Dhruv Pansheriya

VDC Project Engineer II at Canyon State Electric
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tempe, Arizona, United States, US
Languages
  • English Full professional proficiency
  • Hindi Native or bilingual proficiency
  • Gujarati Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • OSHA-10
    Occupational Safety and Health Administration
    Jul, 2021
    - Nov, 2024
  • Procore Certified: Student
    Procore Technologies
    Feb, 2021
    - Nov, 2024
  • Primavera P6 Enterprise Project Portfolio Management Essentials
    Project Management Institute India
    Dec, 2020
    - Nov, 2024
  • Construction Manager-In-Trainee (CMIT)
    Construction Management Association of America (CMAA)
    Dec, 2020
    - Nov, 2024

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • VDC Project Engineer II
      • Dec 2022 - Present

      • Managing prefab design, tracking production on time and the associated cost.• Attending BIM coordination meetings and leading electrical design based on the scope of work.

    • VDC Project Engineer I
      • Jan 2022 - Dec 2022

      • Producing 2D Field Installation Drawings using Revit and designing a Fire Alarm System using City code. • Model Electrical equipment and lights based on submittals over Revit and check if any clearance is required.• Run clash detection using Navisworks, maintain BIM coordination log and adjust the design for a clash-free model.• Lead foreman team to layout control points on site and validate them after placement of electrical equipment using Total Robotic Station(Autodesk Point Layout).• Capture Jobsite work using a 360-degree camera and maintain pictures on StructionSite. Also, compare them with the Naviswork 3D model for QA/ QC. Show less

    • VDC Intern
      • May 2021 - Dec 2021

      • Producing 2D Field Installation Drawings using Revit and designing a Fire Alarm System using City code. • Model Electrical equipment and lights based on submittals and check if any clearance is required.• Run clash detection using Navisworks, maintain BIM coordination log, and adjust the design for a clash-free model.• Lead foreman team to layout control points on site using Total Robotic Station.

    • United States
    • Higher Education
    • 700 & Above Employee
    • Client Services Assistant
      • Dec 2020 - May 2021

      • Addresses students’ needs by being available to answer questions or concerns about immigration rules and regulations. • Collaborates with staff to process 10,000 International students' requests and generate new processes for further review by staff. • Processes students' e-forms with the use of system application software to enable swift response to students' submissions. • Part of a CSA team that approves I20 requests for CPT, pre-OPT, Post-OPT, STEM extension, Travel Signatures, etc. Show less

    • India
    • Banking
    • 700 & Above Employee
    • Deputy Technical Manager(Property Valuation)
      • Aug 2019 - Sep 2020

      • Worked with property valuers and finalized the value of more than 150 residential, commercial and industrial properties per month by contacting brokers, referring property documents & approved building plans. • Supervised 2 co-ordinators and as a team provided valuation service on a timely basis by solving conflicts. • Visited more than 50 under-construction properties every month and calculated the amount of construction work is completed by site surveying to update the progress of construction work in the bank system. Show less

    • India
    • Construction
    • 700 & Above Employee
    • Civil Engineering Trainee
      • May 2018 - Jun 2018

      • Monitored construction work and to comply with contract plans and specifications and estimates. • Efficient reading through specifications and plans to determine the appropriate scope of work. • Supervised the team of 15 workers and analyzed, and prepared daily site progress report. • Project managerial responsibilities in effectively running time-constrained projects successfully. • Assisted with weekly safety meetings and the implementation of the safety plan. • Monitored construction work and to comply with contract plans and specifications and estimates. • Efficient reading through specifications and plans to determine the appropriate scope of work. • Supervised the team of 15 workers and analyzed, and prepared daily site progress report. • Project managerial responsibilities in effectively running time-constrained projects successfully. • Assisted with weekly safety meetings and the implementation of the safety plan.

  • Bajarang Corporation
    • Vikas Textile Market, Surat, India
    • Project Management Intern
      • Sep 2017 - Dec 2017

      • Assisted project engineer and prepared a detailed scope of service and project cost estimate report of a 700,000 sq. ft textile market by reviewing project drawings and conducting quantity take-offs. • Developed plan sheets and 3D model of the commercial project by collaborating with the contractor. • Performed financial analysis of current projects to maintain high profits and minimize any potential risks, providing solutions to a day-to-day issue on the job site along with promoting safety within employees. Show less

  • Unique Construction company
    • Surat, Gujarat, India
    • Summer Intern
      • May 2017 - Jun 2017

      • Assisted the Project Manager in updating the daily project schedule and building drawings. • Performed quantity verifications, construction crew accounting, and the specification analysis of estimating. • Assisted the Project Manager in updating the daily project schedule and building drawings. • Performed quantity verifications, construction crew accounting, and the specification analysis of estimating.

Education

  • Arizona State University
    Master of Science - MS, Construction Management
    2020 - 2021
  • Sardar Vallabhbhai National Institute of Technology, Surat
    B.tech, Civil Engineering
    2015 - 2019

Community

You need to have a working account to view this content. Click here to join now