Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Abilitazione all’esercizio della professione di Ingegnere Civile
    Università degli Studi di Cassino e del Lazio Meridionale
    Oct, 2013
    - Nov, 2024
  • European Computer Driving Licence ( ECDL)
    Scuola di Formazione Snc, Frosinone (FR)
    May, 2011
    - Nov, 2024

Experience

    • Italy
    • Truck Transportation
    • 700 & Above Employee
    • Project Manager
      • Nov 2020 - Present

      - Responsabile Unico del Procedimento di appalti pubblici di lavori, servizi e forniture; - Supervisione del processo di pianificazione, affidamento e realizzazione degli interventi finalizzati alla manutenzione dell'infrastruttura autostradale; - Verifica e validazione della progettazione; - Predisposizione della documentazione tecnica necessaria all’espletamento delle procedure di gara; - Gestione tecnico-amministrativa di contratti e subcontratti; - Verifica ed autorizzazione dei subappalti; - Supervisione delle imprese e coordinamento della Direzione Lavori nella fase di realizzazione degli interventi assicurando il rispetto di tempi, costi e qualità; - Approvazione della contabilità lavori e rilascio dei certificati di pagamento. - Analisi e approvazione delle perizie di variante tecniche e contabili; - Gestione contrattuale delle riserve; Supporto all’ufficio contratti nella stesura di transazioni e accordi bonari; - Gestione degli adempimenti in materia di tutela ambientale e di sicurezza; - Espletamento dell’attività di permitting verso gli Enti e le Pubbliche Amministrazioni per il rilascio delle autorizzazioni e la risoluzione delle interferenze; - Monitoraggio dello stato di avanzamento delle commesse mediante l’elaborazione dei KPI’s; Analisi degli scostamenti e definizione delle strategie di rientro; Show less

    • Italy
    • Construction
    • 700 & Above Employee
    • Deputy Construction Manager
      • Apr 2019 - Nov 2020

      Ligne 16 lot 2 du Grand Paris Express The Grand Paris Express is a public transport network project made up of four automatic metro lines around Paris, and the extension of two existing lines. With a total length of 200 kilometres and 60 new stations. Line 16 lot 2 runs over a length of 11.1 km of tunnel, between Aulnay-sous-Bois and Chelles. Entirely underground, it mainly crosses dense urban areas and, in the town of Sevran, includes two passages under the RER-B SNCF tracks and one passage under the Ourcq channel. It consists of 4 stations and 12 ancillary structures. Deputy Construction Manager - Contractual and operational management of subcontractors; - Analysis of Employer’s requirements, budget verification and drafting of technical specifications for the subcontracts relating to civil works such as: formworks, scaffolding, ventilation system, dewatering system, etc. Comparison and technical analysis of the offers in support of the Procurement department; - Drafting of responsibility matrices related to the subcontracts; - Follow up of the budget of blue collars site staff in assistance to the Project Manager; - Drafting of Civil work General Method Statements in collaboration with the Technical department and QHSE department; - Responsible for the transversal subjects of the project as regards the management and planning of materials. - Management of subcontractors as regards: concrete, formwork, reinforcement, waterproofing, topography. Elaboration of concrete and formwork forecast. - Site management of works related to the construction of deep foundations of an Underground Station and a Ventilation and Emergency Exit shaft. - Progress reporting of works according to the Lean Management System; Show less

    • Italy
    • Construction
    • 700 & Above Employee
    • Site Manager
      • Jun 2015 - Apr 2019

      The “Red Line North Underground”, together with a further 3 metro lines, forms part of the project to build the new infrastructural mobility system promoted by Qatar under the scope of the National Development Plan for 2030 Vision.The project involves the excavation of two parallel tunnels, one in each direction, approximately 11.6 km long with an internal diameter of approximately 6.17 m and 7 underground stations.Assistant Construction Manager / Site Manager- Assisting the Contraction Manager in Planning/monitoring and leading the activities for the construction of 7 stations, 3 emergency exits and 4 underpasses;- Site management in terms of Safety, Quality, Production. Planning and organization of the site activities. Coordination with the technical office to solve issues related to drawing interpretation, field changes, sequence of works, quality non-conformance;- Responsible of the main Project formwork supplier from the technical, operational and logistic point of view. Interface with the supplier during the design phase, definition of bill of quantities, schedule of deliveries, off hire, buy back. Planning of Formworks forecasts for the sites;- Managing of subcontract works in terms of, drawing analysis, purchase order of material and machinery required, drafting the detail program for the works and following the activities on sites; - Interface with the PMC construction Manager and Director on site and during the technical/construction meetings, including quality focus meetings and safety assessments.- Coordinator of civil works and passive protection systems in the certification process of the stations by the "Civil defence". Responsible for the delivery process to the client and the operator of the railway network for the assigned section of project Show less

    • Management Development Trainee
      • Mar 2015 - Jun 2015

      Etihad Rail Project – Stage 2 JV partners Samsung C&T and Tristar Engineering & Construction for the Design and Built of Packages C & F. The Stage 2 consists in the design and build of 628 km connecting the main UAE ports of Khalifa and Jebel Ali with the Saudi and Omani borders as part of the development of the GCC (Gulf Confederation Council), rail network. The planned GCC railway will link Kuwait, traversing along the Gulf, to Oman, serving the Kingdom of Saudi Arabia, the Kingdom of Bahrain, the State of Qatar and the United Arab Emirates, for a total length of 2,177 kilometres.Technical and Planning Engineer- Studies and analysis of rail structures underbridge, overbridge, underpass;- Checking of rail structures BOQ and drafting of Method Statements;- Study of Etihad rail programs and drafting of underbridges structure typical baseline program;- Analysis of productivity ratios. Show less

Education

  • Politecnico di Milano
    Master di II Livello, Project Management delle Opere Strutturali e Infrastrutturali
    2013 - 2015
  • Università degli Studi di Cassino e del Lazio Meridionale
    Laura Magistrale, Ingegneria civile
    2010 - 2013
  • Università degli Studi di Cassino e del Lazio Meridionale
    Laurea Triennale, Ingegneria civile
    2006 - 2009
  • Liceo Scientifico "G.Pellecchia" Cassino
    100
    2001 - 2006

Community

You need to have a working account to view this content. Click here to join now