Kieran Doyle

Property Project Manager at Edinburgh Woollen Mill
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Ian Round

Kieran is an experienced project manager whom I had the pleasure of recruiting and working with at Gala Coral. Capable of dealing with multiple projects of all sizes and detail Kieran has excellent interpersonal skills and ability to work with those at all levels. An attention to the important detail in terms of quality and budget whilst always aware of the need to achieve pressurized timelines. I would not hesitate to have Kieran as part of my team.

Richard Bostock

Kieran is a well balanced project manager who has excellent personal skills and a strong understanding of how to drive a project to a successful outcome, i.e. time cost quality etc

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Retail
    • 200 - 300 Employee
    • Property Project Manager
      • May 2023 - Present

    • United Kingdom
    • Retail
    • 500 - 600 Employee
    • Property Project Manager
      • Jun 2021 - Apr 2023

      Nationwide role managing three full store refurbishments, a large number of re-purposing works bringing exited concession spaces back within Dobbies retail. Two restaurant and kitchen refreshes, and landlord enabling works for three vets practice concessions were also undertaken and managed through the full project life cycle. Pre construction processes for a Little Dobbies as well as overseeing numerous concession fit outs and minor works. All works required budgeting processes and ongoing… Show more Nationwide role managing three full store refurbishments, a large number of re-purposing works bringing exited concession spaces back within Dobbies retail. Two restaurant and kitchen refreshes, and landlord enabling works for three vets practice concessions were also undertaken and managed through the full project life cycle. Pre construction processes for a Little Dobbies as well as overseeing numerous concession fit outs and minor works. All works required budgeting processes and ongoing cost control, close co-ordination with internal store planners/external design teams, drafting phasing plans, stakeholder management including retail project managers and store teams, as well as overseeing contractors in live store environments. Was also part of the helpdesk maintenance team manning the phone lines in a regular shift pattern. Budgets ranged from £5K to £650K Show less Nationwide role managing three full store refurbishments, a large number of re-purposing works bringing exited concession spaces back within Dobbies retail. Two restaurant and kitchen refreshes, and landlord enabling works for three vets practice concessions were also undertaken and managed through the full project life cycle. Pre construction processes for a Little Dobbies as well as overseeing numerous concession fit outs and minor works. All works required budgeting processes and ongoing… Show more Nationwide role managing three full store refurbishments, a large number of re-purposing works bringing exited concession spaces back within Dobbies retail. Two restaurant and kitchen refreshes, and landlord enabling works for three vets practice concessions were also undertaken and managed through the full project life cycle. Pre construction processes for a Little Dobbies as well as overseeing numerous concession fit outs and minor works. All works required budgeting processes and ongoing cost control, close co-ordination with internal store planners/external design teams, drafting phasing plans, stakeholder management including retail project managers and store teams, as well as overseeing contractors in live store environments. Was also part of the helpdesk maintenance team manning the phone lines in a regular shift pattern. Budgets ranged from £5K to £650K Show less

    • United Kingdom
    • Retail
    • 700 & Above Employee
    • Regional Project Manager
      • Sep 2019 - Jun 2020

      Regional responsibility for a full spectrum of refurbishments ranging in budgets from £20k to £5M. Requires close co-ordination with estates, developers, finance, procurement, design, concession partners as well as a comprehensive list of external consultants and contractors. Retaining a strong project focus based on Next’s design parameters, cost control and budgeting based on lease events, my own programme of new builds, re-fits and store closures pre lockdown sat at approximately 30 stores. Regional responsibility for a full spectrum of refurbishments ranging in budgets from £20k to £5M. Requires close co-ordination with estates, developers, finance, procurement, design, concession partners as well as a comprehensive list of external consultants and contractors. Retaining a strong project focus based on Next’s design parameters, cost control and budgeting based on lease events, my own programme of new builds, re-fits and store closures pre lockdown sat at approximately 30 stores.

    • United Kingdom
    • Retail
    • 700 & Above Employee
    • Project Manager
      • Aug 2013 - Jan 2019

