Randy Looy, P.Eng, PMP

Plant Operator at Whitecap Resources Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
North Red Deer, Alberta, Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Robert B.

I worked directly with Randy while he was as a Senior Exploitation Engineer within the Red Deer Development Team at Penn West in 2012/2013. In this his role, he was focused on field development planning and project execution for several Glauconitic gas and Cardium oil plays in Central Alberta. Randy is a very well-rounded engineer that is technically strong in production engineering and well optimization, reservoir engineering and reserves management, exploitation engineering and field development planning, oil & gas project economics, and project management of large development programs from concept to production. He is experienced in the brown-field development of mature oil and gas fields using horizontal multi-stage frack well designs. Randy particularly excels in working in cross-functional teams and often shows leadership in organizing project teams and delivering results while meeting deadlines. Randy has excellent communication and interpersonal skills, takes ownership of his work, and is open to learning and applying new concepts and technologies. Given Randy’s technical experience and soft skills, he would be a great fit for a Senior Production or Exploitation Engineering role within a junior, mid-cap, or large E&P company.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • FE Exam
    NCEES
    Sep, 2022
    - Nov, 2024
  • Power Engineering, 2nd Class
    ABSA, the pressure equipment safety authority
    May, 2021
    - Nov, 2024
  • Professional Engineer
    The Association of Professional Engineers and Geoscientists of Alberta (APEGA)
    Nov, 2002
    - Nov, 2024
  • Project Management Professional (PMP)
    Project Management Institute
    Oct, 2016
    - Nov, 2024
  • Power Engineering, 3rd Class
    ABSA, the pressure equipment safety authority
    May, 2019
    - Nov, 2024
  • Power Engineering, 4th Class
    ABSA, the pressure equipment safety authority
    Nov, 2018
    - Nov, 2024

Experience

    • Canada
    • Oil and Gas
    • 300 - 400 Employee
    • Plant Operator
      • May 2018 - Present

      - Operated steam generation and water treatment. - Ran inlet separation, compression, refrigeration, and condensate stabilization. - Sustained operations of the Sulphur Recovery Unit (SRU) and the Superclaus® Process. - Controlled product spec, LPG production and rail loading. - Mentored and trained new Operators. - Assisted with plant start-up and Turnarounds. - Contributed to safe plant operation and safety programs. - Operate and available for all positions within the Plant, now primarily Lead DCS and SCADA Panel Operator. Show less

  • Hiker Petroleum Inc.
    • Alberta, Canada
    • Consultant
      • Oct 2015 - Sep 2018

      -Managed and implemented components involved with new company start-ups. -Assisted technical and business teams with play and acquisition reviews and presentations. -Proposed and created databases for well inspections. -Researched and applied statistical data-set knowledge to product performance and technical strategies for corporate reviews. -Managed and implemented components involved with new company start-ups. -Assisted technical and business teams with play and acquisition reviews and presentations. -Proposed and created databases for well inspections. -Researched and applied statistical data-set knowledge to product performance and technical strategies for corporate reviews.

    • Canada
    • Oil and Gas
    • 200 - 300 Employee
    • Senior Exploitation Engineer
      • Oct 2011 - Sep 2015

      -Led the Pembina Cardium development program involving over 20 horizontal wells, battery / LACT upgrade, and EOR planning and implementation. -Researched thousands of data-sets involving costs, technical data, and product performance and applied business strategies to development. -Provided statistical, analytical and analog product performance and cost forecasting to establish business risk analysis for portfolio determination. -Applied new horizontal well technology to an old play to improve production from 0 to 3000 BOED. -Adapted risk analysis throughout project to changing conditions (well delivery, start-up timing, infrastructure improvements). -Involved with facility design, stream forecasting and P&ID review. -Liaised with Reservoir Engineers on waterflood evaluation, pattern design, and horizontal well forecasting. -Initiated reservoir pressure work to optimize capital allocation and development order. -Other projects involved Hoadley Glauconitic horizontal gas well development and reviews for Cherhill, Viking, and other plays. -Mentored two E.I.T.s and administrative personnel. Show less

    • Oil and Gas
    • 1 - 100 Employee
      • Dec 2007 - Oct 2011

      -Involved with new Garrington Cardium horizontal oil well development including a new oil battery / LACT site and gathering system.-Assisted with new well startups in Calgary and the field.-Optimized new and existing oil and gas fields.-Reduced operating costs and prepared annual budgets.-Created and applied RTA methods to improve cleanout workover success (estimated success >50%).-Reviewed and optimized pipeline hydraulic systems.-Managed several pressure survey projects on infrastructure and wellsites.-Reviewed and optimized compression systems, and led compressor projects to reduce costs.-Assisted with new and existing facility designs, P&IDs, and measurement reviews.-Led facility upgrades for environmental modifications such as tanks and flaring / incineration. Show less

