Bechtel-Enka Joint Venture
-
Construction
-
400 - 500 Employee
-
Electrical & Instrumentation Superintendent
-
Jun 2022 - Present
https://www.tengizchevroil.com/ 3GP Punch List Execution Team (HIT Team) https://www.tengizchevroil.com/ 3GP Punch List Execution Team (HIT Team)
-
-
-
MET Engineering Construction and Mechanical Electrical Contracting Co.
-
Türkiye
-
Construction
-
1 - 100 Employee
-
Electrical and Instrumentation Deputy of Group Chief
-
May 2021 - Jun 2022
https://www.gazprom.com/projects/amur-gpp/ https://www.gazprom.com/projects/amur-gpp/
-
-
-
Ronesans Endustri Tesisleri
-
Türkiye
-
Construction
-
700 & Above Employee
-
Senior Electrical and Instrumentation Engineer
-
Nov 2018 - Dec 2020
-
-
-
DOĞUŞ İNŞAAT VE TİCARET A.Ş.
-
Türkiye
-
Construction
-
700 & Above Employee
-
Electrical Engineer
-
Feb 2018 - Jul 2018
-
-
-
Bureau Veritas Group
-
France
-
Environmental Services
-
700 & Above Employee
-
Instrumentation Quality Control Inspector
-
Oct 2017 - Feb 2018
Turkey Aegean Refinery (“STAR”) Turkey Aegean Refinery (“STAR”)
-
-
-
Tekfen Construction
-
Türkiye
-
Construction
-
700 & Above Employee
-
Instrumentation Engineer
-
Aug 2016 - Sep 2017
Client :BP Exploration (Shah Deniz) Limited (Sangachal/ Azerbaijan) Main Contractor :TEKFEN Project Name :Shah Deniz Stage 2 (SD2) Position :Instrumentation Engineer – (Terrace-1 Instrumentation Coordinator) Working Period :August 2016 – Ongoing Note :All Instrumentation works in Terrace-1. • Installation of Instrument and Tubing, • Cable Gland & Termination, • Review and Check to ILD, TLD, FGD, ETD, Hook-Up, P&ID project, • Control and Manage to Sub-Contractor and our own teams, • Raise STQ, DVR, OS&D etc. • Attend third party walkdown, • Check and Clear punch items, • Handover to DMC to client, • Preparation for work permits in Commissioning Area, • Check to Vendor package to eliminate problem, • Traced to GOC system about ITR status and take action to reach MC dates • Traced to project and consumables materials, requesting hotshot • Following to action tracker Show less
-
-
-
Astaldi
-
Italy
-
Construction
-
700 & Above Employee
-
Electrical Design Engineer
-
Jan 2016 - Aug 2016
Main Contractor :Astaldi-Turkerler Joint Venture Project Name :3566 Beds Etlik Integrated Health Campus Project Client :Turkish Ministry of Health Position :Electrical Design Engineer Working Period :January 2016 – August 2016 Note :Commissioned by Turkey's Health Ministry, the initiative involves designing, building, supplying with electrical and medical equipment and furnishings, and running a 3,500-bed hospital complex, divided into 8 healthcare facilities and a hotel, all totalling about 1,080,000 sqm. Show less
-
-
-
ETA Elektrik
-
Turkmenistan
-
Electrical Engineer
-
Jul 2011 - Sep 2015
Electrical Sub-Contractor :ETA Elektrik Project Name :KAR – Cardiology Hospital (Ashgabad/Turkmenistan) Main Contractor :GAP İnşaat Position :Electrical Site Engineer Working Period :December 2014 – October 2015 Note :Besides other items of electrical installation system of CCTV (Bosch), Card Access, Busbar (EAE), Fire&Announcement (ADEVA/System Sensor), Nurse Call System (ZKR), Stabilizer (Orthea), Central Clock System (Gorgy Timing), Operation Control Panel (Aktif), Switchgear (Aktif), Transformer 2x2000 kVA and 2x2500 kVA (SEA), Generator 2000 kVA and 2500 kVA (AKSA) etc. were performed by us. Project Name :SGE (Ashgabad/Turkmenistan) Main Contractor :Renaissance Construction Sub-Contractor :ETA Elektrik Position :Electrical Site Chief Working Period :November 2013 – October 2014 Note :Besides other items of electrical installation system of CCTV, card access, busbar, Fire&Announcement, glass break sensor etc. were performed by us. Project Name :270 Car Capacity Multilevel Parking (Ashgabad/Turkmenistan) Client :Ministry of Health in Turkmenistan Main Contractor :GAP İnşaat Electrical Sub-Contractor :ETA Elektrik Position :Electrical Site Chief Working Period :January 2012 – August 2012 (Work Completion) Project Name :Narhoz Institute Project (Ashgabad/Turkmenistan) Client :Central Bank of Turkmenistan Main Contractor :BELDA İnşaat Electrical Sub-Contractor :ETA Elektrik Position :Electrical Site Engineer Working Period :July 2011 - January 2012 (Work Completion) Note :Besides other items of electrical installation testing and commissioning of three units of substation were performed by us. Project Name :400-Bed Teaching Hospital (Basrah/Iraq) Client :Ministry of Health in Iraq Main Contractor :ACA Alliance Subcontractor :ATK İnşaat Electrical Sub-Contractor :ETA Elektrik Position :Electrical Site Chief Working Period :March 2011 - July 2011 Show less
-
-
-
Safer Grup
-
El Jadida Province, Morocco
-
Electrical Site Engineer
-
Jun 2013 - Sep 2013
Project Name :Jorf Lasfar Fertilizer ODI P1 Project (El Jadida/Morocco) Client :OCP Main Contractor :JACOBS Engineering SA Sub-Contractor :Daewoo E&C E&I Sub-Contractor :Safer Grup Position :Electrical Site Engineer Working Period :June 2013 – September 2013 Project Name :Jorf Lasfar Fertilizer ODI P1 Project (El Jadida/Morocco) Client :OCP Main Contractor :JACOBS Engineering SA Sub-Contractor :Daewoo E&C E&I Sub-Contractor :Safer Grup Position :Electrical Site Engineer Working Period :June 2013 – September 2013
-
-
-
Net Mühendislik Elektrik San. ve Tic. A.Ş
-
Türkiye
-
Construction
-
1 - 100 Employee
-
Heat Tracing Application Engineer
-
Aug 2012 - Mar 2013
Project Name :South Yoloten Gas Field Development (Yolöten/Mary/Turkmenistan) Client :TURKMENGAS Main Contractor :PETROFAC Sub-Contractor :TEKFEN İnşaat Electrical Sub-Contractor :Net Mühendislik Position :Heat Tracing Application Engineer Working Period :August 2012 – March 2013 Note :My team is responsible for electrical heat tracing and cathodic protection application on all site. Project Name :South Yoloten Gas Field Development (Yolöten/Mary/Turkmenistan) Client :TURKMENGAS Main Contractor :PETROFAC Sub-Contractor :TEKFEN İnşaat Electrical Sub-Contractor :Net Mühendislik Position :Heat Tracing Application Engineer Working Period :August 2012 – March 2013 Note :My team is responsible for electrical heat tracing and cathodic protection application on all site.
-
-