Dinesh Sooriyaarachchi
Chief Engineer at The Golden Crown Hotel- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
The Golden Crown Hotel
-
Sri Lanka
-
Hospitality
-
1 - 100 Employee
-
Chief Engineer
-
Feb 2022 - Present
-
-
-
Illukkumbura Industrial Automation (Pvt) Ltd.
-
Sri Lanka
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Project Manager
-
Oct 2021 - Feb 2022
-
-
-
Lalan Group
-
Sri Lanka
-
Manufacturing
-
100 - 200 Employee
-
Project Engineer - Utility & Infrastructure
-
Sep 2020 - Feb 2022
Working as the site manager for the fire & life safety and online chlorination system. Do the design, execution, testing and commissioning of fire and life safety and online chlorination systems of all companies of the Lalan Group. Working as the site manager for the fire & life safety and online chlorination system. Do the design, execution, testing and commissioning of fire and life safety and online chlorination systems of all companies of the Lalan Group.
-
-
-
araliyagreenhills hotel
-
1 - 100 Employee
-
Chief Engineer
-
Aug 2018 - Sep 2020
-
-
-
Linc Facility Services
-
Facilities Services
-
400 - 500 Employee
-
Mechanical Supervisor (Doha International Airport )
-
Apr 2016 - Aug 2018
Supervise the maintenance of life and safety asserts. Supervise the maintenance of life and safety asserts.
-
-
-
Appogee International
-
Rosmeed Place, Colombia
-
Chief Engineer
-
Sep 2015 - Apr 2016
Working as the Chief Engineer / Head of the Engineering Department. Working as the Chief Engineer / Head of the Engineering Department.
-
-
-
Arabian Castles for General Contracting (ACGC)
-
Saudi Arabia
-
Facilities Services
-
400 - 500 Employee
-
MEP/HVAC Supervisor.
-
Apr 2014 - Aug 2015
1. Supervising the all renovation and maintenance of Mechanical, Electrical, Plumbing and HVAC jobs in the Saudi Royal Air Force Base at Taif . 2. Coordinate with subcontractors and supervice their jobs. 3. Coordinate with Saudi Aramco and Air Base. 4. Resolve site technical and design issues. 5. Ensure the quality of the job. 6. Ensure the safety of work site. 7. Preparation of Quantity Take-off, Material Take-off, Purchas requisitions and follow up material delivery and quality and correctness of delivery. 8. Preparing the project reports (such as manpower allocation, material handling, transport, project schedule, planning and estimation, memos and minutes of the meeting, ect.) 9. Monitoring the site progress and update the progress on project schedule by MS-Projects. 10. Implement production methods and plane day to day site activities according to the current situation and reorganize the manpower allocation, team task and target. 11. Preparing Work Notifications, Site Quarries, RFIs and participate for testing and inspections. 12. Follow up project specifications, production methods, standers and quality policy. 13. Engage and coordinate with design team for preparation of drawings and designing for all disciplines (Architectural, Mechanical, Electrical, Plumbing and HVAC) Show less
-
-
-
ALS Engineering (Pvt) Ltd.
-
Colombo, Sri Lanka.
-
Service Engineer.
-
Aug 2013 - Mar 2014
ALS Engineering is authorised dealer for KIRLOSKAR water pumps in Sri Lanka and I worked for them as the Service Engineer. After sales services, Inspection of installation, truble shooting and repairing and commissining are can be mentioned as key responsibilities of my job. ALS Engineering is authorised dealer for KIRLOSKAR water pumps in Sri Lanka and I worked for them as the Service Engineer. After sales services, Inspection of installation, truble shooting and repairing and commissining are can be mentioned as key responsibilities of my job.
-
-
-
-
Engineer - Earl's Regency Hotel (*****).
-
Dec 2012 - Aug 2013
Engineer - Earl's Regency hotel (5star), Kandy, Sri Lanka. Key Skills, 01. Manage building services. 02. Maintain water treatment and sawage plant. 03. Sustainability management. 04. Project management. Engineer - Earl's Regency hotel (5star), Kandy, Sri Lanka. Key Skills, 01. Manage building services. 02. Maintain water treatment and sawage plant. 03. Sustainability management. 04. Project management.
