019 - Jun 2022
Project Manager leading the scoping, planning and execution of a $30M upgrade to an existing 12ML/d water treatment plant to increase the design life of 10 years, increase reliability and availability and return the facility back to design capacity. The project also included the design, procurement, installation and commissioning of a secondary brine treatment package which was integrated into the existing facility to minimise waste from the water treatment process. - Scoping of independent… Show more Project Manager leading the scoping, planning and execution of a $30M upgrade to an existing 12ML/d water treatment plant to increase the design life of 10 years, increase reliability and availability and return the facility back to design capacity. The project also included the design, procurement, installation and commissioning of a secondary brine treatment package which was integrated into the existing facility to minimise waste from the water treatment process. - Scoping of independent condition assessment survey to understand scope required to meet the project objectives and communicate to internal stakeholders - Stakeholder engagement and alignment to agree EPC contract strategy - Management of the Engineering Contractor to complete the Detailed Design to the agreed budget and schedule, including the coordination and participation of design reviews, HAZOP’s/LOPA’s, risk assessments, SIMOPS and constructability reviews, 3D model reviews, and procurement planning and construction scope review - Tender, negotiation and award of secondary brine treatment plant, and management of Package Engineer to overseer the design, fabrication and installation of the packaged equipment - Sourcing strategy approvals, market engagement and management of tender and negotiation process for the Execution contract - Management of the Construction Contractor in the execution of procurement including new reverse osmosis water processing equipment, shutdown planning, SIMOPS, completions management, walkdowns and handover process - Stakeholder management throughout the construction and extended shutdown period to manage Operations water inventory - Ongoing management of project cost and schedule, constructability workshops, risk assessments and progressive lessons learned to ensure the project was completed safety within the agreed budget and timeframes, and the project objectives were met -Completion of 60,000 man hours incident free including a Loss Time Injury (LTI) frequency of 0
-
-
Senior Project Engineer
-
Jan 2017 - Dec 2018
Tipton Expansion Project Senior Project Engineer supporting the On-Plot Lead for $410M Brownfield expansion project, increasing existing compression facilities from 33TJ/d to 80TJ/d gas production. • Contractor management of Engineering Design Contractor for the completion of the Front End Engineering Design including review of P&ID’s, coordination and participation in HAZOP’s/LOPA’s, risk assessments, SIMOPS and constructability reviews, 3D model reviews, and procurement planning and… Show more Tipton Expansion Project Senior Project Engineer supporting the On-Plot Lead for $410M Brownfield expansion project, increasing existing compression facilities from 33TJ/d to 80TJ/d gas production. • Contractor management of Engineering Design Contractor for the completion of the Front End Engineering Design including review of P&ID’s, coordination and participation in HAZOP’s/LOPA’s, risk assessments, SIMOPS and constructability reviews, 3D model reviews, and procurement planning and scope review • Pre-FID execution readiness activities including Contractor management of the Engineering Detail Design, conducting and coordinating document reviews, input of vender data, participating in all workshops and risk assessments, coordinating technical quires, request for information, deviations with Technical Authorities and engineering team • Leading the reciprocating compressor package design completion with international compressor Package Company, managing both cost and schedule and involvement in design workshops including design reviews, HAZOP/LOPA, and 3D model reviews. • Coordinating the tendering process of the screw compressor and reciprocating compressor fabrication based on the completed engineering design packages. Contract negotiations and facilities QA/QC inspections. • Supporting the Construction Manager through the scoping and tendering process of the On-plot facilities Construction Contractor
-
-
-
Arrow Energy
-
Australia
-
Oil and Gas
-
500 - 600 Employee
-
Project Engineer - Daandine Expansion Project
-
Apr 2012 - Apr 2016
Lead Compression Facilities Project Engineer for $250M Brownfield expansion project. Management of design, construction, installation and commissioning of three 12 TJ/d reciprocating gas compressors, TEG dehydration system, low pressure Flare, high pressure vent, inlet separation and utility and controls system upgrades. • Contractor management of Concept Select phase of the project, budget and schedule development, multi-criteria analysis and liaising with internal stakeholders to frame… Show more Lead Compression Facilities Project Engineer for $250M Brownfield expansion project. Management of design, construction, installation and commissioning of three 12 TJ/d reciprocating gas compressors, TEG dehydration system, low pressure Flare, high pressure vent, inlet separation and utility and controls system upgrades. • Contractor management of Concept Select phase of the project, budget and schedule development, multi-criteria analysis and liaising with internal stakeholders to frame project • Front End Engineering Design including review of P&ID’s, coordination and participation in HAZOP’s/LOPA’s, risk assessments, SIMOPS and constructability reviews, 3D model reviews, Long Lead Item scopes review and award of packages. Development of schedule and budget for successful Final Investment Decision (FID) • Contractor management of the EPCM throughout Detail Design and construction, conducting and coordinating document reviews, participating in all workshops and risk assessments, supporting onsite activities and shutdown planning • Coordinating technical quires, request for information, deviations with Technical Authorities and engineering team • Review and signoff of quality documentation, and completions certificates throughout construction • Involved in procurement sourcing from China, Malaysia and Australia. Closely involved in compressor package design reviews, package layout and coordination with Operations/Maintenance personnel. - In country coordination and project management activities - QA/QC inspections - Involvement in Factory Acceptance Testing of compressor packages • Review of commissioning procedures and involvement in risk assessments, commissioning activities, Site Acceptance Testing and handover