      Responsible for a multitude of shopfitting refurbishments including commercial, F&B, retail concessions, own brands and brand liaison throughout all Selfridges locations. Role consists of ensuring adherence to all Selfridges and statutory regulations during the design and fit-out process as well as full involvement from inception to handover. Projects ranging in budgets from £5,000 to £6M. Remit includes drafting budgets & capex applications, feasibility, planning applications, cost control… Show more Responsible for a multitude of shopfitting refurbishments including commercial, F&B, retail concessions, own brands and brand liaison throughout all Selfridges locations. Role consists of ensuring adherence to all Selfridges and statutory regulations during the design and fit-out process as well as full involvement from inception to handover. Projects ranging in budgets from £5,000 to £6M. Remit includes drafting budgets & capex applications, feasibility, planning applications, cost control, negotiation with and management of internal and external resources specifically working closely with Facilities Managers, Engineering, Procurement, Finance, Operations, buying and internal Design teams. Key projects: Satellite Head Office – Leicester. Budget £6.00M, 22,000 Sq.ft The existing offices were to be purchased as part of a CPO and as a consequence the project was devised in early 2015. The design & procurement phase process took over one year requiring very close coordination with resident departments of IT, finance & procurement. Fit out took 4 months with a strict handover deadline in July 2016. Level 4 “Masterplan” project – Birmingham Budget £6.00M, 58,000 Sq.ft A project that was conceived in early 2016, the design phase process took 18 months with the first brands within the first phase of five starting on site in August 2017. The five phases, consisted of high end brand fitouts, a new restaurant, shoe gallery, a dedicated accessories area and a high spec Personal Shopping suite, linking new tiled walkways throughout the floor plate. Required close coordination of a number of stakeholders ensuring excellent standards throughout the construction phase within live store environments. New Click & Collects throughout the Regional stores, new flooring accross the Selfridges food hall, Regional Toilet accomodation refurbishments, Selfridges Kitchen, various churn/enabling works projects & numerous consequential brand moves. Show less Responsible for a multitude of shopfitting refurbishments including commercial, F&B, retail concessions, own brands and brand liaison throughout all Selfridges locations. Role consists of ensuring adherence to all Selfridges and statutory regulations during the design and fit-out process as well as full involvement from inception to handover. Projects ranging in budgets from £5,000 to £6M. Remit includes drafting budgets & capex applications, feasibility, planning applications, cost control… Show more Responsible for a multitude of shopfitting refurbishments including commercial, F&B, retail concessions, own brands and brand liaison throughout all Selfridges locations. Role consists of ensuring adherence to all Selfridges and statutory regulations during the design and fit-out process as well as full involvement from inception to handover. Projects ranging in budgets from £5,000 to £6M. Remit includes drafting budgets & capex applications, feasibility, planning applications, cost control, negotiation with and management of internal and external resources specifically working closely with Facilities Managers, Engineering, Procurement, Finance, Operations, buying and internal Design teams. Key projects: Satellite Head Office – Leicester. Budget £6.00M, 22,000 Sq.ft The existing offices were to be purchased as part of a CPO and as a consequence the project was devised in early 2015. The design & procurement phase process took over one year requiring very close coordination with resident departments of IT, finance & procurement. Fit out took 4 months with a strict handover deadline in July 2016. Level 4 “Masterplan” project – Birmingham Budget £6.00M, 58,000 Sq.ft A project that was conceived in early 2016, the design phase process took 18 months with the first brands within the first phase of five starting on site in August 2017. The five phases, consisted of high end brand fitouts, a new restaurant, shoe gallery, a dedicated accessories area and a high spec Personal Shopping suite, linking new tiled walkways throughout the floor plate. Required close coordination of a number of stakeholders ensuring excellent standards throughout the construction phase within live store environments. New Click & Collects throughout the Regional stores, new flooring accross the Selfridges food hall, Regional Toilet accomodation refurbishments, Selfridges Kitchen, various churn/enabling works projects & numerous consequential brand moves. Show less

    • United Kingdom
    • Gambling Facilities and Casinos
    • 700 & Above Employee
    • Senior Project Manager
      • Sep 2008 - Jul 2013

      Reporting to the Head of Property, working closely with and providing advice to operational colleagues, the role consisted of maintaining the casino estate with a limited £1M budget, new builds, refurbishments, drafting divisional budgets upto £6M & subsequent capex applications, feasibility, licensing & planning applications, negotiation with property developers, project inception to completion and management of internal & external resources ensuring the Gala’s obligations towards CDM &… Show more Reporting to the Head of Property, working closely with and providing advice to operational colleagues, the role consisted of maintaining the casino estate with a limited £1M budget, new builds, refurbishments, drafting divisional budgets upto £6M & subsequent capex applications, feasibility, licensing & planning applications, negotiation with property developers, project inception to completion and management of internal & external resources ensuring the Gala’s obligations towards CDM & building legislation were met at all times. Show less Reporting to the Head of Property, working closely with and providing advice to operational colleagues, the role consisted of maintaining the casino estate with a limited £1M budget, new builds, refurbishments, drafting divisional budgets upto £6M & subsequent capex applications, feasibility, licensing & planning applications, negotiation with property developers, project inception to completion and management of internal & external resources ensuring the Gala’s obligations towards CDM &… Show more Reporting to the Head of Property, working closely with and providing advice to operational colleagues, the role consisted of maintaining the casino estate with a limited £1M budget, new builds, refurbishments, drafting divisional budgets upto £6M & subsequent capex applications, feasibility, licensing & planning applications, negotiation with property developers, project inception to completion and management of internal & external resources ensuring the Gala’s obligations towards CDM & building legislation were met at all times. Show less

