Maru Talavera Díaz

Transformation Director at Helexia France
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lille, Hauts-de-France, France, FR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • France
    • Business Consulting and Services
    • 1 - 100 Employee
    • Transformation Director
      • Oct 2022 - Present

      Lille, Hauts-de-France, France

    • Project Management Officer
      • Apr 2022 - Oct 2022

      Lille, Hauts-de-France, France

    • France
    • Human Resources Services
    • 1 - 100 Employee
    • Volunteer - Active Member
      • Jan 2022 - Mar 2022

      Lille, Hauts-de-France, France Grain de Moutarde is a collective of highly qualified individuals in professional transition. All members are co-leaders in the group with an spirit of sharing, mutual aid and collective intelligence. “Alone we go fast, together we go far”

    • United States
    • Design Services
    • 400 - 500 Employee
    • Associate Principal
      • Aug 2017 - Nov 2019

      Oakland, California I joined IG as a senior manager with a dual mandate: build and develop the company first PMO and its PM practices, and manage complex, large-scale green and NetZero commercial and residential projects. As a project manager I managed the design an implementation of the MEP and PV systems for multiple large-scale office, commercial and residential developments. I lead the engineering teams throughout every level of engineering from schematic design to commissioning. I drove projects… Show more I joined IG as a senior manager with a dual mandate: build and develop the company first PMO and its PM practices, and manage complex, large-scale green and NetZero commercial and residential projects. As a project manager I managed the design an implementation of the MEP and PV systems for multiple large-scale office, commercial and residential developments. I lead the engineering teams throughout every level of engineering from schematic design to commissioning. I drove projects that use cutting edge technology to deliver an immediate local impact on the environment, producing healthy and sustainable buildings . As leader on the PMO group. I was in charge of developing and implementing the project management practices within the California offices, and improving and optimizing the existing systems and procedures to strength the company approach to successful financial management and project delivery. Show less

    • Environmental Services
    • 700 & Above Employee
    • Project Manager / Senior Project Engineer
      • Apr 2011 - Apr 2016

      San Francisco Bay Area, CA, USA - Montreal, Canada As project manager, I was responsible for executing and managing engineering design for material handling and transportation projects with focus on carbon emissions reduction and energy optimization for the Mining and Energy sectors. Engineering design ranged from conceptual level through detailed engineering. I had active involvement in design definition, value engineering, risk assessment and mitigation, procurement support, construction support and project commissioning and start up support.… Show more As project manager, I was responsible for executing and managing engineering design for material handling and transportation projects with focus on carbon emissions reduction and energy optimization for the Mining and Energy sectors. Engineering design ranged from conceptual level through detailed engineering. I had active involvement in design definition, value engineering, risk assessment and mitigation, procurement support, construction support and project commissioning and start up support. As a senior Project Engineer, Process Lead and Consultant I was responsible for the technical delivery of projects, system audits, system optimization, coordination of technical teams, acquisition and training of new talent. I had also the opportunity to build and lead a process group stationed in Montreal to penetrate the Eastern Canadian market. Show less

    • World Traveler
      • Jan 2010 - Mar 2011

      Planet Earth 15 months. 18 countries. 49 flights (172h & 67,110 miles). 334 short distance trips (taxi, horse, tuktuk, moped, etc.). 366 long distance trips (642h & 16,550 miles). 274h on boats (1,600 miles). Countless miles walked. Hundreds of people met and great connections made. One of life's best experiences. All with a small daypack.

    • Australia
    • Mining
    • 700 & Above Employee
    • Project Manager / Lead Process Engineer
      • Aug 2004 - Dec 2009

      San Francisco Bay Area / Santiago de Chile As a Functional Leader, I had the opportunity to built and nature 15+ people process team to service all Mining projects within the South American branch of the company. My technical focus as Lead Process engineer was directing the hydraulic design of short and long distance transportation projects which main objective was to optimize energy usage and reduce risk for mine products transport and reduce green house emissions; I had key role in process design decisions, system configuration… Show more As a Functional Leader, I had the opportunity to built and nature 15+ people process team to service all Mining projects within the South American branch of the company. My technical focus as Lead Process engineer was directing the hydraulic design of short and long distance transportation projects which main objective was to optimize energy usage and reduce risk for mine products transport and reduce green house emissions; I had key role in process design decisions, system configuration definition and overall project implementation. I also welcomed the opportunity to increase my Project Management responsibilities from managing small to medium size projects to lead and manage major projects . Show less

    • Assistant Project Manager
      • Jul 2003 - Jul 2004

      San Francisco Bay Area As an Assistant Project Manager my role and responsibilities included the application of standard and specialized engineering techniques, procedures, and criteria for managing the construction of water main line projects with over one million dollar of capital budget. I frequently used computer-assisted engineering software to update schedule, calculate cost and scope variances, and prepare change orders. I successfully performed value engineering studies to reduce, as a minimum goal… Show more As an Assistant Project Manager my role and responsibilities included the application of standard and specialized engineering techniques, procedures, and criteria for managing the construction of water main line projects with over one million dollar of capital budget. I frequently used computer-assisted engineering software to update schedule, calculate cost and scope variances, and prepare change orders. I successfully performed value engineering studies to reduce, as a minimum goal, an estimated 4% total cost at completion of projects. I also became proficient coordinating work with subcontractors to ensure compliance with contractual specifications. Show less

    • France
    • Utilities
    • 700 & Above Employee
    • Lead Project Engineer, Sector Valle Cuautitlan Texcoco
      • Jan 2000 - Jan 2002

      Mexico City Area, Mexico Formerly (Maxigas Natural) As a Lead Project Engineer my main responsibility was to conduct studies of expansion and growth of an existing natural gas pipeline distribution systems with a maximum capacity of 350,000 customers. I participated in the development of the master plan, which examined the supply capacity and the population growth for five, ten, twenty and thirty-year projection periods. Assisted custumers with energy conversion and energy efficiency projects. I… Show more Formerly (Maxigas Natural) As a Lead Project Engineer my main responsibility was to conduct studies of expansion and growth of an existing natural gas pipeline distribution systems with a maximum capacity of 350,000 customers. I participated in the development of the master plan, which examined the supply capacity and the population growth for five, ten, twenty and thirty-year projection periods. Assisted custumers with energy conversion and energy efficiency projects. I also, lead studies of contingencies and natural disasters on natural gas pipeline distribution systems, which resulted in the correction of the contingency operations manuals, and coordinate with contractors solving technical/design problems on site. Show less

Education

  • Universidad Nacional Autónoma de México
    Bachalor's Degree
  • University of California, Berkeley
    Certificate

Community

You need to have a working account to view this content. Click here to join now