-
-
Project Engineer - Tipton Water Treament Facility Project
-
Apr 2011 - Apr 2012
Project Engineer managing the design and construction of four lined dams including a 400ML Feed Dam, 400ML Produced Water Dam, 1000ML Brine Dam and 50ML Utility Dam. • Liaising with the designer, Operations and Engineering to complete design, and manage technical queries, requests for information and variations throughout construction • Successfully managed civil contractor to execute construction incident free • Onsite support and supervision of earthworks activities… Show more Project Engineer managing the design and construction of four lined dams including a 400ML Feed Dam, 400ML Produced Water Dam, 1000ML Brine Dam and 50ML Utility Dam. • Liaising with the designer, Operations and Engineering to complete design, and manage technical queries, requests for information and variations throughout construction • Successfully managed civil contractor to execute construction incident free • Onsite support and supervision of earthworks activities, surface preparation and installation of multiple layer liners and leak detection system • Environmental Erosion Sediment Control management of construction site and dam walls
-
-
-
TEAM, Inc. UK
-
United Kingdom
-
Engineering Services
-
100 - 200 Employee
-
Mechanical Engineer
-
Jul 2008 - Apr 2011
• Providing engineering support, design and documentation for all services and products to clients and staff • Monitoring incoming work from technical enquiries, organising site visits, design and quotation of products, the manufacturing process, and providing the client with a service in a timely manor • Design of temporary and permanent leak seal enclosures for a variety of industries. • Knowledge in online leak sealing, hot tapping and pipe freezing, composite wraps… Show more • Providing engineering support, design and documentation for all services and products to clients and staff • Monitoring incoming work from technical enquiries, organising site visits, design and quotation of products, the manufacturing process, and providing the client with a service in a timely manor • Design of temporary and permanent leak seal enclosures for a variety of industries. • Knowledge in online leak sealing, hot tapping and pipe freezing, composite wraps, controlled bolting, online safety valve testing (Trevitesting), heat treatment and onsite machining. • “East Region” engineer looking after work on a range of sites in NSW, QLD, NT and PNG. Providing engineering support to the rest of Australia and New Zealand on a regular basis when required. • Site work on a range of sites including oil refineries, LNG gas plants, CSG compressor stations, smelters, power stations, chemical plants, paper mills, cement works. • Involved in many shutdowns including Mobil Altona, Caltex Kurnell, Santos CS2, ConocoPhillips LNG Darwin. • Furmanite QA/QC Manager for the ConocoPhillips 2010 shutdown managing all bolting calculations, shutdown broken joint tagging system and updating the broken joint register, resulting in a leak free start up. Show less • Providing engineering support, design and documentation for all services and products to clients and staff • Monitoring incoming work from technical enquiries, organising site visits, design and quotation of products, the manufacturing process, and providing the client with a service in a timely manor • Design of temporary and permanent leak seal enclosures for a variety of industries. • Knowledge in online leak sealing, hot tapping and pipe freezing, composite wraps… Show more • Providing engineering support, design and documentation for all services and products to clients and staff • Monitoring incoming work from technical enquiries, organising site visits, design and quotation of products, the manufacturing process, and providing the client with a service in a timely manor • Design of temporary and permanent leak seal enclosures for a variety of industries. • Knowledge in online leak sealing, hot tapping and pipe freezing, composite wraps, controlled bolting, online safety valve testing (Trevitesting), heat treatment and onsite machining. • “East Region” engineer looking after work on a range of sites in NSW, QLD, NT and PNG. Providing engineering support to the rest of Australia and New Zealand on a regular basis when required. • Site work on a range of sites including oil refineries, LNG gas plants, CSG compressor stations, smelters, power stations, chemical plants, paper mills, cement works. • Involved in many shutdowns including Mobil Altona, Caltex Kurnell, Santos CS2, ConocoPhillips LNG Darwin. • Furmanite QA/QC Manager for the ConocoPhillips 2010 shutdown managing all bolting calculations, shutdown broken joint tagging system and updating the broken joint register, resulting in a leak free start up. Show less
-
-
-
-
Vacation Work Experience
-
Nov 2006 - Feb 2007
• Part of the Furnace 3 Reline Project Team • Conceptual design and manufacture of skimmer cleaner prototype • Assisted in the design process of casting machine • Field measurements and heat transfer calculations for water cooling the furnace • Part of the Furnace 3 Reline Project Team • Conceptual design and manufacture of skimmer cleaner prototype • Assisted in the design process of casting machine • Field measurements and heat transfer calculations for water cooling the furnace
-
-