    • Senior Project Manager
      • Feb 2004 - Jun 2008

      Selected Projects : The Manchester United Experience - Venetian Casino & Resort, Macau. Budget £6M, 18,000 Sq.ft • Project managed the delivery of 7,000 sq.ft of retail store (Phase 1), including logistical import planning of Nike fixtures from Shanghai • Handed over the challenging delivery of Phase 2, including 11,000 sq.ft of specialist museum exhibits, computer interactive games, extensive AV hardware/software, structural elements and installation of a lift. Venetian… Show more Selected Projects : The Manchester United Experience - Venetian Casino & Resort, Macau. Budget £6M, 18,000 Sq.ft • Project managed the delivery of 7,000 sq.ft of retail store (Phase 1), including logistical import planning of Nike fixtures from Shanghai • Handed over the challenging delivery of Phase 2, including 11,000 sq.ft of specialist museum exhibits, computer interactive games, extensive AV hardware/software, structural elements and installation of a lift. Venetian Leisure Centre - Casino & Resort, Macau Budget £10M, 45,000 Sq.ft • Managed a four stage project process includes Kids Facility, Gymnasium, F&B Outlets, Club lounge and retail space • Process included the delivery of one design and build contract, three traditional tendered contracts, management of multi-disciplinary consultant teams and UK based suppliers Motorola Concept Store - Dubai, Budget £0.3M, 3000 Sq.ft • Oversaw the fit-out of Dubai’s two storey flagship Motorola Concept Store Motorola Concept Store - Nigeria Budget £0.2M, 2000 Sqft • Effectively project managed the pilot store construction of Nigeria’s first dedicated Motorola concept store Motorola Concept Store Roll Out - Indian Sub-Continent Budgets varied • Successfully delivered a series of 12 Motorola Concept stores and a numerous Shop in Shops throughout India Adidas Asia Pacific Regional Store Roll Out - Asia Pacific. Budgets varied • Regional responsibility for the roll out of Adidas Sports Performance centres and Shop in Shops Secondment to Adidas - Bangkok, Thailand • Seconded to Adidas Thailand to identify current practices of store development within the Retail dept, implemented systems and best practices for successful store development throughout the country Sybase HK Ltd - Hong Kong Budget £1.5M, 18,000 sq.ft • Demanded high standards of fit-out, integration of a large server suite whilst maintaining limited downtime, significant communication and co-ordination with all stakeholders Show less Selected Projects : The Manchester United Experience - Venetian Casino & Resort, Macau. Budget £6M, 18,000 Sq.ft • Project managed the delivery of 7,000 sq.ft of retail store (Phase 1), including logistical import planning of Nike fixtures from Shanghai • Handed over the challenging delivery of Phase 2, including 11,000 sq.ft of specialist museum exhibits, computer interactive games, extensive AV hardware/software, structural elements and installation of a lift. Venetian… Show more Selected Projects : The Manchester United Experience - Venetian Casino & Resort, Macau. Budget £6M, 18,000 Sq.ft • Project managed the delivery of 7,000 sq.ft of retail store (Phase 1), including logistical import planning of Nike fixtures from Shanghai • Handed over the challenging delivery of Phase 2, including 11,000 sq.ft of specialist museum exhibits, computer interactive games, extensive AV hardware/software, structural elements and installation of a lift. Venetian Leisure Centre - Casino & Resort, Macau Budget £10M, 45,000 Sq.ft • Managed a four stage project process includes Kids Facility, Gymnasium, F&B Outlets, Club lounge and retail space • Process included the delivery of one design and build contract, three traditional tendered contracts, management of multi-disciplinary consultant teams and UK based suppliers Motorola Concept Store - Dubai, Budget £0.3M, 3000 Sq.ft • Oversaw the fit-out of Dubai’s two storey flagship Motorola Concept Store Motorola Concept Store - Nigeria Budget £0.2M, 2000 Sqft • Effectively project managed the pilot store construction of Nigeria’s first dedicated Motorola concept store Motorola Concept Store Roll Out - Indian Sub-Continent Budgets varied • Successfully delivered a series of 12 Motorola Concept stores and a numerous Shop in Shops throughout India Adidas Asia Pacific Regional Store Roll Out - Asia Pacific. Budgets varied • Regional responsibility for the roll out of Adidas Sports Performance centres and Shop in Shops Secondment to Adidas - Bangkok, Thailand • Seconded to Adidas Thailand to identify current practices of store development within the Retail dept, implemented systems and best practices for successful store development throughout the country Sybase HK Ltd - Hong Kong Budget £1.5M, 18,000 sq.ft • Demanded high standards of fit-out, integration of a large server suite whilst maintaining limited downtime, significant communication and co-ordination with all stakeholders Show less

    • Quantity Surveyor
      • 1996 - 2003

      Multitude of QS and contract administration within projects varying from a re-fit of a Visitor Centre (£0.7M) to cable routes, slope improvement Works, re-tiling of building facades and numerous new build & A&A Works ranging in Contract sums from £3M to £30M. Multitude of QS and contract administration within projects varying from a re-fit of a Visitor Centre (£0.7M) to cable routes, slope improvement Works, re-tiling of building facades and numerous new build & A&A Works ranging in Contract sums from £3M to £30M.

Education

  • University of Central Lancashire
    Bachelor of Science (BSc), Quantity Surveying
    1992 - 1996

Community

You need to have a working account to view this content. Click here to join now