-
-
-
Voltas - Qatar
-
Qatar
-
Mechanical Supervisor
-
Jan 2011 - Jun 2012
In this company, I was working as a Site Engineer - Mechanical. First I was in the section of installation of HVAC systems and afterword worked in the section "Specialist Systems". Under the HVAC section, done the installation of complete air conditioning and ventilation duct work from AHU to final diffuser and chilled water piping including HVAC risers as well as installation and tenting of HVAC and Chiller plant rooms and Pump houses (Central Services Building). In the Specialist Systems, oversaw installation,testing and commissioning of, 01. Fuel Handling System Installation and testing of under ground and over ground fuel pipe work (UPP) Installation of Bulk, Buffer and Day tanks Installation of Generators Installation piping Testing and commissioning 02. Steam System Installation of steam piping, daily hot water stations, clean steam generators and boiler room installations. 03. LPG piping Installation of LPG piping from storage tank to burners of Boilers. 04. FM - 200 and Foam Protection system Installation and testing. 05. Medical gas Installation of all medical gas, compressed air and vacuum piping and equipment. Show less
-
-
-
Star of Kingdom
-
Saudi Arabiya
-
Site Engineer
-
Dec 2007 - Nov 2009
a. MANAGE FABRICATION, ERECTION AND COMMITIONING THE BELT CONVEYOR NETWORK FOR IRON PELLETS CONVEYORS OF “ALTUWAIRQI PORTFACILITIES” PROJECT AT DAMMAM PORT. b. MANAGE INSTALLATION AND ALIGNMENT OF BELT DRIVE SYSTEM AND BELTS OF THE CONVEYOR NETWORK OF “ AL TUWAIRQI PORT FACILITIES” PROJECT. c. MANAGE FBRICATION AND ERECRION OF ENGINEERING SERVICES SUPLY PIPE LINES OF “ALTUWAIRQI HEVY INDUSTRIES”, DAMMAM. d. ERECTION OF “GAS CLEANING PLANT 01 & 02” (CAPACITY – 29400 m3/min.) OF “KINGDOM IRON AND STEEL HOLDING COMPANY”. e. MANAGE THE PROJECT, ERECTION OF “STORAGE SILO STRUCTURE” OF SAUDI KAYAN POLYCARBONATE PLANT OF SAUDI KAYAN PETROCHEMICAL PROJECT. f. EXECUTE THE PROJECT OF DUCT LINES FABRICATIOB FOR THE MA’ADEN PHOSPHATE PROJECT, DAP GRANULATION PLANT, DEDUSTING SYSTEM. g. MANAGE SUPPORT FABRICATION FOR EVEPORATORS OF MARAFIQE SEA WATER DESOLINATION PROJECT. Show less
-
-
-
Haji Commercial Co. Ltd. - Dubai
-
Dubai, UAE
-
AutoCAD Draughtsmen - L.V.S.
-
Nov 2006 - Jun 2007
01. Costing and estimation 02. Design of low voltage switchgear panelboards 03. Preparing shop and as built drawings 04. Preparing project submittals 05. Engineering coordination 06. Customer care 01. Costing and estimation 02. Design of low voltage switchgear panelboards 03. Preparing shop and as built drawings 04. Preparing project submittals 05. Engineering coordination 06. Customer care
-
-
-
Mec Fab Engineering
-
Sri Lanka
-
Site Engineer - Mechanical
-
Dec 2002 - Nov 2006
01. Costing and estimation 02. Planing and Scheduling 03. Designing of steel fabrications 04. Installation and testing of process piping in ships 05. Steel fabrications of ships 01. Costing and estimation 02. Planing and Scheduling 03. Designing of steel fabrications 04. Installation and testing of process piping in ships 05. Steel fabrications of ships
-
-
Education
-
Technicala College - Kanady (Precent - College of Education Kandy)
National Certificate for Industrial Techniciance (NCIT), Mechanical Engineering -
City & Guilds
Advanced Diploma in Refrigeration and Air Conditioning, Heating, Ventilation, Air Conditioning and Refrigeration -
A. Rathnayaka Central College
Advanced Level, Mathematics -
Rice University Graduate and Postdoctoral Studies
Project Management : Creating the WBS., Project Management -
Rice University Graduate and Postdoctoral Studies
Project Management, Creating WBS -
Rice University Graduate and Postdoctoral Studies
Engineering Project Management - Initiating and Planning., Project Management