      • Sep 2005 - Dec 2007

      -Responsible for approximately 40% of company assets (Company at 10,000 BOED size).-Developed and applied Pressure Depletion methods to optimize drilling locations.-Direct involvement with several annual budgeting methods, involving various costs and forecasts.-Reviewed, recommended, and managed recompletions and workovers on Alberta oil and gas assets.-Worked with Geologists on Alberta oil and gas plays for new and expanded fields.-Secured new corporate petroleum reserves from low-cost pressure and geological mapping methods.-Initiated quarterly and annual property monetary and reserve accretion.-Created and managed Joint Venture (JV) contracts involving JP05 calculations, technical and appendices updates, and contract creation for additional revenue streams.-Enhanced several Joint Venture and Regulatory requirements with decisions involving capital, operating costs, and corporate strategies (Coal Bed Methane - CBM).-Responsible for Joint Interest Billing (JIB) approval to ensure compliance and correct accounting.-Worked with JV Representatives on 13th month adjustments.-Led and assisted with Acquisition and Divestiture (A&D) evaluations and presentations.-Mentored one E.I.T. and one Engineering student. Show less

  • NAV Energy Trust
    • Calgary, Canada Area
    • Area Engineer
      • Sep 2004 - Sep 2005

      -Responsible for approximately 50% of company assets (Company at 8,000 BOED size). -Successfully planned and implemented full-scale development of sweet and sour gas and oil in the NW Alberta Hay-Zama Lakes region. Wells were drilled in water within the lake, in an ecologically sensitive area and involved consultation with the First Nations. -High involvement with deep, sour oil well drilling and sweet, shallow gas drilling. -Assisted mid-stream technical and business negotiation. -Responsible for approximately 50% of company assets (Company at 8,000 BOED size). -Successfully planned and implemented full-scale development of sweet and sour gas and oil in the NW Alberta Hay-Zama Lakes region. Wells were drilled in water within the lake, in an ecologically sensitive area and involved consultation with the First Nations. -High involvement with deep, sour oil well drilling and sweet, shallow gas drilling. -Assisted mid-stream technical and business negotiation.

    • Canada
    • Oil and Gas
    • 700 & Above Employee
      • Jul 2003 - Sep 2004

      -Contributed to the Team with land acquisition and strategies for heavy oil and shallow gas development.-Responsible for Reserves growth and A&D evaluation.-Planned and implemented "green field" development of shallow gas with the Calgary and field Team.-Expanded existing heavy oil and shallow gas plays.-Assisted with E.I.T. mentoring.

      • Jul 2002 - Jul 2003

      -Involved with cold heavy oil and shallow gas production methods in the Lloydminster area.-Optimized wellbores including uphole recompletion potential from well log analyses.-Led new and expanding developments and infrastructure planning.

    • Oil and Gas
    • 1 - 100 Employee
    • Production Engineer
      • Aug 2001 - Jun 2002

      -Recommended optimization strategies involving gathering systems, compressors, batteries, and unique artificial lift methods. -Quickly promoted from NE Alberta gas to George, Simonette, and Ante Creek fields. -Direct updates to Senior Management twice per week on Field Operations and downtime. -Recommended optimization strategies involving gathering systems, compressors, batteries, and unique artificial lift methods. -Quickly promoted from NE Alberta gas to George, Simonette, and Ante Creek fields. -Direct updates to Senior Management twice per week on Field Operations and downtime.

    • Canada
    • IT Services and IT Consulting
      • Jun 1999 - Aug 2001

      -Programmed, managed and sometimes supervised wellbore workovers on liquids-rich gas and oil wells in the Peace River Arch.-Successfully implemented field-wide plunger lift artificial lift integration.-Assisted with measurement compliance improvements.-Supervised numerous wireline, swabbing and coiled tubing cleanout operations.-Onsite for several service rig and drilling rig operations.-Mentored my first E.I.T. on engineering and field safety.

      • May 1997 - May 1999

      -Designed and oversaw gas testing and coiled tubing cleanout operations.-Created and optimized wellbore and pipeline models using simulation for oil, water and gas infrastructure.-Generated well databases to assist with ERCB corrective actions.-Properties included Peace River Arch, Swan Hills, northern Alberta, and Hayter.

Education

  • Southern Alberta Institute of Technology (SAIT)
    3rd Class Power Engineering
    2017 - 2018
  • Southern Alberta Institute of Technology (SAIT)
    4th Class Power Engineering
    2017 - 2017
  • University of Calgary
    Bachelor of Science (B.Sc.), Chemical Engineering with Internship
    1995 - 1999
  • Red Deer College
    Engineering
    1993 - 1995

Community

You need to have a working account to view this content. Click here to join now